MEMORANDUM:
NORTH CAROLINA
Environmental Quality
January 31, 2023
FROM: Gregg Bodnar, Assistant Major Permits Coordinator
NCDEQ - Division of Coastal Management
400 Commerce Ave., Morehead City, NC 28557
Fax: 252-247-3330 (Courier 04-16-33)
gregq.bodnar(cDncdenr.gov
SUBJECT: CAMA Major Permit Application Review
Applicant: Baily Point Subdivision HOA
Project Location: Lot #40 Baily Point Subdivision SR 1725
Proposed Project: Bailey Point Subdivision HOA proposes to install a boat ramp.
Please indicate below your agency's position or viewpoint on the proposed project and
return this form to Gregg Bodnar at the address above by February 22, 2023. If you have any
questions regarding the proposed project, contact Ashley Grandy (252) 948-3854 when appropriate, in-
depth comments with supporting data is requested.
REPLY: This agency has no objection to the project as proposed.
"Additional comments may be attached"
This agency has no comment on the proposed project.
This agency approves of the project only if the recommended changes
are incorporated. See attached.
This agency objects to the project for reasons described in the attached
comments.
PRINT NAME
AGENCY
SIGNATURE
DATE
D EQ �� North Carolina Department of Environmental Quality I Division of Coastal Management
Washington Office 1 943 Washington Square Mall I Washington, North Carolina 27889
Department ofEmvonmeme r� /'� 252.946.6481
ROY COOPER
Governor
ELIZABETH S. BISER
Secretary
BRAXTON DAVIS
Director
MEMORANDUM:
NORTH CAROLINA
E'nylronmen tal Quality
January31, 2023
FROM: Gregg Bodnar, Assistant Major Permits Coordinator
NCDEQ - Division of Coastal Management
400 Commerce Ave., Morehead City, NC 28557
Fax: 252-247-3330 (Courier 04.16-33)
gregg.bodnar@ncdenr.gov
SUBJECT: CAMA Major Permit Application Review
Applicant: Bally Point Subdivision HOA
Project Location: Lot #40 Baily Point Subdivision SR 1726
Proposed Project: Bailey Point Subdivision HOA proposes to install a boat ramp.
Please indicate below your agency's position or viewpoint on the proposed project and
return this form to Grego Bodnar at the address above by February 2Z 2023. If you have any
questions regarding the proposed project, contact Ashley Grandy (252) 948-3854 when appropriate, in-
depth comments with supporting data is requested.
REPLY: This agency has no objection to the project as proposed.
"*Additional comments may be attached"
PRINT NAME
AGENCY
SIGNATURE
DATE
This agency has no comment on the proposed project.
This agency approves of the project only if the recommended changes
are incorporated. See attached.
This agency objects to the project for reasons described in the attached
comments.
P—
North �Carolina Department or Environmental Quality I Division of Coastal Management
Washington Office f 943 Washington Square Mal! I Washington, North Carolina 27889
252.946.6481
DIVISION OF COASTAL MANAGEMENT
FIELD INVESTIGATION REPORT
1. APPLICANT'S NAME: Bailey Point Subdivision HOA c/o William Wilson
2. LOCATION OF PROJECT SITE: lot #41 within the Bailey Point Subdivision located of SR 1725
between Bath and Belhaven in Beaufort County, North Carolina
35025'44" N
76°38'35" W
3. INVESTIGATION TYPE: CAMA & Dredge and Fill
4. INVESTIGATIVE PROCEDURE: Dates of Site Visit — 24 October 2022
Was Applicant Present - Yes
5. PROCESSING PROCEDURE: Application Received — 9 January 2023
Office - Washington
6. SITE DESCRIPTION:
(A) Local Land Use Plan — Beaufort County
Land Classification From LUP — Conservation (land), Conservation (water, wetlands)
(B) AEC(s) Involved: EW, PTA, CS
(C) Water Dependent: YES
(D) Intended Use: Private Subdivision
(E) Wastewater Treatment: Existing - NIA
Planned - NIA
(F) Type of Structures: Existing — pier, platform
Planned - boat ramp
(G) Estimated Annual Rate of Erosion: NIA
Source - NIA
7
HABITAT DESCRIPTION:
[AREA]
DREDGED FILLED OTHER
(A) Vegetated Wetlands
(B) Non -Vegetated Wetlands
±525 ft2 boat
Creek bottom
ramp
Other
FC
+ 1,125 ft2 boat
Highground
ramp access
(D) Total Area Disturbed: t0.04 acres (f1,650 sq. ft.)
(E) Primary Nursery Area: No
(F) Water Classification: SA, HQW, NSW Open: No
PROJECT SUMMARY: Bailey Point Subdivision HOA proposes to install a boat ramp.
Bailey Point Subdivision HOA
CIO William Wilson, HOA President
Lot #41 Bailey Point
Beaufort County
Project setting
Mr. William Wilson, Bailey Point HOA president has submitted on behalf of Bailey
Point Subdivision, has submitted the attached application for the construction and
installation of a boat ramp on lot #41 within the Bailey Point Subdivision. Bailey Point
Subdivision is located of SR 1725 between Bath and Belhaven in Beaufort County. Bailey
Point is located on Bailey Creek which drains to North Creek then to the Pamlico River.
The site is a ±1.84 acre lot owned by the Bailey Point Homeowners Association. The
lot has approximately 180 linear feet of shoreline which fronts Bailey Creek. The site is
approximately 2.0' feet above Normal Water Level. A large portion of the lot contains
Coastal Wetlands with approximately 20 linear feet not delineated as Coastal Wetlands.
Prior to the development of the subdivision the property was owned by Weyerhaeuser and
maintained as a pine production plantation. This lot along with the others had previously
been rowed and bedded with pine trees planted on the crest of the bed. The proposed boat
ramp is located on the crest of a pine tree bed. This location has sufficient elevation that
Coastal Wetlands are not present in this location. The lot is vegetated with loblolly pine
trees (Pinus taeda) and sawgrass (Cladium jamaicense), Bulrush (Scirpus spp.) and Salt
Meadow Grass (Spartina patens). Both adjacent lots are undeveloped single family
residential lots. A pier with platform is located on the lot.
Bailey Creek is designated as Joint fishing water. The lot is subject to the Tar -
Pamlico Riparian Buffer rules with the NC Division of Water Resources, Bailey Creek is
classified SA, HQW, NSW by the Environmental Management Commission and is closed to
shellfishing. There were no submerged aquatic vegetation (SAV) present in the project
area during the site visit.
Project description
The applicant proposes to construct and install a 15' wide by 35' long boat ramp to
reach the -4.0' water depth. The approach to the boat ramp is proposed to be the same
width as the portion of ramp below NWL and extend through the 75' Coastal Shoreline Area
of Environmental Concern. The location and orientation of the boat ramp was chosen to
avoid any Coastal Wetland impact.
Anticipated impacts
The construction of the boat ramp will result in the filling of ±525 ft2 of Creek bottom.
Approximately 1,125 ft2 will be disturbed for the construction of the boat ramp access travel
way. The project will result in localized short-term turbidity from the construction of the boat
ramp.
Kelly Spivey
23 January 2023
William Wilson
Bailey Pointe HOA President
2 Shipwreck Dr
Belhaven NC 27810
captnbiII43@gmail.com
848-373-6613
RECEIVED
November 24, 2022 IAf� f 2023
NC Division of Coastal Management
CAMA Project Narrative for Bailey Pointe HOA Boat Ramp DAN AR
The proposed boat ramp has been requested by the lot owners of Bailey Pointe
Subdivision. The proposed boat ramp would be located on Bailey Creek from the
community lot, #41, currently used by the community. The dimensions of 15'Wx 40'L
would provide lot owners a means of local access for the launching and retrieving of
watercraft for pleasure and storm evacuation as here is no local access nearby.
The area will be silt fenced along the divided area of upland and coastal wetlands, the
ramp will be of a concrete slab framed and poured 6" thick on site with appropriate
rebar for strength then slid into place along the river bottom to a depth of 4'. Hog slats
along with ABC stone will make up the 75' of the approach to the ramp. Two pine trees
located in the upland will be removed for the ramp approach. The property is
maintained by Bailey Pointe HOA and accepts the responsibilities of maintaining the
ramp and approach.
The project proponent hereby certifies that all information contained herein is true,
accurate, and complete to the best of my knowledge and belief.
The project proponent hereby requests that the certifying authority review and take
action on this CWA 401certification request within the applicable reasonable period
of time.
Bailey Pointe Boat Ramp
Narrative
Prepared By: William Wilson
Date:11/25/2022
Page 1 of 2
RON RIM RECEIVED
APPLICATION for JAN 9 2023
Major Development Permitg{p
(post nvl"d 12127/06)
North Carolina DIVISION OF COASTAL MANAGEMENT
1. Primary Applicantl Landowner Information
Business Name
Project Name (it applicable)
Bailey Pointe HOA
Boat Ramp
Applicant 1: First Name
MI
Last Name Wilson
William
J
Bailey Pointe HOA President
Applicant 2: First Name
MI
Last Name
ff additional applicants, please attach an additional page(s) with names listed.
Mailing Address PO Box
37 Channel Marker Ct
City
Belhaven
Slate
NC
ZIP 27810
Country
Phone No.
FAX No.
848-373-6613 ext.
Street Address (if different from above)
City
State
ZIP
Email
captnb11143@gmail.com
2. Agent/Contrector Information
Business Name
Agent/ Contractor 1: First Name
MI
Last Name Wilson
William
J
Bailey Pointe HOA President
Agent/ Contractor 2: First Name
Mi
Last Name
Mailing Address
PO Box
city
State
2 Shipwreck Dr
Belhaven
NC
ZIP 27810
Phone No. 1
Phone No. 2
848-373-6613 ext.
ext.
FAX No.
Contractor #
Street Address (it different from above)
City
State ZIP
Email
captnbi1143@gmall.com
<Form continues on backer
252.808-2800 .. 4-888-411COAST .. www.nccoastatmanagement.net
Form DCM MP-1 (Page 2 of 4)
APPLICATION for
Major Development Permit
4. Site Description
a. Total length of shoreline on the tract (it.) b. Size of entire tract (sq,ft.)
180, 80,150
c. Size of individual loi(s) d. Approximate elevation of tract above NHW (normal high wafer) or
1.84 apres NWL (normal water level)
(if many tot sizes, please attach additional page with a list) ❑NHW or ®NWL 2'
e. Vegetation on tract
Coastal Wetlands, Upland Grasses, Pine Trees, Hardwood Trees,Wooded Wetlands
t. Man-made features and uses now on tract
Community Dock
g. Identify and describe the existing land uses g_diacenj to the proposed project site.
Single home housing, Residential
h, How does local government zone the tract? i. Is the proposed project consistent with the applicable zoning?
NIA (Attach zoning compliance certificate, if applicable)
❑Yes ❑No ®NA
j. Is the proposed activity part of an urban waterfront redevelopment proposal? ❑Yes [XNo
k. Has a professional archaeological assessment been done for the tract? If yes, attach a copy. ❑Yes (RNo DNA
If yes, by whom?
f. Is the proposed project located in a National Registered Historic District or does it involve a ❑Yes ®No ❑NA
National Register listed or eligible property?
<Form continues on next pagea
RECEIVED
252.-808.2808 :: 1-888-4RCOAS :: www.nccoastatnianagernent.�AN 0 9 2023
Form DCM MP-1 (Page 3 of 4)
APPLICATION for
Major Development Permit
m. (i) Are there wetlands on the site? Wes ❑No
(ii) Are there coastal wetlands on the site? ['Yes []No
(Ili) If yes to either (i) or (ii) above, has a delineation been conducted? [RYes []No
(Attach documentation, if available) Coastal Wetlands by DCM at Location of Proposed Boat Ramp
n. Describe existing wastewater treatment facilities.
None
o. Describe existing drinking water supply source.
Community has city water
p. Describe existing storm water management or treatment systems.
Existing drainage ditch from roadway
S. Activities and Impacts
a. Will the project be for commercial, public, or private use? ❑Commercial ❑Public/Government
®Private/Community
b. Give a brief description of purpose, use, and daily operations of the project when complete.
Private community access to launch and retrieve small personal water crafts for leisure
as well as for storm evacuation
c. Describe the proposed construction methodology, types of construction equipment to be used during construction, the number of each type
of equipment and where it is to be stored.
one 40'X15' concrete slab 6" thick with appropriate
rebar for strength pushed into location with one
excavator, Along boat ramp approach
d. List all development activities you propose.
Only adding one boat ramp to an already existing community accessible
lot for private use
e. Are the proposed activities maintenance of an existing project, new work, or both?
New work to an existing community lot
f. What is the approximate total disturbed land area resulting from the proposed project? E]Sq.Ft or ❑Acres
1125 for ramp approach and 300 for the ramp in the water
g. Will the proposed project encroach on any public easement, public accessway or other area []Yes XNo [_-]NA
that the public has established use of?
h. Describe location and type of existing and proposed discharges to waters of the state.
NIA
i. Will wastewater or stormwater be discharged into a wetland? ❑Yes ®No ❑NA
If yes, will this discharged water be of the same salinity as the receiving water? []Yes [XNo ❑NA
j. Is there any mitigation proposed? ❑Yes [ANo ❑NA
If yes, attach a mitigation proposal.
<Form continues on backer RECEIVED
�`52.808•1808 .. 1-888-4RCOAST wwvv-nccoastalmanagement.net '
Form DCM MP-1 (Page 4 of 4)
6. Additional Information
APPLICATION for
Major Development Permit
In addition to this completed application form, (MP-1) the following Items below, if applicable, must be submitted In order for the application
package to be complete. Itoms (a) — (0 are always applicable to any major development application. Please consult the application
Instruction booklet on how to properly prepare the required items below.
a. A project narrative. See attached Narrative Pages 1-2
b. An accurate, dated work plat (including plan view and cross -sectional drawings) drawn to scale. Please give the present status of the
proposed project. Is any portion already complete? If previously authorized work, clearly indicate on maps, plats, drawings to disfinguish
between work completed and proposed.
See attached Plat Drawings pages 1.3
c. A silo or location map that is sufficiently detailed to guide agency personnel unfamiliar with the area to the ile.
�ee attached Site Maps 1-3
d. A copy of the deed (with state application only) or other instrument under which the applicant claims title to the affected properties.
o. The appropriate application fee. Check or money order made payable to DENR.
f. A list of the names and complete addresses of the adjacent waterfront (riparian) landowners and signed return receipts as proof that such
owners have received a copy of the application and plats by certified mail. Such landowners must be advised that they have 30 days in
which to submit comments on the proposed project to the Division of Coastal Management.
Name Kathleen Garrison Lot #42 Phone No,
Address 1715 Tarrytown Ave Crofton MD 21114
Name Gary Darnell Lot # 40 Phone No.
Address 8700 Scenic Green Circle Apt #12207 Fort Worth, TX 76244 817-709-9153
Name Phone No.
Address
g. A list of previous state or federal permits issued for work on the project tract. Include permit numbers, permittee, and issuing dates.
h. Signed consultant or agent authorization form, if applicable.
i. Wetland delineation, if necessary.
j. A signed AEC hazard notice for projects in oceanfront and inlet areas. (Must be signed by property owner)
A statement of compliance wilh the N.C. Environmental Policy Act (N.C.G.S. 113A 1-10), if necessary. If the proiect involves expenditure
of public funds or use of public lands, attach a statement documenting compliance with the North Carolina Environmental Policy Act,
7. Certification and Permission to Enter on Land
I understand that any permit issued in response to this application will allow only the development described in the application.
The project will be subject to the conditions and restrictions contained in the permit.
I certify that I am authorized to grant, and do in fact grant permission to representatives of state and federal review agencies to
enter on the aforementioned lands in connection with evaluating information related to this permit application and follow-up
monitoring of the project.
I further certify that the information provided in this application is truthful to the best of my knowledge.
Date 11/`25/2022 Print Name William Wilson, HOA President
Signature W
Please indicate application attachments pertaining to your proposed project.RECEIVED
UDCM MP-2 Excavation and Fill Information ❑DCM MP-5 Bridges and Culverts
®DCM MP-3 Upland Development )AN C' 9 2023
❑DCM MP-4 Structures Information
252-808-2808 11•888.4RCOAST ., www-nccoastalmanagement.net
Dorm DCM MP-2
EXCAVATION and FILL
(Except for bridges and culverts)
Attach this form to Joint Application for CAMA Major Permit, Form DCM MP-1. Be sure to complete all other sections of the Joint
Application that relate to this proposed project. Please include all supplemental information.
Describe below the purpose of proposed excavation and/or fill activities. All values should be given in feet.
Length
Width
Avg. Existinc
Depth
Final Project
Depth
Access
Other
Chan el
(NLWor
Canal
Boat Basin
Boat Ramp
Rock Groin
Rock
(excluding
NWL
Breakwater
shoreline
stablllzation
15'
4'
NA
NA
4'
NA
NA
1. EXCAVATION
a. Amount of material to be excavated from below NHW or NWL in
cubic yards.
d
c. V) Does the area to be excavated include coastal wetlands/marsh
WWI. submerged aquatic vegetation (SAV), shell bottom (Se).
or other wetlands (WL)? If any boxes are checked, provide the
number of square feet affected.
❑CW ❑SAV [:]BB
❑WL ❑None
(ii) Describe the purpose of the excavation in these areas:
0This section not applicable
b. Type of material to be excavated.
d. High -ground excavation in cubic yards.
2. DISPOSAL OF EXCAVATED MATERIAL X This section not applicable
a. Location of disposal area. b. Dimensions of disposal area.
C. (i) Do you claim title to disposal area? d. (i) Will a disposal area be available for future maintenance?
[]Yes ❑No ❑NA ❑Yes ❑No []NA
(ii) If no, attach a letter granting permission from the owner. 00 If yes, where?
e. 0) Does the disposal area include any coastal wetlands/marsh f. (i) Does the disposal include any area in the water?
(CW), submerged aquatic vegetation (SAV), shell bottom (SB), ❑Yes ❑No ❑NA
or other wetlands (WL)? If any boxes are checked, provide the
number of square feel alected. (ii) If yes, how much water area is affected?
❑CW ❑SAV ❑SB
❑WL []None
(ii) Describe the purpose of disposal in these areas:
RFOEIVED
9 2023
-w Al A R CI
252-808-2808 :: 1.888.4RCOAST a www.nccoastaimanagement.net revised: 12126106
Form DCM MP-2 (Excavation and Fill, Page 2 of 2)
3. SHORELINE STABILIZATION ®This section not applicable
(if development is a wood groin, use MP-4 — Structures)
a. f ype of shoreline stabilization: b. Length:
❑Bulkhead ❑Riprap ❑Breakwater/Sill ❑Other: Width:
c. Average distance waterward of NHW or NWL: d. Maximum distance waterward of NHW or NWL:
e. Type of stabilization material: I. (i) Has there been shoreline erosion during preceding 12
months?
❑Yes ❑No ❑NA
(ii) If yes, stale amount of erosion and source of erosion amount
information.
g. Number of square feet of fill to be placed below water level. h. Type of fill material.
Bulkhead backfill Riprap
Breakwater/Sill Other
i. Source of fill material,
4. OTHER FILL ACTIVITIES §jThis section not applicable
(Excluding Shoreline Stabilization)
a. (i) Will fill material be brought to the site? ❑Yes ❑No DNA b. (1) Will fill material be placed in coastal wetlandslmarsh (CW).
If yes,
(ii) Amount of material to be placed in the water
(iii) Dimensions of fill area
(iv) Purpose of fill
submerged aquatic vegetation (SAV), shell bottom (SB), or
other wetlands (WI-)? If any boxes are checked, provide the
number of square feet affected.
❑CW ❑SAV ❑SB
❑WL []None
(ii) Describe the purpose of the fill in these areas:
5. GENERAL
a. How will excavated or fill material be kept on site and erosion b. What type of construction equipment will be used (e.g., dragline,
controlled? backhoe, or hydraulic dredge)?
51 VS' 1t��S'hLL�
c. (i) Will navigational) aids be required as a result of the project? d.
❑Yes No A
(ii) If yes, explain what type and how they will be implemented.
One excavator to push the ramp in place
(i) Will wetlands be crossed in transporting equipment to project
site? ❑Yes 5ONo ❑NA
(ii) If yes, explain steps that will be taken to avoid or minimize
environmental impacts.
ee �/ rp^��
917 ,,EI it ED
1/"3'. t
Date Applicant Name�f
Wiliam Wilson, HOA President
Project Name
Bailey Pointe Boat Ramp
Applicant Signaturg
252-308-2303 c: 1-388-48COAST :: net rQvised: •f 2126/06
Form DCM MP-3
UPLAND DEVELOPMENT
(Construction and/or land disturbing activities)
Attach this form to Joint Application for CAMA Major Permit, Form DCM MP-1. Be sure to complete all other sections of the Joint
Application that relate to this proposed project. Please include all supplemental information.
GENERAL UPLAND DEVELOPMENT
a. Type and number of buildings, facilities, units or structures b. Number of lots or parcels.
proposed.
15` boat ramp approach
c. Density (give the number of residential units and the units per
acre).
NIA
e. If the proposed project will disturb more than one acre of land, the
Division of Land Resources must receive an erosion and
sedimentation control plan at least 30 days before land -disturbing
activity begins.
(i) If applicable, has a sedimentation and erosion control plan been
submitted to the Division of Land Resources?
[]Yes ❑No 50NA
(ii) If yes, list the date submitted:
g. Give the percentage of the tract within the coastal shoreline AEC to
be covered by impervious and/or built -upon surfaces, such as
pavement, building, rooftops, or to be used for vehicular driveways
or parking.
13% Boat Ramp Approach
i. Give the percentage of the entire tract to be covered by impervious
andtor built -upon surfaces, such as pavement, building, rooftops,
or to be used for vehicular driveways or parking.
.01 %
j. Describe proposed method of sewage disposal.
NIA
I. Describe location and type of proposed discharges to waters of the
state (e.g., surface runoff, sanitary wastewater, industrial/
commercial effluent, "wash down" and residential discharges).
Surface Runoff
one
d. Size of area to be graded, filled, or disturbed including roads,
ditches, etc.
1125 sgft
f. List the materials (such as marl, paver stone, asphalt, or concrete)
to be used for impervious surfaces.
Gravel/Hog Slats
h. Projects that require a CAMA Major Development Permit may also
require a Stormwater Certification.
(i) Has a site development plan been submitted to the Division of
Water Quality for review?
❑Yes ❑No [ANA
(ii) If yes, list the date submitted: NZA
k. Have the facilities described in Item (i) received state or local
approval?
❑Yes ❑No {MINA
If yes, attach appropriate documentation.
m. Does the proposed project include an innovative stormwater
design?
❑Yes ❑No ®NA RECEIVED
If yes, attach appropriate documentation.
wti (' 9 2Q?.3
252.808-28082 :: 9-888.4RCOAST :: www.nccoastalmana�ement._net revised: 12126106
Form DCM MP-3 (Upland Development, Page 2 of 2)
m. Describe proposed drinking water supply source (e.g., well,
community, public system, etc.)
None Proposed
o. When was the lot(s) platted and recorded?
Date
f 1 /2512022
Project Name
Bailey Pointe Boat Ramp
Applicant Name
William Wilson, Bailey Pointe HOA President
Applicant Signature / J r, f. —
n. (i) Will water be impounded? [--]yes ONO ❑NA
(ii) If yes, how many acres?
p- If proposed development is a subdivision, will additional utilities be
installed for this upland development?
❑Yes IdNo ❑NA
RECEIVED
JAN 0- 9 2023
252-808-2808 ;: 1-888-4RCOAST :; www.nccoastatmanag_ement.net
revised: 12I26166
��:
•�:`r:
SDPED
A)
CD
2.
OD
coCD
O
N O
w
a' w
� 3
0
s�
Cr D
CD CD
3 CD
0 ccnn
T
0
C
Q
N
O �
N
i
I
.S in
O, {
r —
O
• LQ
ti
Al
CS :T
O Ln
n
CD
-0
a 0
r= 0
=
Ln
o m
? cc
cD
cy
5'
S
CD
CD
y
_In
RECEI i .'
JAN f �i 2023
��
� a
FA
�z
r
C) Q
W n O
1
1
1 �
1
1
To Ow
"a c
2.
00
N _= m
N W' cT
N 3 w
O
CD
l^
)
CD
77
t) C IAA a�A? 14R 0