Loading...
HomeMy WebLinkAbout20141095 Ver 1_Modifications_20150226MEMORANDUM TO: David May, NC Division of Water Resources FROM: Kelly Spivey RO-4 DATE: 26 February 2015 SUBJECT: Modification of CAMA Permit No. 112 -14 issued to John & Deborah Logelfo Beaufort County Pamlico River On 16 December 2014 the John and Deborah Logelfo were issued CAMA Major Permit No. 112 -14 for the construction of bulkhead, pier with boatlift and a launch pier beside an existing boat ramp at 102 Carteret St. off NC Highway 99 adjacent Bath Creek in the Town of Bath, Beaufort County. The permitte has installed the pier pilings and a portion of the bulkhead on the west side of the permitted pier. The permitte states during the construction of the bulkhead on the eastern side of the boat ramp extreme amounts ofjunk and debris was discovered imbedded in the concrete below the water level. The applicant additionally states that if the bulkhead is relocated to the waters edge it will have less impact on the shore and less soil disturbance. On 18 February 2015, the Washington District received a request to modify Major PermitNo. 112-14 to relocate the permitted bulkhead from approximately 10' landward of Normal Water Level to the water's edge, immediately water ward of the cement laden shoreline. Please provide comments to Daniel Govoni, DCM Assistant Major Permit Coordinator within two weeks. ATTACHMENTS RECENED/NCDENR/DWR FEB 2 6 2015 John and Deborah Logelfo Bulkhead amendment request LAMA Major Permit # 112 -14 Project Revision 2/9/201 Located off Bath Creek, in the Town of Bath, on Hwy 92. Permit 4 112-14 The owners are requesting a revision of the bulkhead on the eastern side of the existing boat ramp. As stakeout and construction began, the removal of the existing concrete east of the ramp revealed extreme amounts of junk / debris below the water and imbedded in the concrete. It has become obvious that if we leave the old concrete in place and move the planned bulkhead to the existing edge at the water, it will have less impact on the shore and less soil disturbance. The revision of this bulkhead plan would be consistent with the original permit intent, but allow quicker construction and fewer disturbances. The attached maps show the shift of the bulkhead and revised bulkhead distances. We hope that this will complete the permit requirements and you can issue the authorization quickly, to prevent contractor from pulling off construction site. Thank you for your help and assistance. Bryant Hardison - agent for)ohn Logelfo John Logelfo CAMA Major Permit Permit Modification Town of Bath Bath To hip, Beaufort County, North Carolina Scal I"= 20' Drawn: 2 / 13 / 2015 By : t E. Hardison, Jr. PLS r� �w v O� e tls nue g piling exNisting/ pl/ 'ling 4� NPS ^I Q `v h 4 'o , NPS PS / G!7 new bu I ong old y R� d �J 4• � n �4 QQ 'new be$Nk'L /! khead bulkhead �Qo fiQ 3 ,eel Y� 10' a1 N� IE�� s� SF 41. . be W" b VVL ulkhea a d a ex cOncrcdp 8. . o- n. - oldlocado'n�� -- c � --� d 4_ l o mmoved concrete �(! - new bulkhead long old bulkhead w w M M � � Cd /&a u §a0 � �\2A) Cd ®/ Q / _- .� � \ }2 \/ \ } & ] [[ E LO S LO / \ c § � .e ,. .