HomeMy WebLinkAboutNCC230272_Site Plan or Location Map_20230131W
Z
f
�
�
O
O
o
W
00
0
IL
o
ju
so-31 a
muuuuuu
ill o..
wam , o ,
iii�vii muuuimuuui ii�iiu illlItiall um uuui
0
1 E 5
o b b Il e
0 0 0 0 0 o go e^
v 1.0*
i
Cabarrus County PubHo Library
1+1
!I■I - - _ Imo•- _ —_ — -- — — -
■I■■■I�ili�imi■I■■II�Ii 1_I�IJII � =i l���l�l�l■JI — I — I■
_I�I�I��ol�lwwll�lwll■�I�II■�ullliiiiiiiiiiii■i� � �=��ITrl�l'I�I���I■
I I I I
r
I
I U)
L
I
PHASING SEQUENCE: I U
NOTE: CONTRACTOR TO PROVIDE DETAILED TRAFFIC CONTROL PLANS FOR REVIEW PRIOR TO START OF CONSTRUCTION.
SECTION 19: AREA 19 MAY BE INSTALLED DURING ANY PHASE.
WORK TO INCLUDE: DEMOLITION OF SIDEWALK AND CURB, INSTALLATION OF HC RAMPS, REPLACEMENT OF SIDEWALK, CURB, MODIFICATION OF EXISTING
UNDERGROUND VAULTS/BOXES AND INSTALLATION OF ALL STREETSCAPE RELATED APPURTENANCES
NOVILPFTS
CONSTRUCTION PROJECT-
ESTIMFtTED COMPLETION
SEPTEOBER 2022
0
r�ii� ■��i ism
0
0f o
PEDESTRIAN ACCESS: MAINTAIN ACCESS ON ONE SIDE OF THE ROAD, THE OPPOSITE SIDE OF THE ACTIVE WORK AREA MUST REMAIN OPEN 0�l
WITH A FIXED SURFACE. 0 0
TRAFFIC CONTROL: MAINTAIN ONE LANE OPEN DURING WORKING HOURS. TWO LANES OPEN AFTER WORKING HOURS.
PHASE 1 : Phasing of Underground Utilities and Infrastructure — The phasing of the underground utilities and infrastructure
extensions/modifications is to be closely coordinate with the designated City Construction Inspector, Water
SECTIONS Al. B2. AND C3: Resources, the applicable City Departments, and outside agencies. The sequencing and phasing of the
underground utilities and infrastructure extensions and modifications must minimize the disruptions to the
WORK TO INCLUDE: TRENCH INSTALLATION OF DOMESTIC WATERLINE MAIN AND VALVES. existing customer's service and operations; and minimize the number temporary fittings and interim
interconnections to the existing active mains.
PEDESTRIAN ACCESS: MAINTAIN PEDESTRIAN ACCESS ACROSS UNION AT MID —BLOCK CROSSING. DESIGNATED 5.0' PEDESTRIAN ACCESS TO
STORE FRONTS TO REMAIN OPEN.
TRAFFIC CONTROL:
BARBRICK TO BE CLOSED BETWEEN MARKET AND UNION.
CLOSE UNION FROM BARBRICK TO MID —BLOCK CROSSING. ALLOW PARKING FROM MID —BLOCK TO CABARRUS UNTIL SUBSTANTIAL
INSTALLATION IS COMPLETE, THEN CLOSE FROM MID —BLOCK CROSSING TO CABARRUS. DETOUR TRAFFIC TO SPRING STREET AND CORBAN
AVENUE.
SECTION Al
WORK TO INCLUDE:
INSTALLATION OF STORMWATER PIPING. DEMOLITION OF SIDEWALK AND ROADWAY, MODIFICATION AND REPLACEMENT OF EXISTING
UNDERGROUND VAULTS, UTILITY BOXES AND METERS, REMOVAL AND REPLACEMENT OF SANITARY SEWER SERVICES, REMOVAL AND
REPLACEMENT OF DOMESTIC WATER SERVICE CONNECTIONS, REPLACEMENT OF SIDEWALK, INSTALLATION OF ALL STREETSCAPE RELATED ITEMS,
INSTALL DUCT BANKS WITH CONDUITS AND WIRING, INSTALL RECEPTACLES, NEW POLE LIGHTS AND FOUNDATIONS, INSTALL HANDHOLES, AND
MANHOLES, MODIFICATION OF ROAD GRADES, AND ROADWAY PAVING TO BASE COURSE OF ASPHALT.
PEDESTRIAN ACCESS: DESIGNATED 5.0' PEDESTRIAN ACCESS TO STORE FRONTS TO REMAIN OPEN. AT TIME OF REPLACEMENT OF 5.0, ACCESS STRIP, THE
OPPOSITE SIDE OF ACTIVE WORK AREAS MUST REMAIN OPEN WITH A FIXED SURFACE.
TRAFFIC CONTROL:
ONE LANE OF TRAFFIC TO REMAIN OPEN DURING WORK HOURS ON MARKET STREET. NO ON STREET PARKING, UTILIZE AREA TO MAINTAIN TWO
WAY TRAFFIC AFTER WORK HOURS. CONTRACTOR TO WORK WITH ADJACENT BUSINESSES TO KEEP ACCESS TO PARKING AREAS.
BARBRICK TO BE CLOSED BETWEEN MARKET AND UNION.
PHASE 2:
SECTIONS D4, E5, AND
H8
SECTION D4:
WORK TO INCLUDE:
TRENCH INSTALLATION OF WATERLINE MAIN AND VALVES.
TRAFFIC CONTROL:
INTERSECTION OF UNION AND CABARRUS TO BE TEMPORARILY CLOSED FOR TRENCHING ACTIVITIES AND REOPENED FOR TRAFFIC.
DETOUR TRAFFIC TO CORBAN AVENUE.
SECTION E5: WORK TO
PROCEED AFTER INTERSECTION OF CABARRUS AND UNION IS REOPENED
WORK TO INCLUDE:
TRENCH INSTALLATION OF WATERLINE MAIN, SERVICES, AND VALVES.
TRAFFIC CONTROL:
UNION STREET FROM KILLARNEY AVENUE NE TO CABARRUS AVENUE TO BE TO BE TEMPORARILY CLOSED FOR TRENCHING ACTIVITIES DURING
THE DAY AND REOPENED TO TRAFFIC AFTER WORK HOURS AND WEEKENDS.
DETOUR TRAFFIC TO SPRING STREET AND CHURCH STREET.
SECTION H8: WORK TO
PROCEED AFTER INTERSECTION OF CABARRUS AND UNION IS REOPENED
WORK TO INCLUDE:
TRENCH INSTALLATION OF WATERLINE MAIN, SERVICES AND VALVES.
TRAFFIC CONTROL:
UNION FROM BARBRICK TO WATERLINE CONNECTIONS AT CORBAN INTERSECTION, TO BE CLOSED TO PUBLIC USE AND ONE LANE
TO REMAIN OPEN FOR CONSTRUCTION TRAFFIC. DURING WORK HOURS FOR TRENCHING ACTIVITIES DURING THE DAY AND REOPENED TO
TRAFFIC AFTER WORK HOURS AND WEEKENDS. TEMPORARY CLOSURE OF UNION AND CORBAN INTERSECTION DURING THE DAY AND
REOPENED AFTER WORK HOURS.
DETOUR TRAFFIC TO CABARRUS AVENUE.
PHASE 3:
SECTIONS Al. B2. C3, F6, G7 AND H8:
SECTIONS Al. B2 AND C3:
WORK TO INCLUDE:
DEMOLITION OF SIDEWALK AND ROADWAY, MODIFICATION AND REPLACEMENT OF EXISTING UNDERGROUND VAULTS, UTILITY BOXES AND
METERS, REMOVAL AND REPLACEMENT OF SANITARY SEWER SERVICES, INSTALLATION AND REMOVAL OF DOMESTIC WATER SERVICE
CONNECTIONS, REPLACEMENT OF SIDEWALK AND CURB, INSTALL SOIL CELLS AND IRRIGATION CONDUIT, INSTALLATION OF ALL STREETSCAPE
RELATED ITEMS. INSTALL ELECTRICAL SERVICE, REMOVAL OF EXISTING STREETLIGHT FOUNDATIONS, INSTALL DUCT BANKS WITH
CONDUITS AND WIRING, INSTALL RECEPTACLES, NEW POLE LIGHTS AND FOUNDATIONS, INSTALL HANDHOLES, MANHOLES, AND FIBER
DUCT BANKS. INSTALLATION OF STORM DRAINAGE AFTER WATER MAIN AND ALL PROPOSED SERVICE CONNECTIONS ARE OPERATIONAL AND
EXISTING WATERLINES HAVE HAVE BEEN REMOVED, MODIFICATION OF ROAD GRADES, ROADWAY PAVING TO BASE COURSE OF ASPHALT.
SECTIONS F6, G7 AND H8:
WORK TO INCLUDE:
COMPLETE INSTALLATION OF STORMWATER PIPING, AFTER PROPOSED WATERLINE AND SERVICES ARE ACTIVE. REMOVAL OF ANY INACTIVE
WATERLINES THAT ARE IN CONFLICT WITH THE STORMWATER INSTALLATION.
PEDESTRIAN ACCESS: DESIGNATED 5.0' PEDESTRIAN ACCESS TO STORE FRONTS TO REMAIN OPEN. AT TIME OF REPLACEMENT OF 5.0, ACCESS STRIP, THE
OPPOSITE SIDE OF ACTIVE WORK AREAS MUST REMAIN OPEN WITH A FIXED SURFACE. MID BLOCK PEDESTRIAN ACCESS TO
REMAIN OPEN AS LONG AS POSSIBLE THEN ROUTE PEDESTRIANS TO INTERSECTIONS FOR UNION STREET AND CABARRUS AVENUE AND
UNION STREET AND CORBAN AVENUE FOR CROSSINGS.
TRAFFIC CONTROL:
CLOSE UNION FROM BARBRICK TO INTERSECTION OF UNION STREET AND CABARRUS AVENUE. BARBRICK AVENUE SW TO CORBAN AVENUE TO
REMAIN OPEN FOR CONSTRUCTION TRAFFIC TO COURTHOUSE
DETOUR TRAFFIC TO SPRING STREET.
• Y ' 1
.
: . .. COURTHOUSE
CABARRUS
CONSTRUCTION
.• ESTIMATED
PROJECT-
COMPLETION 1
I
Calbarrus County• • -
�
RotWT
IIIIII
4401Ell
I�]1\�
J
�I��T I'iTT�� � 1
-- - -- — --- — —
11■
�
�y���jl i1�
I
n—u
=
-
■I■I■
,x'
I
union
otreet
ill■
'�
11�1�1 il�w _ I!_11
■ r yr .r - - -
if
--
Tri �TF 1
%'' -�
�. —
.... ... .. I�-
I17
..
C
J
—
• •
li�
I
l
/
WIROJECT
-
�
ESTIMATEDI
III_
��.
■
■:
COMPLETION
I�
-.
I
I
°
JUNE 2021
III
.
_
•
I�NiF
1�
NOVI FLATS
CONSTRUCTION
PROJECT -
ESTIMATED
COMPLETION
MAY 2022
SPRING STREET
PHASE 4:
SECTION D4 AND E5:
SECTION D4:
WORK TO INCLUDE: DEMOLITION OF SIDEWALK AND ROADWAY, MODIFICATION AND REPLACEMENT OF EXISTING UNDERGROUND VAULTS, UTILITY BOXES AND
METERS, INSTALLATION OF SANITARY SEWER, REMOVAL AND ABANDONMENT OF EXISTING SANITARY SEWER, REMOVAL OF EXISTING
WATER MAINS, REPLACEMENT OF SIDEWALK AND CURB, INSTALL SOIL CELLS AND IRRIGATION CONDUIT, INSTALLATION
OF ALL STREETSCAPE RELATED ITEMS. INSTALL ELECTRICAL SERVICE, REMOVAL OF EXISTING STREETLIGHT FOUNDATIONS, INSTALL
DUCT BANKS WITH CONDUITS AND WIRING, INSTALL RECEPTACLES, NEW POLE LIGHTS AND FOUNDATIONS, INSTALL HANDHOLES,
MANHOLES, AND FIBER DUCT BANKS. INSTALLATION OF STORM DRAINAGE AFTER WATER MAIN AND ALL PROPOSED SERVICE
CONNECTIONS ARE OPERATIONAL. MODIFICATION OF ROAD GRADES, ROADWAY PAVING TO BASE COURSE OF ASPHALT.
***CONTRACTOR TO COORDINATE WITH CITY FOR INSTALLATION OF MAST ARM POLE AND PEDESTRIAN HEADS AT INTERSECTION.
INSTALLATION OF PEDESTRIAN HEADS NOT IN CONTRACT.
SECTION E5:
WORK TO INCLUDE: INSTALLATION OF STORMWATER PIPES AND STRUCTURES
PEDESTRIAN ACCESS: MAINTAIN ACCESS ON ONE SIDE OF THE ROAD, THE OPPOSITE SIDE OF ACTIVE WORK AREAS MUST REMAIN OPEN
WITH A FIXED SURFACE.
TRAFFIC CONTROL: INTERSECTION OF UNION STREET AND CABARRUS AVENUE CLOSED. ALLOW ACCESS FROM KILLARNEY AVENUE NE TO CHURCH
DRIVEWAY ENTRANCE.
DETOUR TRAFFIC TO SPRING STREET AND CORBAN AVENUE.
PHASE 5:
SECTION E5:
WORK TO INCLUDE: DEMOLITION OF SIDEWALK AND ROADWAY, MODIFICATION AND REPLACEMENT OF EXISTING UNDERGROUND VAULTS, UTILITY BOXES AND
METERS, INSTALLATION OF SOIL CELLS, REPLACEMENT OF SIDEWALK AND CURB, SOIL CELLS, IRRIGATION CONDUIT, INSTALLATION
OF ALL STREETSCAPE RELATED ITEMS. INSTALL ELECTRICAL SERVICES, REMOVAL OF STREETLIGHT FOUNDATIONS, INSTALL DUCT
BANKS WITH CONDUITS AND WIRING, INSTALL RECEPTACLES, NEW POLE LIGHTS AND FOUNDATIONS, INSTALL HANDHOLES,
MANHOLES, AND FIBER DUCT BANKS. INSTALLATION OF STORM DRAINAGE AFTER WATER MAIN AND ALL PROPOSED SERVICE
CONNECTIONS ARE OPERATIONAL. MODIFICATION OF ROAD GRADES, ROADWAY PAVING TO BASE COURSE OF ASPHALT.
PEDESTRIAN ACCESS: MAINTAIN ACCESS ON ONE SIDE OF THE ROAD, THE OPPOSITE SIDE OF ACTIVE WORK AREAS MUST REMAIN OPEN
WITH A FIXED SURFACE.
TRAFFIC CONTROL: ROAD CLOSURE FROM KILLARNEY AVENUE NE TO CABARRUS AVENUE. DETOUR TRAFFIC TO CABARRUS AVENUE.
CAI,?o
1240 19th Street Lane NW
Hickory, NC 28601 '�•
828.328.2024
NC Firm License # C-0459 '� Can; • j
mcgillassociates.com ,20
NO. DATE BY
PHASE 6:
SECTIONS G7, H8
AND J10: WORK CONCURRENT
SECTION H8:
WORK TO INCLUDE: DEMOLITION OF SIDEWALK AND ROADWAY, MODIFICATION AND REPLACEMENT OF EXISTING UNDERGROUND VAULTS,
UTILITY BOXES AND METERS, REMOVAL OF DOMESTIC WATER SERVICE CONNECTIONS, INSTALLATION OF SOIL CELLS AND
IRRIGATION CONDUIT, REPLACEMENT OF SIDEWALK AND CURB, INSTALLATION OF ALL STREETSCAPE RELATED ITEMS.
INSTALL ELECTRICAL SERVICES, REMOVAL OF EXISTING STREETLIGHT FOUNDATIONS, INSTALL DUCT BANKS WITH
CONDUITS AND WIRING, INSTALL RECEPTACLES, NEW POLE LIGHTS AND FOUNDATIONS, INSTALL HANDHOLES, MANHOLES,
AND FIBER DUCT BANKS. MODIFICATION OF ROAD GRADES, ROADWAY PAVING TO BASE COURSE OF ASPHALT.
***CONTRACTOR TO COORDINATE WITH CITY FOR INSTALLATION OF PEDESTRIAN HEADS AT INTERSECTION. INSTALLATION
OF PEDESTRIAN HEADS NOT IN CONTRACT.
PEDESTRIAN
ACCESS: DESIGNATED 5.0' PEDESTRIAN ACCESS TO STORE FRONTS TO REMAIN OPEN. AT TIME OF REPLACEMENT OF 5.0'
ACCESS STRIP, THE OPPOSITE ROADWAY SIDE MUST REMAIN OPEN WITH A FIXED SURFACE. COORDINATE WITH
CONTRACTOR FOR THE COURTHOUSE RENOVATION PROJECT.
TRAFFIC CONTROL: TEMPORARY CLOSURE FROM BARBRICK AVENUE SW TO CORBAN STREET EXCEPT FOR CONSTRUCTION TRAFFIC.
BARBRICK AVENUE SW TO REMAIN OPEN TO ONE WAY TRAFFIC TO MARKET STREET.
DETOUR TRAFFIC TO CABARRUS AVENUE.
SECTION G7:
WORK TO INCLUDE: MODIFICATION OF ROADWAY GRADES, INSTALLATION OF UNDERGROUND UTILITIES, AND INSTALLATION OF TEMPORARY
BASE COURSE OF ASPHALT. ALL OTHER INSTALLATION OF DESIGN FEATURES, EXCEPT UNDERGROUND UTILITIES, TO BE
INSTALLED AT END OF COURTHOUSE RENOVATION IN 2024 — NOT IN CONTRACT.
TRAFFIC CONTROL: TEMPORARY CLOSURE FROM BARBRICK AVENUE SW AND CORBAN AVENUE.
DETOUR TRAFFIC TO CABARRUS AVENUE.
SECTION J10:
PHASE TO BE SCHEDULED WHEN NOVI LOFTS HAS COMPLETED CONSTRUCTION AND BARBRICK IS NO LONGER BEING USED FOR CONSTRUCTION
ACCESS — EXPECTED COMPLETION MAY 2022.
WORK TO INCLUDE: DEMOLITION OF SIDEWALK, REPLACEMENT OF SIDEWALK, MODIFICATION OF EXISTING UNDERGROUND VAULTS,
INSTALLATION OF ALL STREETSCAPE RELATED ITEMS.
PEDESTRIAN ACCESS: MAINTAIN ACCESS ON ONE SIDE OF THE ROAD, THE OPPOSITE SIDE MUST REMAIN OPEN WITH A FIXED SURFACE.
TRAFFIC CONTROL: MAINTAIN ONE LANE OPEN TO FROM MARKET STREET TO SPRING DURING WORKING HOURS. TEMPORARY CLOSURE FOR
INSTALLATION OF CROSSWALK PAVERS. OPEN LANES TO SPRING STREET AFTER WORK HOURS.
NO PUBLIC PARKING.
PHASE 7:
SECTION F6:
PHASE TO BE SCHEDULED
WHEN MEANS PLAZA IS NO LONGER BEING UTILIZED AS A CONSTRUCTION ENTRANCE FOR THE COURTHOUSE
RENOVATION PROJECT. EXPECTED
COMPLETION SPRING OF 2022.
WORK TO INCLUDE:
DEMOLITION OF SIDEWALK AND ROADWAY, MODIFICATION AND REPLACEMENT OF EXISTING UNDERGROUND VAULTS,
UTILITY BOXES AND METERS, INSTALLATION OF SOIL CELLS, IRRIGATION CONDUIT, REPLACEMENT OF SIDEWALK AND
CURB, INSTALLATION OF ALL STREETSCAPE RELATED ITEMS. INSTALL ELECTRICAL SERVICE AT REMOVAL OF EXISTING
LIGHTING AND FOUNDATIONS ALONG SECTION, INSTALL DUCT BANKS WITH CONDUITS AND WIRING, INSTALL RECEPTACLES,
NEW POLE LIGHTS AND FOUNDATIONS, INSTALL HANDHOLES, MANHOLES, AND FIBER DUCT BANKS. INSTALLATION OF
STORM DRAINAGE AFTER WATER MAIN AND ALL PROPOSED SERVICE CONNECTIONS ARE OPERATIONAL. MODIFICATION OF
ROAD GRADES.
PEDESTRIAN ACCESS: MAINTAIN ACCESS ON ONE SIDE OF THE ROAD, THE OPPOSITE SIDE OF ACTIVE WORK AREA MUST REMAIN OPEN WITH
A FIXED SURFACE.
TRAFFIC CONTROL:
MAINTAIN ONE LANE OPEN TO MARKET DURING WORKING HOURS. TEMPORARY CLOSURE OF UNION FOR INSTALLATION OF
PAVERS.
DETOUR TRAFFIC TO MARKET.
PHASE 8:
ALL SECTIONS:
WORK TO INCLUDE:
ROADWAY PAVING FOR SURFACE COURSE OF ASPHALT, STRIPING, LANDSCAPE INSTALLATION, IRRIGATION, SITE
FURNITURE, PUNCH LIST, AND FINAL CLEAN UP.
TRAFFIC CONTROL:
ONE LANE OPEN DURING WORK HOURS
DETOURS TO BE PROVIDED BY CONTRACTOR DURING PAVING OPERATIONS
TWO LANES OPEN DURING NON WORK HOURS
NO PUBLIC PARKING
UNION STREET IMPROVEMENTS
CITY OF CONCORD
CABARRUS COUNTY, NORTH CAROLINA
DESCRIPTION
NOT TO SCALE
OFFICE MANAGER DESIGNER
D.G. CHAPMAN C.L. CRANWILL
PROJECT MANAGER REVIEWER
M.J. NORRIS B. ROARK
DATE
J U LY 2021
SEQUENCING
PROJECT #
19.01726
FUNDING #
N/A
SHEET
G=003