HomeMy WebLinkAbout20221179 Ver 1_USACE Permit_20230130Action Id. SAW-2020-01862 U.S. ARMY CORPS OF ENGINEERS WILMINGTON DISTRICT County: Guilford U.S.G.S. Quad: NC -Greensboro GENERAL PERMIT (REGIONAL AND NATIONWIDE) VERIFICATION Permittee: CIP Construction Company Attn: Ken Chavis Address: 201 North Elm Street Greensboro, NC 27401 E-mail: kchavis(acipconst.com Size (acres) —115 Nearest Town Greensboro Nearest Waterway UT to South Buffalo Creek River Basin Cape Fear USGS HUC 03030002 Coordinates 36.002908, -79.787981 Location description: The project area is located on the north side of I-85 and the west side of Pleasant Garden Road, in Greensboro, Guilford County, North Carolina. Description of projects area and activity: This verification authorizes the permanent discharge of dredged or fill material into 0.043 acre (238 linear feet) of stream channel (0.031 acre 1143 linear feetl of which are considered a permanent loss) and 0.265 acre of riparian non-riverine wetlands, and the temporary discharge of dredged or fill material into 0.004 acre (20 linear feet) of stream channel and 0.0639 acre of riparian non-riverine wetlands (0.027 acre of which results in a permanent reduction in wetland function), necessary to construct access and infrastructure including one road crossing (Elmsley Drive Extension) for the Brittwav II Industrial Site. Applicable Law(s): N Section 404 (Clean Water Act, 33 USC 1344) ❑ Section 10 (Rivers and Harbors Act, 33 USC 403) Authorization: Nationwide Permit 39. Commercial and Institutional Developments SEE ATTACHED NWP GENERAL, REGIONAL, AND/OR SPECIAL CONDITIONS Your work is authorized by the above referenced permit provided it is accomplished in strict accordance with the attached Conditions, your application signed and dated 12/9/2022, revised/additional information provided via email on 1/6/2023, and the enclosed plans Brittwav Elmsley Drive Extension - Stream Impact "Overall Site Plan" (Sheet No. EX-2) and "Site and Drainage Plan" (Sheet No. Ex-2.1), dated 8/12/2022 (revised 1/5/2023). Any violation of the attached conditions or deviation from your submitted plans may subject the permittee to a stop work order, a restoration order, a Class I administrative penalty, and/or appropriate legal action. This verification will remain valid until the expiration date identified below unless the nationwide and/or regional general permit authorization is modified, suspended or revoked. If, prior to the expiration date identified below, the nationwide and/or regional general permit authorization is reissued and/or modified, this verification will remain valid until the expiration date identified below, provided it complies with all requirements of the modified nationwide permit. If the nationwide and/or regional general permit authorization expires or is suspended, revoked, or is modified, such that the activity would no longer comply with the terms and conditions of the nationwide permit, activities which have commenced (i.e., are under construction) or are under contract to commence in reliance upon the nationwide and/or regional general permit, will remain authorized provided the activity is completed within twelve months of the date of the nationwide and/or regional general permit's expiration, modification or revocation, unless discretionary authority has been exercised on a case -by -case basis to modify, suspend or revoke the authorization. Activities subject to Section 404 (as indicated above) may also require an individual Section 401 Water Quality Certification. You should contact the NC Division of Water Resources (telephone 919-807-6300) to determine Section 401 requirements. For activities occurring within the twenty coastal counties subject to regulation under the Coastal Area Management Act (CAMA), prior to beginning work you must contact the N.C. Division of Coastal Management. This Department of the Army verification does not relieve the permittee of the responsibility to obtain any other required Federal, State or local approvals/permits. If there are any questions regarding this verification, any of the conditions of the Permit, or the Corps of Engineers regulatory program, please contact David E. Bailey at (919) 817-2436 or David.E.Bailev2@usace.army.mil. Corps Regulatory Official: Date: 2023.01.30 12:15:20 05'00' Date: 01/30/2023 Expiration Date of Verification: 3/14/2026 SAW-2020-01862 SPECIAL CONDITIONS 1. In order to compensate for impacts associated with this permit, mitigation shall be provided in accordance with the provisions outlined on the most recent version of the attached Compensatory Mitigation Responsibility Transfer Form. The requirements of this forms, including any special conditions listed on this form, are hereby incorporated as special conditions of this permit authorization. 2. Surface/base flow to Wetlands E, L, G2, L2 and M, and Stream A2 must be maintained per Stormwater Device/Basin outlets as shown on the Brittway Elmsley Drive Extension - Stream Impact "Overall Site Plan" (Sheet No. EX-2) of the enclosed plans. 3. All authorized temporary wetland and stream impacts, as shown on the Brittway Elmsley Drive Extension - Stream Impact "Site and Drainage Plan" (Sheet No. Ex-2.1) of the enclosed plans, must be restored to original grade and contour and stabilized with regionally appropriate native wetland and/or riparian seed mix and natural fiber matting (on banks only for temporary stream impacts). 4. Please note that future impacts and/or phases of the Brittway II Industrial Park development, including the construction of East Elmsley Drive and related activities associated with Corps Action IDs: SAW-2002-20166 and SAW-2020-01862, are considered part of a single and complete project; these impacts may be considered cumulative with impacts authorized during earlier phases with respect to compensatory mitigation and Nationwide Permit thresholds. Current cumulative impacts to waters of the US for this single and complete project include a total loss of 0.268 acre of wetlands and 0.040 acre (279 linear feet) of stream channel, or 0.308 acre of waters of the US. Corps Regulatory Official: Expiration Date of Verification: 3/14/2026 Date: 2023.01.30 12:14:40-05'00' Date: 01/30/2023 The Wilmington District is committed to providing the highest level of support to the public. To help us ensure we continue to do so, please complete the Customer Satisfaction Survey located at https://regulatory.ops.usace.army.mil/customer-service-survey/. Copy furnished electronically: Brad Luckey, Pilot Environmental, Inc., bluckey@pilotenviro.com Sue Homewood, NCDEQ-DWR, sue.homewood@ncdenr.gov Seren Homer, NCDEQ-DWR, seren.homer@ncdenr.gov Rebecca Chandler, NCDEQ-DWR, rebecca.chandler@ncdenr.gov U.S. ARMY CORPS OF ENGINEERS Wilmington District Compensatory Mitigation Responsibility Transfer Form Permittee: CIP Construction Company (Attn: Ken Chavis) Action ID: SAW-2020-01862 Project Name: Brittway II Industrial / 4150 R1 Pleasant Garden Road / East Elmsley Drive / Greensboro County: Guilford Instructions to Permittee: The Permittee must provide a copy of this form to the Mitigation Sponsor, either an approved Mitigation Bank or the North Carolina Division of Mitigation Services (NCDMS), who will then sign the form to verify the transfer of the mitigation responsibility. Once the Sponsor has signed this form, it is the Permittee's responsibility to ensure that Wilmington District Project Manager identified on page two is in receipt of a signed copy of this form before conducting authorized impacts, unless otherwise specified below. If more than one Mitigation Sponsor will be used to provide the mitigation associated with the permit, or if the impacts and/or the mitigation will occur in more than one 8-digit Hydrologic Unit Code (HUC), multiple forms will be attached to the permit, and the separate forms for each Sponsor and/or HUC must be provided to the appropriate Mitigation Sponsors. Instructions to Sponsor: The Sponsor verifies that the mitigation requirements (credits) shown below have been released and are available at the identified site. By signing below, the Sponsor is accepting full responsibility for the identified mitigation, regardless of whether they have received payment from the Permittee. Once the form is signed, the Sponsor must update the bank ledger and provide a copy of the signed form and the updated ledger to the Permittee, the Project Manager who issued the permit, the Bank Project Manager, and the District Mitigation Office (see contact information on page 2). The Sponsor must also comply with all reporting requirements established in their authorizing instrument. Permitted Impacts and Compensatory Mitigation Requirements: Permitted Impacts Requiring Mitigation* 8-digit HUC and Basin: 03030002, Cape Fear River Basin Stream Impacts (linear feet) Wetland Impacts (acres) Warm Cool Cold Riparian Riverine Riparian Non-Riverine Non -Riparian Coastal 192 0.298 *If more than one mitigation sponsor will be used for the permit, only include impacts to be mitigated by this sponsor. Compensatory Mitigation Requirements: 8-digit HUC and Basin: 03030002, Cape Fear River Basin Stream Mitigation (credits) Wetland Mitigation (credits) Warm Cool Cold Riparian Riverine Riparian Non-Riverine Non -Riparian Coastal 335 0.568 Mitigation Site Debited: NCDMS (List the name of the bank to be debited. For umbrella banks, also list the specific site. For NCDMS, list NCDMS. If the NCDMS acceptance letter identifies a specific site, also list the specific site to be debited). Section to be completed by the Mitigation Sponsor Statement of Mitigation Liability Acceptance: I, the undersigned, verify that I am authorized to approve mitigation transactions for the Mitigation Sponsor shown below, and I certify that the Sponsor agrees to accept full responsibility for providing the mitigation identified in this document (see the table above), associated with the USACE Permittee and Action ID number shown. I also verify that released credits (and/or advance credits for NCDMS), as approved by the Wilmington District, are currently available at the mitigation site identified above. Further, I understand that if the Sponsor fails to provide the required compensatory mitigation, the USACE Wilmington District Engineer may pursue measures against the Sponsor to ensure compliance associated with the mitigation requirements. Mitigation Sponsor Name: Name of Sponsor's Authorized Representative: Signature of Sponsor's Authorized Representative Date of Signature Page 1 of 2 Form Version 10 June 2020 updated CESAW-RG (File Number, SAW-2020-01862) Conditions for Transfer of Compensatory Mitigation Credit: • Once this document has been signed by the Mitigation Sponsor and the District is in receipt of the signed form, the Permittee is no longer responsible for providing the mitigation identified in this form, though the Permittee remains responsible for any other mitigation requirements stated in the permit conditions. • Construction within jurisdictional areas authorized by the permit identified on page one of this form can begin only after the District is in receipt of a copy of this document signed by the Sponsor, confirming that the Sponsor has accepted responsibility for providing the mitigation requirements listed herein. When NCDMS provides mitigation for authorized impacts conducted by the North Carolina Department of Transportation (NCDOT), construction within jurisdictional areas may proceed upon permit issuance; however, a copy of this form signed by NCDMS must be provided to the District within 30 days of permit issuance. NCDOT remains fully responsible for the mitigation until the District has received this form, confirming that the Sponsor has accepted responsibility for providing the mitigation requirements listed herein. • Signed copies of this document must be retained by the Permittee, Mitigation Sponsor, and in the USACE administrative records for both the permit and the Bank/ILF Instrument. It is the Permittee's responsibility to ensure that the District Project Manager (address below) is provided with a signed copy of this form. • If changes are proposed to the type, amount, or location of mitigation after this form has been signed and returned to the District, the Sponsor must obtain case -by -case approval from the District Project Manager and/or North Carolina Interagency Review Team (NCIRT). If approved, higher mitigation ratios may be applied, as per current District guidance and a new version of this form must be completed and included in the District administrative records for both the permit and the Bank/ILF Instrument. Comments/Additional Conditions: • A letter from NCDMS, confirming they are willing and able to accept the applicant's compensatory mitigation responsibility, dated 10/28/2022 was included with the preconstruction notification. • Wetland credits required are derived from 0.2705 acre of permanent loss impacts at 2:1 and 0.027 acre of indirect impacts at 1:1. • Stream credits required are derived from 143 linear feet of permanent loss impacts at 2:1 and 49 linear feet of functional loss impacts at 1:1. This form is not valid unless signed below by the District Project Manager and by the Mitigation Sponsor on Page 1. Once signed, the Sponsor should provide copies of this form along with an updated bank ledger to: 1) the Permittee, 2) the District Project Manager at the address below, 3) the Bank Manager listed in RIBITS, and 4) the Wilmington District Mitigation Office, 3331 Heritage Trade Drive, Suite 105, Wake Forest, NC 27587 (or by email to SAWMIT@usace.army.mil). Questions regarding this form or any of the permit conditions may be directed to the District Mitigation Office. USACE Project Manager: USACE Field Office: Email: David E. Bailey Raleigh Regulatory Office US Army Corps of Engineers 3331 Heritage Trade Drive, Suite 105 Wake Forest, North Carolina 27587 David.E.Bailey2@usace.army.mil Date: 2023.01.30 12:14:55-05'00' USACE Project Manager Signature 01/30/2023 Date of Signature Current Wilmington District mitigation guidance, including information on mitigation ratios, functional assessments, and mitigation bank location and availability, and credit classifications (including stream temperature and wetland groupings) is available at http://ribits.usace.army.mil. S:\107\52733-Brittway_Elmsley_Drive_Extension\DWG\Sheet\Stream Impact\EX-2.dwg I Plotted on 1/5/2023 2:39 PM I by Adam Carroll L �\\� \\`\\\\\ \ 1 //1/.mil \ \-_�\ \ \ \ \\ \ \ \\ \\ \ \\ \\ \\/)� 1 I I3\1 ▪ N \ \ ---�\ I / / ' \I I • \ / / / \ 1 \ I 1 ► �� /\�� <\\��\1 1 1 1111 11 1 I I EDGE F -I \ \ \ \ \ 1 1\ 1 1 1 1 1 1 \ WAT 1 \ \\ \\ \ \ \ \ \ \\\\111111\1 1 \ \ \ \ PIN`78641802\ \ \ \‘1 1 \ \ \ \ \ \BR TV1\AY 1)NVESTM��T� LL(T \ \ 1 \ \ \ \ \ \ \ LQB 650 PG851 \ \ \ \ \ \ 1 1 \ • �\ \ \ ZbNIN%:CL-LI\\ \ \ \ \ \ \ \ \ \ 1 \ \ 1\1. N8 Ab' (+/-\514,104 TA \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ 30' ZTONE 1 \ \� \ \ \ \ \ \ \ \ \ \ \\\` \\\\ \\\\ \ \\ \\\ \` NDBUFFERED \\, \\ \� \ \\ \ \ \�\\ \ \ \ \ `\ \ \\ \\ \\ \\ \ \ \\\ \\\\\ \\ \\ n iroi+avo. ✓ i - --(NLET=8a55 ` \ \ ` \ \ v\\\\\\\\ `\ \ ` \` `\ \ fNV IN\4 "= $03.41k INV IN=801.66 T=801'.30 R/I< 8 2t5. - -INL/ET=804.55` \ ,PARITN- _ \ _ \ N \ \ \ \ \ \ \ \ \ \ \\ \\- BUFFER ��\\ �\ \ \\\ \ \` \ \\ N \ RERMAN€NT ACT FR \ \ ` \ \ \ \ \ \\\ \ \ N \ItIRf.2AP IINSTALLAION. EYED -IN) \ FIREFWDRA)VT \ \ \ \ nRo i r icoc cr innano wn 1' 2" _ LEY D F-F, 6 (2) 72" CULVERTS \\\\ \ \'\\' \\ \ \ \ \ \ TOTAL DRAINAGE AREA = 253.90 AC OFF -SITE DRAINAGE AREA = 231.83 AC NCDOT STI CONCRETE E / FIL /CUL'IERT!HEAUWA LS / / / 142.6/t.F (1/,334 $F / 0.//030 AC) / / / / / UFFERlIMP CT - EO / / / T4,4 S/F /,_0/1017/AC / \ i rxrIH cum RIP RAP 10 I+CC EXI5TI I 5T E+ 1 BECP flLT Him . AIL T P OF PAVEMENT S RFACE COURSE PROPOSED GRADE . 838.39 DWALL CULVERT TO BE EMBEDDED IN EXISTING STREAM BED 1.2' PLAN VIEW NOTES: I 1 PIN 16 14.- ? / \ BRITTWAY,//AIVEST i TSI --pB 6T27-P "28 / /1 L-0n1 P-B 72 Pa 7r 1 W I .- "USE: V• ANT 61 I I O 1\2"DIP / - ZONINe' GAD-p4-1II I W�TEfjLINE / 1IIII `� I11--T�1 /II!' I 1\ \ II I� I 1 ELEV1=807.90' I 11 \I / / III'II L I- - 4 -1 - I t _Fl/ �I RANT SECTION 'A -A' FILTER FABRIC 1. L = THE LENGTH OF THE RIPRAP APRON. 2. d = 1.5 TIMES THE MAXIMUM STONE DIAMETER BUT NOT LESS THAN 6" (INCHES). 3. A FILTER BLANKET OR FILTER FABRIC SHOULD BE INSTALLED BETWEEN THE RIPRAP AND SOIL FOUNDATION. 4. RIPRAP SHALL BE PRESSED INTO THE STREAM WHEN INSTALLED. MAINTENANCE RIP RAP SHOULD BE INSPECTED PERIODICALLY FOR SCOUR OR DISLODGED STONES. CONTROL OF WEED AND BRUSH GROWTH MAY BE NEEDED IN SOME LOCATIONS. OUTLET PROTECTION NO SCALE ,may,, I. O®S`89fi10I1 of sandbag dike rJ r. I- L PUMP AROUND DETAIL ass NOTES» � I I_ r r 1JJhP JMPfAROUND DIKES SHAL.INOTFEIESEtrOUTSIDE OF°THE DISTUREBEOIIMPACT )L11111ITSfSHOWNyC N THE PLANS: INST4,11,POMP AROUND DIVERISON`AND DEWATER THE' CONSTRUCTION ZONE F16HROIJGH'THE DEWATERING DEVICE. THE CONTRACTOR SHALL STAGE THE UMITS OF E PUMI#rAROUND FLOW DIVERSION TO DEWATER ONLY THAT SECTION SCHEDULED LEOR THA1)Ay'S WORK. AT THE END OF EACH WORK DAY, THE WORK AREA SHALL BE 'STABILIZEDi,THE PUMP AROUND, PRACTICE REMOVED, AND THE FLOW RESTORED TO �'L1.1gC iiANNEL.;YVO _S SH .. j_ETE SE COMB DFONLY DURINGFORECABT PERIODS QF I�RY;INE�ITHER! _r J,. 1_1I I 71 r r H \ \\ \ \\ \k \ \ \H/ \ \H/ 1 \\/ * V A \ \ `HI/ \/ \ \\ I� A \ I A \ ,vK v v H/ v vH/ .v v v \ TEMP `RY IMP1L FROG WETI�A. PU • AROO DE ATERI \� 0.617F(109S \/0.002 \ I A1y PERMANENT WETL 367 SF / 0.0084 ACC ..4 Ax H/ TEMPIRARY ETLAN6 IMP 1,607 SF / 0.03:9 AC / / BUF 4..��� I / 5,369 / / IAnaminek ,,,,araram.-- imemouranolrAirirAirazwerampartimill --wilagailinailits7c1r41*12211tirlWr '41111■4111114N MN \ ♦.�1..� I \ ITEMPO F�Y IMPAC FROfjA _ I I C \ \ I \ UMPAR�UND/ ■EW'T ING' \ 1 \ \ •.7 LF (731 F 0.►0171AC) / EDGE OF \ ,✓ \ / 1 WATER I I \ \ I I / / 1 I I / / / \ I I 11 I / I I I 1 I I I/ 1 / I\11I 20' ZONr2 -RIPARIAN BUFFER - - 30' ZdNE 1v 1 v\I' A/ ` q UNDISTURBED v\IN v v * �v v 7 - Z _ BUFFERv vI/ N. v� Vl/-- <I� �* \\I/ `v _ �► r = �` J/ \�� -► /' / \\ \ __- \ \ \ \ \ \ \ \ \ \ \ \ \ \\ \ \ \ \ \\ \ NN \ \ \ \\ ► \ >• \ ` \ y STOP OF BANK TERMITTENT - i - TREE M-A2- i EBr6E OF WA_TELR - l j / / /������ / / i - - • - ..- / // / - i / / / • i • i / R IMP CST_ ONK 1 / / / / / / / ....--• / / F//0.1233AC/ / / / / // I / // / / / / // / // / / / / / / I / I / / / / I I / BUFFER IMPACT - ZONE 2 / / / 1,38q SF 10.0317 �1C / / / I / / / / // / / / / I PERMAN N 11,287 SF / 0.26 72 INCH CULVERT 133.80' OF 72" RCP (cO 0.76% STREAM CROSSING HORIZ SCALE: 1 "=40' VERT SCALE: 1 "=4 NCDOT STD. 838.39 CONCRETE ENDWALL EXISTING STREAM BED IMBEDDED RIP -RAP DISSIPATOR ETLIAN►I PA / 12" LMSL 0' F-F, Y DRIV 0' PUB Ir �• .. • OU Jr/ r \ \ \ \ \ \ \ \ N N N \ \ \ \ N _ \ N N \ ` \ \ \ �N \ N N N LAN12 IMPACT \ \� \ �� \ N \ \/ N N \ \ \ A \ A\ \Vv/v N N \ \ I \ \ \ \ N I \ V ��v �`N vv \ v * N / \ I \ \ INItRMII / NI` / /\ V I \ ` \ ` STREAM 82 ` • 1 /� i J \ \ \ \ N / /N TOP SUR PROPOSED GRADE NCDOT STD. 838.39 CONCRETE ENDWALL 800 DISTURBANCE LEGEND PROPOSED GRADES - - -800- - EXISTING GRADES TOP OF BANK STREAM BUFFER EXISTING WETLAND PERMANENTLY DISTURBED WETLAND TEMPORARY WETLAND IMPACT PERMANENT IMPACT FROM FILL/CULVERT/HEADWALLS DISTURBED ZONE 1 BUFFER DISTURBED ZONE 2 BUFFER PERMANENT IMPACT FROM RIP -RAP INSTALLATION (STONE TO BE KEYED IN; TEMPORARY IMPACT FROM PUMP AROUND/ DEWATERING -' NOTES: 1. TEMPORARY IMPACTS ARE ITEMS THAT ARE REQUIRED DURING / CONSTRUCTION TO MAKE POSSIBLE THE PERMANENT STREAM CROSSING WITHOUT IMPACTING THE NATURAL FUNCTION OF THE - STREAM. THIS INCLUDES: DEWATERING ACTIVITIES. 2. PERMANENT IMPACTS ARE ITEMS THAT CAUSE DISTURBANCE TO THE STREAM AND WILL REMAIN IN PLACE UPON THE COMPLETION OF CONSTRUCTION. THIS INCLUDES: ROADWAY PAVEMENT INSTALLATION, CULVERT INSTALLATION, AND RIPRAP PLACEMENT. \ , ' U \ CULVERT CONSTRUCTION SEQUENCE 1. DO NOT BEGIN WORK WITHIN STREAM WITHOUT AUTHORIZATION. NO DISTURBANCE SHALL OCCUR OUTSIDE THE APPROVED IMPACTS. 2. INSTALL PUMP AROUND SETUP AS SHOWN IN THE DETAIL. ALL WORK SHOULD BE SCHEDULED FOR A PERIOD WHEN DRY WEATHER IS EXPECTED. 3. ONCE WORKING AREA IS PUMPED AND FREE OF WATER, CLEAR AND GRUB AS REQUIRED WITHIN THE WORKING AREA. 4. BEGIN INSTALLATION OF THE 42" CULVERT. 5. ONCE THE CULVERT AND HEADWALL ARE IN PLACE, INSTALL \ RIPRAP AS SHOWN. ENSURE DISTURBED AREAS ARE STABILIZED / PRIOR TO DIVERTING WATER THROUGH CULVERT. - NCD T STD. 838.39 CON RETE ENDWALL )F PAVEMENT ACE COURSE FLOODPLAIN BY-PASS CULVERT 127.51' OF 72" RCP @ 0.55% FLOODPLAIN CULVERT CROSSING HORIZ SCALE: 1 "=40' VERT SCALE: 1 "=4 EXISTING GRADE FOR REVIEW THIS DRAWING PREPARED AT THE TEL 336.662.0411 North Carolina License No. C-1652 • • • I • • • • • • REVISED USCOE COMMENTS REVISED PER TRC COMMENTS REVISED PER TRC COMMENTS REVISED USCOE COMMENTS DATE 08/12/2022 DRAWN BY M. MARTIN DESIGNED BY M. MARTIN CHECKED BY A. CARROLL SCALE 1"=40' JOB NO. 52733 SHEET NO. EX-2.1 0 C a aS .c72 .) C a) a) O N r6 a) 0 Q co C -o m Co a) a 0 c c c co co c_ c 0 a) 0 C O c0 71 Et 2 0 Lz 02 wo2 c >,H � O EC a c co c 0 o • O O c ce •O u� 3 Z ,„co O m 2 11 • a) ow • 0 aw 2 arc rn Xi .O (1) mrn c tl) o C � E 7 0 • f6 -0 O) a) r6L U o C m.2 U C 2 c co w N O cco O Qw a)-o CO Action ID Number: SAW-2020-01862 County: Guilford Permittee: CIP Construction Company (Attn: Ken Chavis) Project Name: Brittway II Industrial / 4150 R1 Pleasant Garden Road / East Elmsley Drive / Greensboro Date Verification Issued: 01/30/2023 Project Manager: David E. Bailey Upon completion of the activity authorized by this permit and any mitigation required by the permit, sign this certification and return it to the following address: US ARMY CORPS OF ENGINEERS WILMINGTON DISTRICT Attn: David E. Bailey Raleigh Regulatory Office U.S Army Corps of Engineers 3331 Heritage Trade Drive, Suite 105 Wake Forest, North Carolina 27587 or David.E.Bailey2@usace.army.mil Please note that your permitted activity is subject to a compliance inspection by a U. S. Army Corps of Engineers representative. Failure to comply with any terms or conditions of this authorization may result in the Corps suspending, modifying or revoking the authorization and/or issuing a Class I administrative penalty, or initiating other appropriate legal action. I hereby certify that the work authorized by the above referenced permit has been completed in accordance with the terms and condition of the said permit, and required mitigation was completed in accordance with the permit conditions. Signature of Permittee Date A. Determination of Jurisdiction: 1. ❑ There are waters, including wetlands on the above -described project area that maybe subject to Section 404 of the Clean Water Act (CWA) (33 USC § 1344) and/or Section 10 of the Rivers and Harbors Act (RHA) (33 USC § 403). This preliminary determination is not an appealable action under the Regulatory Program Administrative Appeal Process (Reference 33 CFR Part 331). However, you may request an approved JD, which is an appealable action, by contacting the Corps district for further instruction. Please note, if work is authorized by either a general or nationwide permit, and you wish to request an appeal of an approved JD, the appeal must be received by the Corps and the appeal process concluded prior to the commencement of any work in waters of the United States and prior to any work that could alter the hydrology of waters of the United States. 2. ❑ There are Navigable Waters of the United States within the above -described project area subject to the permit requirements of Section 10 of the Rivers and Harbors Act (RHA) (33 USC § 403) and Section 404 of the Clean Water Act (CWA) (33 USC § 1344). This determination may be relied upon for a period not to exceed five years from the date of this notification, provided there is no change in law or our published regulations or new information that warrants revision of this determination. 3. ❑ There are waters, including wetlands within the above -described project area that are subject to the permit requirements of Section 404 of the Clean Water Act (CWA) (33 USC § 1344). This determination may be relied upon for a period not to exceed five years from the date of this notification, provided there is no change in law or our published regulations or new information that warrants revision of this determination. 4. A jurisdiction determination was not completed with this request. Therefore, this is not an appealable action. However, you may request an approved JD, which is an appealable action, by contacting the Corps for further instruction. 5. 11 The jurisdictional areas within the above -described project area have been identified under a previous action. Please reference jurisdictional determination issued 11/23/2021. Action ID: SAW-2020-01862. B. Basis For Determination: See the Preliminary Jurisdictional Determination form dated 11/23/2021.