HomeMy WebLinkAbout20221424 Ver 1_Encl 2 - DCM-MP 2 Excavation and Fill - Lane, Revised 01-24-2023_20230124Form DCM MP-2 EXCAVATION and FILL (Except for bridges and culverts) Attach this form to Joint Application for CAMA Major Permit, Form DCM MP-1. Be sure to complete all other sections of the Joint Application that relate to this proposed project. Please include all supplemental information. Describe below the purpose of proposed excavation and/or fill activities. All values should be given in feet. Access Other Channel Canal Boat Basin Boat Ramp Rock Groin Rock (excluding (NLW or Add'. Riprap Breakwater shoreline NWL) 2 Sides stabilization) Length 13 (12 + 1) Width 15 (10.5 + 4.5) Avg. Existing 1.5 NA NA Depth Final Project 1.0 NA NA Depth 1. EXCAVATION ®This section not applicable a. Amount of material to be excavated from below NHW or NWL in b. Type of material to be excavated. cubic yards. C. (i) Does the area to be excavated include coastal wetlands/marsh (CW), submerged aquatic vegetation (SAV), shell bottom (SIB), or other wetlands (WL)? If any boxes are checked, provide the number of square feet affected. El CW El SAV ❑SB ❑WL ❑None (ii) Describe the purpose of the excavation in these areas: d. High -ground excavation in cubic yards. 2. DISPOSAL OF EXCAVATED MATERIAL ®This section not applicable a. Location of disposal area. b. Dimensions of disposal area. C. (i) Do you claim title to disposal area? ❑Yes ❑No ❑NA (ii) If no, attach a letter granting permission from the owner. d. (i) Will a disposal area be available for future maintenance? ❑Yes ❑No ❑NA (ii) If yes, where? e. (i) Does the disposal area include any coastal wetlands/marsh f. (i) Does the disposal include any area in the water? (CW), submerged aquatic vegetation (SAV), shell bottom (SIB), ❑Yes ❑No ❑NA or other wetlands (WL)? If any boxes are checked, provide the number of square feet affected. (ii) If yes, how much water area is affected? El CW El SAV ❑SB ❑WL ❑None (ii) Describe the purpose of disposal in these areas: 252-808-2808 :: 1-888-4RCOAST :: www.nccoastaimanagement.net revised: 12/26/06 E-orm DCM MP-2 (Excavation and Fill, Page 2 of 2) 3. SHORELINE STABILIZATION ❑This section not applicable (If development is a wood groin, use MP-4 — Structures) a. Type of shoreline stabilization: ®Bulkhead ❑Riprap ❑Breakwater/Sill ❑Other: c. Average distance waterward of NHW or NWL: 24.5-ft e. Type of stabilization material: Vinyl Sheetpile g. Number of square feet of fill to be placed below water level. Bulkhead backfill 8,086 Riprap Breakwater/Sill Other i. Source of fill material. Back fill: excavated from uplands on -site adjoining erosion escarpment, and/or trucked in from sandpit. b. Length: 329' at shoreline: 40' along boatramp: 15' east return wall Width: 2-ft d. Maximum distance waterward of NHW or NWL: 47.5 f. (i) Has there been shoreline erosion during preceding 12 months? ®Yes ❑No ❑NA (ii) If yes, state amount of erosion and source of erosion amount information. Previous resident indicates no erosion util after storm —18 months ago, when bulkhead failed. 2/2022 Google imagery compared to current measurements gives 357yr erosion rate. h. Type of fill material. Graded adjoining uplands of Roanoke Silt Loam, or trucked -in clean sand. 4. OTHER FILL ACTIVITIES El This section not applicable (Excluding Shoreline Stabilization) a. (i) Will fill material be brought to the site? ®Yes El No El NA b. (i) Will fill material be placed in coastal wetlands/marsh (CW), If yes, (ii) Amount of material to be placed in the water 69 sf: 48 cf (iii) Dimensions of fill area irregular: 12' x 4.5'+ V x 15' (iv) Purpose of fill Supplement riprap armor alongside Boatramp submerged aquatic vegetation (SAV), shell bottom (SB), or other wetlands (WL)? If any boxes are checked, provide the number of square feet affected. ❑CW ❑SAV ❑SB OWL ®None (ii) Describe the purpose of the fill in these areas: N/A 5. GENERAL a. How will excavated or fill material be kept on site and erosion b. What type of construction equipment will be used (e.g., dragline, controlled? backhoe, or hydraulic dredge)? Bulkhead will be constructed and sealed before backfill is placed. Excavator C. (i) Will navigational aids be required as a result of the project? ❑Yes ®No ❑NA (ii) If yes, explain what type and how they will be implemented. 09/26/2022; Amended 01/24/2023 d. (i) Will wetlands be crossed in transporting equipment to project site? ❑Yes ®No ❑NA (ii) If yes, explain steps that will be taken to avoid or minimize environmental impacts. Sharon R. Lane Date Applicant Lane Shoreline Development Project Theodore Sampson (Agent) Project Name Applicant Signature 252-808-2808 :: 1-888-4RCOAST :: www.nccoastaimanagement.net revised: 12/26/06