Loading...
HomeMy WebLinkAbout20150217 Ver 1_401 Application_20150215JMcGill A S S O C I A T E S February 20, 2015 NCDENR — Division of Water Resources Wetlands Branch — Water Quality Programs 401 & Buffer Permitting Unit 512 North Salisbury Street 91" Floor Archdale Building Raleigh, North Carolina 27604 -1170 RE Lenoir Building Supply Sewer Replacement Pre - Construction Notification City of Lenoir, North Carolina Dear Sir or Madam On behalf of the City of Lenoir, please find enclosed for your review and approval the Pre - Construction Notification for the subject project The following documentation is included • Two (2) copies of the Pre - Construction Notification Form • One (1) Check in the amount of $240 00 for the application fee • One (1) Exhibit showing the location of the proposed stream disturbance • One (1) Exhibit showing the previous issued 404 Permit • One (1) Exhibit showing the project area on a USGS topo map • One (1) Exhibit showing the project area on a reduced size FIRM map • One (1) copy of the topographic map showing project location If you have any questions or require additional information regarding this application, please feel free to contact our office at 828 - 328 -2024 Sincerely, McGILL ASSOCIATES, P A R J MOZELEY, PE Project Engineer rim Enclosures cc Mr Radford Thomas, City of Lenoir E n g i n e e r i n g . P l a n n i n g 9 F i n a n c e McGill Associates P A • P O Box 1136 Hickory NC 28603 • 1240 19th Si Lane NW Hickoill, NC 28601 Office 828- 328 -2024 • Far 828 - 328 -3870 OF W A TF9 Office Use Only //�� o 2 0 1 5 0 2 1 7 Corps actio` ID no CO) to o < DWQ project no��� Form Version 1 3 D-c-10, 2`08 Page 1 of 11 PCN Form — Version 1 3 December 10, 2008 Version 1� PE��r�' a Pre - Construction Notification PCN Form A. Applicant Information 1 Processing 1 a Type(s) of approval sought from the Corps ®Section 404 Permit El Section 10 Permit 1 b Specify Nationwide Permit (NWP) number 12 or General Permit (GP) number 1c Has the NWP or GP number been verified by the Corps? ❑ Yes ® No 1 d Type(s) of approval sought from the DWQ (check all that apply) ® 401 Water Quality Certification — Regular ❑ Non -404 Jurisdictional General Permit ❑ 401 Water Quality Certification — Express ❑ Riparian Buffer Authorization le Is this notification solely for the record because written approval is not required? For the record only for DWQ 401 Certification ❑ Yes ® No For the record only for Corps Permit ❑ Yes ® No 1f Is payment into a mitigation bank or in -lieu fee program proposed for mitigation of impacts? If so, attach the acceptance letter from mitigation bank or in -lieu fee program ❑ Yes ® No 1g Is the project located in any of NC's twenty coastal counties If yes, answer 1 h below ❑ Yes ® No 1h Is the project located within a NC DCM Area of Environmental Concern (AEC)? ❑ Yes ® No 2 Project Information 2a Name of project Lenoir Building Supply Sewer Replacement 2b County Caldwell 2c Nearest municipality / town City of Lenoir 2d Subdivision name N/A 2e NCDOT only, T I P or state project no N/A 3 Owner Information 3a Name(s) on Recorded Deed Bently Larkin Cowles - City Sewer Easement 3b Deed Book and Page No Bk 1587 Pg 486 Year 06 3c Responsible Party (for LLC if applicable) W Lane Baily, City Manager, City of Lenoir 3d Street address 840 West Avenue NW D 3e City, state, zip Lenoir, NC 28645 3f Telephone no 828 757 2200 FER 3g Fax no eu 3h Email address Ibadey @ci lenoir nc us !410' NR 8 WATER Page 1 of 11 PCN Form — Version 1 3 December 10, 2008 Version 1� PE��r�' a 4 Applicant Information (if different from owner) 4a Applicant is ❑ Agent ® Other, specify Utility Owner 4b Name W Lane Bailey, City Manager 4c Business name (if applicable) City of Lenoir 4d Street address 840 West Ave NW 4e City, state, zip Lenoir, NC 28645 4f Telephone no 828 757 2200 4g Fax no 4h Email address Ibadey @ci lenoir nc us 5 Agent/Consultant Information (if applicable) 5a Name RJ Mozeley, PE 5b Business name (if applicable) McGill Associates 5c Street address 1240 19`h Street Lane, NW 5d City, state, zip Hickory, NC 28601 5e Telephone no (828) 328 -2024 5f Fax no (828) 328 -3870 5g Email address rj mozely @mcgillengineers com Page 2 of 11 PCN Form — Version 1 3 December 10, 2008 Version B Project Information and Prior Project History 1 Property Identification 1a Property identification no (tax PIN or parcel ID) PIN 2749665644 Latitude 35 544423 Longitude - 1 b Site coordinates (in decimal degrees) 81 324090 (DD DDDDDD) ( -DD DDDDDD) 1 c Property size 0 41 acres 2 Surface Waters 2a Name of nearest body of water (stream, river, etc ) to Town Creek, tributary to Lower Creek proposed project 2b Water Quality Classification of nearest receiving water C 2c River basin Catawba 3 Project Description 3a Describe the existing conditions on the site and the general land use in the vicinity of the project at the time of this application The project consists of replacement of an aged sewer collection line approx 200 -300 LF upstream of Action ID 2014- 01603 Site conditions are pre - disturbed, developed as a lumber yard in the City Limits of Lenoir 3b List the total estimated acreage of all existing wetlands on the property 0 acres 3c List the total estimated linear feet of all existing streams (intermittent and perennial) on the property 410LF 3d Explain the purpose of the proposed project The purpose is to replace existing sewers at the end of their useful service life 3e Describe the overall project in detail, including the type of equipment to be used Installation of new gravity sewers adjacent to existing sewer lines and related appurtenances Typical excavation and backfill equipment to be used in linear pipe installation which will include excavators and vibratory compactors 4 Jurisdictional Determinations 4a Have jurisdictional wetland or stream determinations by the Corps or State been requested or obtained for this property / Yes ®No El Unknown project (including all prior phases) in the pasty Comments 4b If the Corps made the jurisdictional determination, what type ❑ Preliminary ❑ Final of determination was made? 4c If yes, who delineated the jurisdictional areas? Agency /Consultant Company Name (if known) Other 4d If yes, list the dates of the Corps jurisdictional determinations or State determinations and attach documentation 5 Project History 5a Have permits or certifications been requested or obtained for ❑ Yes ® No ❑ Unknown this project (including all prior phases) in the past? 5b If yes, explain in detail according to "help file" instructions Page 3 of 11 PCN Form — Version 1 3 December 10, 2008 Version 6 Future Project Plans 6a Is this a phased project? ❑ Yes ® No 6b If yes, explain Page 4 of 11 PCN Form — Version 1 3 December 10, 2008 Version C Proposed Impacts Inventory 1 Impacts Summary la Which sections were completed below for your project (check all that apply) ❑ Wetlands ® Streams - tributaries ❑ Buffers ❑ Open Waters ❑ Pond Construction 2 Wetland Impacts If there are wetland impacts proposed on the site, then complete this question for each wetland area impacted 2a 2b 2c 2d 2e 2f Wetland impact Type of jurisdiction number — Type of impact Type of wetland Forested (Corps - 404, 10 Area of impact Permanent (P) or (if known) DWQ — non -404, other) (acres) Temporary T W1 ❑ P ❑ T ❑ Yes ❑ Corps ❑ No ❑ DWQ W2 ❑ P ❑ T ❑ Yes ❑ Corps ❑ No ❑ DWQ W3 ❑ P ❑ T ❑ Yes ❑ Corps ❑ No ❑ DWQ W4 ❑ P ❑ T ❑ Yes ❑ Corps ❑ No ❑ DWQ W5 ❑ P ❑ T ❑ Yes ❑ Corps ❑ No ❑ DWQ W6 ❑ P ❑ T ❑ Yes ❑ Corps ❑ No ❑ DWQ 2g Total wetland impacts 2h Comments 3 Stream Impacts If there are perennial or intermittent stream impacts (including temporary impacts) proposed on the site, then complete this question for all stream sites impacted 3a 3b 3c 3d 3e 3f 3g Stream impact Type of impact Stream name Perennial Type of jurisdiction Average Impact number - (PER) or (Corps - 404, 10 stream length Permanent (P) or intermittent DWQ — non -404, width (linear Temporary (T) (INT)? other) (feet) feet) Temporary for S1 ❑ PMT excavation /backfill and utility Town Creek ® PER ❑ INT ® Corps ❑ DWQ 5' 60' installation S2 ❑ P ❑ T ❑ PER ❑ Corps ❑ INT ❑ DWQ S3 ❑ P ❑ T ❑ PER ❑ Corps ❑ INT ❑ DWQ S4 ❑ P ❑ T ❑ PER ❑ Corps ❑ INT ❑ DWQ S5 ❑ P ❑ T ❑ PER ❑ Corps ❑ INT ❑ DWQ S6 ❑ P ❑ T ❑ PER ❑ Corps ❑ INT ❑ DWQ 3h Total stream and tributary impacts 31 Comments All stream crossings will be temporary with disturbed areas reestablished to original grade Page 5 of 11 PCN Form — Version 1 3 December 10, 2008 Version 4 Open Water Impacts If there are proposed impacts to lakes, ponds, estuaries, tributaries, sounds, the Atlantic Ocean, or any other open water of the U S then individually list all open water impacts below 4a 4b 4c 4d 4e Open water Name of waterbody impact number — (if applicable) Type of impact Waterbody type Area of impact (acres) Permanent (P) or Temporary T 01 ❑ PEI T 02 ❑P ❑T 03 ❑ PEI T 04 ❑P ❑T 4f. Total open water impacts 4g Comments 5 Pond or Lake Construction If pond or lake construction proposed, then complete the chart below 5a 5b 5c 5d 5e Wetland Impacts (acres) Stream Impacts (feet) Upland Pond ID Proposed use or purpose (acres) number of pond Flooded Filled Excavated Flooded Filled Excavated Flooded P1 P2 5f. Total 5g Comments 5h Is a dam high hazard permit required ❑ Yes ❑ No If yes, permit ID no 51 Expected pond surface area (acres) 5j Size of pond watershed (acres) 5k Method of construction 6 Buffer Impacts (for DWQ) If project will impact a protected riparian buffer, then complete the chart below If yes, then individually list all buffer impacts below If any impacts require mitigation, then you MUST fill out Section D of this form 6a ❑ Neuse El Tar-Pamlico El Other Project is in which protected basin? ❑ Catawba ❑ Randleman 6b 6c 6d 6e 6f 6g Buffer impact number— Reason Buffer Zone 1 impact Zone 2 impact Permanent (P) or for Stream name mitigation (square feet) (square feet) Temporary T impact required? B1 ❑P ❑T El Yes ❑ No B2 ❑P ❑T El Yes ❑ No B3 ❑P ❑T El Yes ❑ No 6h Total buffer impacts 61 Comments Page 6 of 11 PCN Form — Version 1 3 December 10, 2008 Version D Impact Justification and Mitigation 1 Avoidance and Minimization 1 a Specifically describe measures taken to avoid or minimize the proposed impacts in designing project Existing sewer alignment, site issues, and existing grade determined the routing of the sewer line The amount of temporary stream bank disturbance will be restricted as much as possible by arranging crossings at a near 90 degree angle 1 b Specifically describe measures taken to avoid or minimize the proposed impacts through construction techniques The minimum width necessary for construction equipment/ vehicle passage will be disturbed Material and soil stockpiles will not be permitted within the stream areas Disturbed streams will be restored immediately after utilities are installed 2 Compensatory Mitigation for Impacts to Waters of the U S or Waters of the State 2a Does the project require Compensatory Mitigation for impacts to Waters of the U S or Waters of the State? ❑ Yes ® No 2b If yes, mitigation is required by (check all that apply) ❑ DWQ ❑ Corps 2c If yes, which mitigation option will be used for this projects ❑ Mitigation bank El Payment to in -lieu fee program ❑ Permittee Responsible Mitigation 3 Complete if Using a Mitigation Bank 3a Name of Mitigation Bank 3b Credits Purchased (attach receipt and letter) Type Quantity 3c Comments 4 Complete if Making a Payment to In -lieu Fee Program 4a Approval letter from in -lieu fee program is attached ❑ Yes 4b Stream mitigation requested linear feet 4c If using stream mitigation, stream temperature ❑ warm ❑ cool ❑cold 4d Buffer mitigation requested (DWQ only) square feet 4e Riparian wetland mitigation requested acres 4f Non - riparian wetland mitigation requested acres 4g Coastal (tidal) wetland mitigation requested acres 4h Comments 5. Complete if Using a Permittee Responsible Mitigation Plan 5a If using a permittee responsible mitigation plan, provide a description of the proposed mitigation plan Page 7 of 11 PCN Form — Version 1 3 December 10, 2008 Version 6 Buffer Mitigation (State Regulated Riparian Buffer Rules) — required by DWQ 6a Will the project result in an impact within a protected riparian buffer that requires buffer mitigation? ❑ Yes ® No 6b If yes, then identify the square feet of impact to each zone of the riparian buffer that requires mitigation Calculate the amount of mitigation required Zone 6c Reason for impact 6d Total impact (square feet) Multiplier 6e Required mitigation (square feet) Zone 1 3 (2 for Catawba) Zone 2 1 5 6f Total buffer mitigation required 6g If buffer mitigation is required, discuss what type of mitigation is proposed (e g , payment to private mitigation bank, permittee responsible riparian buffer restoration, payment into an approved in -lieu fee fund) 6h Comments Page 8of11 PCN Form — Version 1 3 December 10, 2008 Version E Stormwater Management and Diffuse Flow Plan (required by DWQ) 1 Diffuse Flow Plan la Does the project include or is it adjacent to protected riparian buffers identified ❑ Yes ® No within one of the NC Riparian Buffer Protection Rules? lb If yes, then is a diffuse flow plan included? If no, explain why ❑ Yes ❑ No Comments 2 Stormwater Management Plan 2a What is the overall percent imperviousness of this project? N/A % 2b Does this project require a Stormwater Management Plan? ❑ Yes ® No 2c If this project DOES NOT require a Stormwater Management Plan, explain why Subsurface utility instal lation /replacement 2d If this project DOES require a Stormwater Management Plan, then provide a brief, narrative description of the plan ❑ Certified Local Government 2e Who will be responsible for the review of the Stormwater Management Plan? ❑ DWQ Stormwater Program ❑ DWQ 401 Unit 3 Certified Local Government Stormwater Review 3a In which local government's jurisdiction is this project? N/A ❑ Phase II ❑ NSW 3b Which of the following locally - implemented stormwater management programs ❑ USMP apply (check all that apply) ❑ Water Supply Watershed ❑ Other 3c Has the approved Stormwater Management Plan with proof of approval been ❑ Yes ❑ No attached? 4 DWQ Stormwater Program Review ❑ Coastal counties ❑ HQW 4a Which of the following state - implemented stormwater management programs apply ❑ ORW (check all that apply) ❑ Session Law 2006 -246 ❑ Other 4b Has the approved Stormwater Management Plan with proof of approval been ❑ Yes ❑ No attached? 5 DWQ 401 Unit Stormwater Review 5a Does the Stormwater Management Plan meet the appropriate requirements? ❑ Yes ❑ No 5b Have all of the 401 Unit submittal requirements been met? ❑ Yes ❑ No Page 9 of 11 PCN Form — Version 1 3 December 10, 2008 Version F Supplementary Information 1 Environmental Documentation (DWQ Requirement) la Does the project involve an expenditure of public (federal /state /local) funds or the ® Yes ❑ No use of public (federal /state) land? lb If you answered "yes" to the above, does the project require preparation of an environmental document pursuant to the requirements of the National or State ❑ Yes ® No (North Carolina) Environmental Policy Act (NEPA/SEPA)? 1c If you answered "yes' to the above, has the document review been finalized by the State Clearing House? (If so, attach a copy of the NEPA or SEPA final approval ❑ Yes ❑ No letter ) Comments 2 Violations (DWQ Requirement) 2a Is the site in violation of DWQ Wetland Rules (15A NCAC 2H 0500), Isolated Wetland Rules (15A NCAC 2H 1300), DWQ Surface Water or Wetland Standards, ❑ Yes ® No or Riparian Buffer Rules (15A NCAC 2B 0200)? 2b Is this an after - the -fact permit application? ❑ Yes ® No 2c If you answered "yes' to one or both of the above questions, provide an explanation of the violation(s) 3 Cumulative Impacts (DWQ Requirement) 3a Will this project (based on past and reasonably anticipated future impacts) result in ❑ Yes ® No additional development, which could impact nearby downstream water quality? 3b If you answered "yes' to the above, submit a qualitative or quantitative cumulative impact analysis in accordance with the most recent DWQ policy If you answered "no," provide a short narrative description 4 Sewage Disposal (DWQ Requirement) 4a Clearly detail the ultimate treatment methods and disposition (non - discharge or discharge) of wastewater generated from the proposed project, or available capacity of the subject facility Lower Creek Wastewater Treatment Plant Page 10 of 11 PCN Form — Version 1 3 December 10, 2008 Version 5 Endangered Species and Designated Critical Habitat (Corps Requirement) 5a Will this project occur in or near an area with federally protected species or ® Yes ❑ No habitat? 5b Have you checked with the USFWS concerning Endangered Species Act ❑ Yes ® No Impacts? ❑ Raleigh 5c If yes, indicate the USFWS Field Office you have contacted ❑ Asheville 5d What data sources did you use to determine whether your site would Impact Endangered Species or Designated Critical Habitat? http / /www fws gov/raleigh/species/cntylist/nc—counties html 6. Essential Fish Habitat (Corps Requirement) 6a WIII this project occur in or near an area designated as essential fish habitat? ❑ Yes ® No 6b What data sources did you use to determine whether your site would Impact Essential Fish Habitat? http / /www habitat noaa gov /protection /efh /efhmapper /index html 7 Historic or Prehistoric Cultural Resources (Corps Requirement) 7a WIII this project occur in or near an area that the state, federal or tribal governments have designated as having historic or cultural preservation ® Yes ❑ No status (e g , National Historic Trust designation or properties significant In North Carolina history and archaeology)? 7b What data sources did you use to determine whether your site would impact historic or archeological resources? http / /www hpo ncdcr gov Near historic downtown but will not Impact 8 Flood Zone Designation (Corps Requirement) 8a WIII this project occur in a FEMA - designated 100 -year floodplain? ❑ Yes ® No 8b If yes, explain how project meets FEMA requirements No permanent fill will be installed as part of this project 8c What source(s) did you use to make the floodplain determination? FIRM Map (see attached) R J Mozeley, PE Z — /f' f S- Applicant/Agent's Printed Name Date A pplican gent'g'Signature (Agent's signature is valid only if an authorization letter from the applicant is provided Page 11 of 11 PCN Form — Version 1 3 December 10, 2008 Version AGENT AUTHORIZATION FORM PROPERTY LEGAL DESCRIPTION LOT NO PLAN NO STREETADDRESS 1165 West Avenue Lenoir, North Carolina 28645 PARCELID 2749665644 Property Owner Bentley Larkin Cowles - City Sewer Easement Property Owner W Lane Bailey City Manager, City of Lenoir The undersigned, registered property owners of the above noted property, do hereby authorize R J Mozeley of McGill Associates, P A (Contractor/ Agent) (Name of Consulting Firm) To act on my behalf and take all actions necessary for the processing, issuance and acceptance of this permit or certification and any and all standard and special conditions attached Property Owner's Address (if different than property above) 840 West Avenue NW Lenoir, North Carolina 28645 Telephone (828) 757 -2200 We hereby certify that the above information submitted in this application is true and accurate to the best of our knowledge Authorized Signature,-,---- Authorized Signature Date 2 -/Z /S� Date CITY OF LENOIR Vendor NCDW1000 02/16/2015 NC DIVISION OF WATER RESOURCES Invoice Number Invoice Date PO Number Account Number Description NC DIV OF WATER 02/16/2015 60 -91- 7133 -190 PNC- STREAM CROSSD 310330 310330 Invoice Amount 24000 24000 pE LE+ N CITY OF LENOIR COMMUNITY ONE 310330 ti Of PO BOX 958 - LENOIR, NC 28645 LEN NC s6-2 - zisis31 310330 "PROVISION FOR THE PAYMENT OF THIS CHECK x (DRAFT) HAS BEEN MADE BY AN APPROPRIATION 0 DULY MADE, PURSUANT TO THE LOCAL AND FISCAL CONTROL ACT" y GOVERNMENT BUDGET CAgQ VOID AFTER 90 DAYS $ 240 DOLLARS AND 00 CENTS � • PAY 02/16/2015 * * * * * * ** *240.00 NC DIVISION OF WATER RESOURCES DISBURSING ACCOUNT TO THE ORDER 401 BUFFER PERMITTING UNIT OF 1650 MAIL SERVICE CENTER RALEIGH, NC 27699 -1650 rte' 11.31033011' l:053L02L9Lll:L0400468411• CITY OF LENOIR Vendor NCDW 1000 NC DIVISION OF WATER RESOURCES Invoice Number Invoice Date PO Number Account Number NC DIV OF WATEF 02/16/2015 60 -91- 7133 -190 310330 02/16/2015 310330 Description Invoice Amount PNC - STREAM CRO 24000 CHECK AMOUNT. 24000 -Printing: Layout Page Caldwell County Mamin Page 1 of 1 'tdl (1 42A) 7745 PROPOSED '� r� 5644 STREAM 4672 CROSSING � yir m � bfl 6419 I inch = 50 feel its map is prcpacd for the mrcntonl of real Ix%xrh found rs Am thisjunsdiction. ad is conpilcd to" mordcd deeds, plats, ad other pudic records and data. Usen of this map arc hcrcb� nrnfxd that the afbm wmuonxd INnblic pnman information sources should he consulted for ven fication of Ox information comamcd on this map. Caldrsell Ceum and its mapping and :wRsr ae con rxim ustme; no Icgal responst f the infomation contanred on this map or in this scebsuc This map and in fommtitm am NOT of I" sionn tpwht% and arc NOT snnlabk fo such on littp:Hgis.caldwellcountync.org/maps/layout.aspx 1/27/2015 c � wr.er sa w As SCALE 1.2$ 000 IIG�IICUS�C�aov few R� ►a�+t tir Al . ,.. 1 Ju W. W ss .�. ,i� �� lac � Sb � TrAc. GOYS. ZnrT9ntACfOlt$ O� V" 6�G Cfw► era.'--' rater a.—sa slew ayiRew� ♦STTTCx aaria.Q fa0� � �ti.�:.�A b. rd r.ei:.a =idrgs Md." i-A+ el .70 Af d �9! ftdbrW /r T.S.Id� Qr/rryh w� xr.u►e..r— $-a _ IFNOTR_ NC Qxxero 74 aAC4MO1a U.S. ARMY CORPS OF ENGINEERS WILMINGTON DISTRICT Action ID 2014 -01603 County Caldwell U S G S Quad NC- Lenoir GENERAL PERMIT (REGIONAL AND NATIONWIDE) VERIFICATION Pernnttee City of Lenoir / Lane Bailey Address 801 West Ave. NW Lenoir, North Carolina 28645 Telephone Number 828 - 757 -2200 Nearest Town Lenoir Nearest Waterway unnamed tributary to Lower Creek Coordinates 35.913 N, - 81545- W River Basin/ HUC Catawba Location description The project is located within an existing easement near West Ave. NW and Harper Ave., Lenoir, Caldwell County, North Carolina. Description of projects area and activity This permrttee is authorized to impact approximately 3651ft of an unnamed ti ibutary to Lower Creek to replace and repair an exisitmg culvert. The project involves removal of a 72 "X 52" CMP arch pipe culvert and replacing it with a 95" X 67" CMP arch pipe. Applicable Law N Section 404 (Clean Water Act, 33 USC 1344) ❑ Section 10 (Rivers and Harbors Act, 33 USC 403) Authorization Regional General Permit Number or Nationwide Permit Number 3 SEE ATTACNED RGP or NWT GENERAL, REGIONAL, AND SPECIAL CONDITIONS Your work is authorized by the above referenced permit provided it is accomplished in strict accordance with the attached conditions and your submitted application and attached information dated August 1, 2014 Any violation of the attached conditions or deviation from your submitted plans may subject the perm►ttee to a stop work order, a restoration order, a Class I administrative penalty, and /or appropriate legal action. This verification will remain valid until the expiration date identified below unless the nationwide /regional authorization is modified, suspended or revoked lf, prior to the expiration date identified below, the nationwide /regional permit authorization is reissued and/or modified, this verification will remain valid until the expiration date identified below, provided it complies with all requirements of the modified nationwide /regional permit If the nationwide /regional permit authorization expires or is suspended, revoked, or is modified, such that the activity would no longer comply with the terms and conditions of the nationwidehegional permit, activities which have commenced (i e , are under construction) or are under contract to commence in reliance upon the nationwide /regional permit, will remain authorized provided the activity is completed within twelve months of the date of the nationwide /regional permit's expiration, modification or revocation, unless discretionary authority has been exercised on a case -by -case basis to modify, suspend or revoke the authorization Activities subject to Section 404 (as indicated above) may also require an individual Section 401 Water Quality Certification You should contact the NC Division of Water Resources (telephone 919 - 807 -6300) to determine Section 401 requirements For activities occurring within the twenty coastal counties subject to regulation under the Coastal Area Management Act (CAMA), prior to beginning work you must contact the N C Division of Coastal Management This Department of the Army verification does not relieve the permittee of the responsibility to obtain any other required Federal, State or local approvals /pemuts If there are any questions reJxan erification, any of the conditions of the Permit, or the Corps of Engineers regulatory program, please contact Tash 8 8- 271 -7980 e t 226 or to a.l.alexander @usace.army.m►1 Corps Regulatory Official ate September 12, 2014 lexa er Expiration Date of Verification March 18, 2017 2014 -01603 Determination of Jurisdiction: A. ❑ Based on preliminary information, these appear to be waters of the US including wetlands within the above described project area This preliminary determination is not an appealable action under the Regulatory Program Administrative Appeal Process ( Reference 33 CFR Part 331) B. ❑ There are Navigable Waters of the United States within the above described project area subject to the permit requirements of Section 10 of the Rivers and Harbors Act and Section 404 of the Clean Water Act Unless there is a change in the law or our published regulations, this determination may be relied upon for a period not to exceed five years from the date of this notification C. ® There are waters of the US and/or wetlands within the above described project area subject to the permit requirements of Section 404 of the Clean Water Act (CWA)(33 USC § 1344) Unless there is a change in the law or our published regulations, this determination may be relied upon for a period not to exceed five years from the date of this notification D ❑ The jurisdictional areas within the above described project area have been identified under a previous action Please reference jurisdictional determination issued Action ID SAW- Basis for Determination: There are stream channels located on the property that exhibit indicators of ordinary high water marks The stream channel on the property is an unnamed tributary to Lower Creek which flows into the Catawba River The Catawba River is located in the Santee watershed and eventually drams to the Atlantic Ocean Specifically, the Catawba River j ours the Santee - Cooper River m South Carolina before entering the Atlantic Ocean Is a Section 10 water at the Mountain Island Lake Dam on Lake Wylie in Mecklenburg County This jurisdictional determination is valid for the impact areas only E. Attention USDA Program Participants This delmeation/determmation has been conducted to identify the limits of Corps' Clean Water Act jurisdiction for the particular site identified in this request The delmeation/determmation may not be valid for the wetland conservation provisions of the Food Security Act of 1985 If you or your tenant are USDA Program participants, or anticipate participation in USDA programs, you should request a certified wetland determination from the local office of the Natural Resources Conservation Service, prior to starting work. F. Appeals Information (This information applies only to approved jurisdictional determinations as indicated in B and C above). This correspondence constitutes an approved jurisdictional determination for the above described site If you object to tlus determination, you may request an administrative appeal under Corps regulations at 33 CFR Part 331 Enclosed you will find a Notification of Appeal Process (NAP) fact sheet and request for appeal (RFA) form If you request to appeal this determination you must submit a completed RFA form to the following address US Army Corps of Engineers South Atlantic Division Attn Jason Steele, Review Officer 60 Forsyth Street SW, Room 1OM15 Atlanta, Georgia 30303 -8801 Phone- (404) 562 -5137 In order for an RFA to be accepted by the Corps, the Corps must determine that it is complete, that it meets the criteria for appeal under 33 CFR part 331 5, and that it has been received by the Division Office within 60 days of the date of the NAP Should you decide to submit an RFA form, it must be received at the above address within 60 of the issue date below * *It is not necessary to submit an RFA form to the Division Office if you do not object to the determination in this correspondence * * 2014 -01603 Corps Regulatory Official a is Alexander Issue Date of JD September 12, 14 Expiration Date of JD Five years from Issue Date The Wilmington District 1s committed to providing the highest level of support to the public To help us ensure we continue to do so, please complete our Customer Satisfaction Survey, located online at http //regulatory usacesurvey com/ Copy furnished Matt Oettmg, McGill Associates, 1240 19th Street Lane, NW Hickory, North Carolina, 28601 2014 -01603 SPECIAL CONDITIONS Please review the attached North Carolina Wildlife Resources Commission letter dated September 10, 2014. Culverts greater than 48 inches in diameter will be buried at least one foot below the bed of the stream. Culverts 48 inches or less shall be buried at an appropriate depth to maintain aquatic passage as defined in Final Regional Condition 3.6 attached to this NWP. Please be advised that if additional impacts to waters of the U.S., either on this property or on /adjacent to this property and associated with this projectlactivity, are proposed at a later date, those impacts will be combined with the current impacts to waters of the U.S. and will be reviewed cumulatively. Generally, compensatory mitigation will be required if individual or cumulative (i e., past and present) losses or degradation of waters of the U.S. are greater than 150 linear feet of perennial or intermittent stream channel and /or 0.1 acre of wetland. Additionally, cumulative impacts that result in the loss or degradation of greater than 300 linear feet of perennial or intermittent* stream channel, and /or 0.5 acre of wetland, will be processed under an Individual Permit. This verification of the use of the Nationwide Permit Program for this protect does not imply that this office will necessarily approve any future proposal to impact waters of the U.S. on this property and /or associated with this projectlactivity. * The District Commander has the ability to waive the 300 linear foot limit for intermittent streams on a case -by- case basis. All requests for waiver must be in writing and shall include rationale for the request. Action ID Number. 2014 -01603 County Caldwell Permittee• City of Lenoir / Lane Bailey Date Verification Issued September 12, 2014 Project Manager- Tasha Alexander Upon completion of the activity authorized by thus permit and any mitigation required by the permit, sign this certification and return it to the following address US ARMY CORPS OF ENGINEERS WILMINGTON DISTRICT Attn.- CESAW -RG -A 151 Patton Avenue, Room 208 Asheville, North Carolina 28801 -5006 Please note that your permitted activity is subject to a compliance inspection by a U S Army Corps of Engineers representative. Failure to comply with any terms or conditions of this authorization may result in the Corps suspending, modifying or revoking the authorization and/or issuing a Class I administrative penalty, or initiating other appropriate legal action I hereby certify that the work authorized by the above referenced permit has been completed in accordance with the terms and condition of the said permit, and required mitigation was completed in accordance with the permit conditions Signature of Permittee Date �`� y � j 1 r�., i 1 � i i�!� N`'.�a '' i'i+_..y t #�� �� k`h 4.. ���i is.i4�x� 3t" �'''""SR' 15 � 4 t Y �_v'", •1^c ` {'(`� J r4� ��'� >tq �� �,'_ jl��'i'kir, rsfti�, rhi"��l s4'. -, :l�:l ��VPJ17.1 °��.[�1let�.SD ,ttii',.�i �i x� A �f s.,'�, `-_ �- Yriil`� R.':v„�` �-� {'i�Ct i ae+'• r .* .� 1" s '•,i+� t 5° X'4 �s N'v_ 4`��r �.` �',' �'- «�� �2 � r, .rya 'S_ �.,- ••;nr„`.,�^�e�lr t yyy, .�t� `i� if(`A� F #rte s�r�f. Sfd ^i �✓a ..a °'r i✓n �}3 ar 'Yrl+i ki "+_�.a \ a 1 it �e �^`"o' %,M�t �;�n:° Y! li w A licant City of Lenoir /Lane Bailey File Number SAW- 2014 -01603 Date. September 12, 2014 Attached is See Section below F11 INITIAL PROFFERED PERMIT Standard Permit or Letter of permission) A ❑ PROFFERED PERMIT (Standard Permit or Letter of permission) B ❑ PERMIT DENIAL C ® APPROVED JURISDICTIONAL DETERMINATION _ D F-11 PRELIMINARY JURISDICTIONAL DETERMINATION E SECTION I - The followmg ideptrfies your rights'and options tegardmg an administfa- ttve'uppealyof the aliove °d6cisiori. Additional i_hf6rnl t16n inay be fourid,at htt � Ip /www.usace. army -mil% Missions /Ci -i' ks %Re'ug'latoi�ProgramandPerriuts aspz or Co sire ulatio us at 33 614 Part 3� 1: A: INITIAL PROFFERED PERMIT: You may accept of object to the permit. • ACCEPT If you received a Standard Permit, you may sign the permit document and return it to the district engineer for final authorization If you received a Letter of Permission (LOP), you may accept the LOP and your work is authorized Your signature on the Standard Permit of acceptance of the LOP means that you accept the permit in its entirety, and waive all rights to appeal the permit, including its terms and conditions, and approved Jurisdictional determinations associated with the permit • OBJECT If you object to the permit (Standard or LOP) because of certain terms and conditions therein, you may request that the permit be modified accordingly You must complete Section II of this form and return the form to the district engineer Your objections must be received by the district engineer within 60 days of the date of this notice, or you will forfeit your right to appeal the permit in the future Upon receipt of your letter, the district engineer will evaluate your objections and may. (a) modify the permit to address all of your concerns, (b) modify the permit to address some of your objections, or (c) not modify the permit having determined that the pen-nit should be issued as previously written. After evaluating your objections, the district engineer will send you a proffered permit for your reconsideration, as indicated in Section B below B: PROFFERED PERMIT: You may accept or appeal the permit • ACCEPT If you received a Standard Permit, you may sign the permit document and return it to the district engineer for final authorization If you received a Letter of Permission (LOP), you may accept the LOP and your work is authorized Your signature on the Standard Permit or acceptance of the LOP means that you accept the permit in its entirety, and waive all rights to appeal the permit, including its terms and conditions, and approved jurisdictional determinations associated with the permit • APPEAL If you choose to decline the proffered permit (Standard or LOP) because of certain terms and conditions therein, you may appeal the declined permit under the Corps of Engineers Administrative Appeal Process by completing Section II of this form and sending the form to the division engineer This form must be received by the division engineer within 60 days of the date of this notice C: PERMIT DENIAL: You may appeal the demal of a permit under the Corps of Engineers Administrative Appeal Process by completing Section 11 of this form and sending the form to the division engineer This form must be received by the division engineer within 60 days of the date of this notice D: APPROVED JURISDICTIONAL DETERMINATION: You may accept or appeal the approved JD or provide new information • ACCEPT You do not need to notify the Corps to accept an approved JD Failure to notify the Corps within 60 days of the date of this notice, means that you accept the approved JD in its entirety, and waive all rights to appeal the approved JD • APPEAL If you disagree with the approved JD, you may appeal the approved JD under the Corps of Engineers Administrative Appeal Process by completing Section II of this form and sending the form to the district engineer This form must be received by the division engineer within 60 days of the date of this notice E: PRELIMINARY JURISDICTIONAL DETERMINATION You do not need to respond to the Corps regarding the preliminary JD The Preliminary JD is not appealable If you wish, you may request an approved JD (which may be appealed), by contacting the Corps district for further instruction Also you may provide new information for further consideration by the Corps to reevaluate the JD t `�-. f' S-'i � Z'. > '4 L � �� LL-- � i. ��.'.�'..— «� �' its �- ..! -!y _�' i ;a3 ✓'- -, .''�� .. _'S: e- °i � a]t:zY SECT Ir, -' REQYJESTFOI�APPR or OB7 CT�OI�7S ;T0 T 1NI"1IAX I?X2OFFER D'1 LI21VII7 - REASONS FOR APPEAL OR OBJECTIONS (Describe your reasons for appealing the decision or your objections to an initial proffered permit in clear concise statements You may attach additional information to this form to clarify where your reasons or objections are addressed in the administrative record ) ADDITIONAL INFORMATION The appeal is limited to a review of the administrative record, the Corps memorandum for the record of the appeal conference or meeting, and any supplemental information that the review officer has determined is needed to clarify the administrative record Neither the appellant nor the Corps may add new information or analyses to the record However, you may provide additional information to clarify the location of information that is already in the administrative record POINT Ok CONTACT. FOR' UESTIONS,;O' INORMATON If you have questions regarding this decision and/or the If you only have questions regarding the appeal process you may appeal process you may contact also contact District Engineer, Wilmington Regulatory Division, Attn.: Mr Jason Steele, Administrative Appeal Review Officer 151 Patton Avenue CESAD -PDO Room 208 U S Army Corps of Engineers, South Atlantic Division Asheville, North Carolina 28806 60 Forsyth Street, Room 1OM15 Tasha Alexander Atlanta, Georgia 30303 -8801 828 - 271 -7980 Phone: 404 562 -5137 RIGHT OF ENTRY Your signature below grants the right of entry to Corps of Engineers personnel, and any government consultants, to conduct investigations of the project site during the course of the appeal process You will be provided a 15 day notice of any site investigation, and will have the opportum to participate in all site invests rations Date Telephone number. Signature of appellant or agent For appeals on Inuial Proffered Permits send this form to: District Engineer, Wilmington Regulatory Division, Attn : Tasha Alexander, 69 Darlington Avenue, Wilmington, North Carolina 28403 For Permit denials, Proffered Permits and approved Jurivdietional Deternunationv vend this form to: Division Engineer, Commander, U S. Army Engineer Division, South Atlantic, Attn: Mr. Jason Steele, Administrative Appeal Officer, CESAD -PDO, 60 Forsyth Street, Room 1OM15, Atlanta, Georgia 30303 -8801 Phone: (404) 562 -5137 ® North Carolina Wildlife Resources Commission Gordon Myers, Executive Director September 10, 2014 Ms Tasha Alexander U S Army Corps of Engineers, Regulatory Branch 151 Patton Avenue, Room 208 Asheville, North Carolina 28801 -5006 SUBJECT Comments on West Avenue Culvert Replacement Project Lenoir, Caldwell County Dear Ms Alexander, Biologists with the North Carolina Wildlife Resources Commission (NCWRC) reviewed an application for the replacement of culverts carrying stormwater and an unnamed stream in the City of Lenoir Our comments on this application are offered for your consideration under provisions of the Clean Water Act of 1977 (33 U S C. 466 et seq ) and Fish and Wildlife Coordination Act (48 Stat 401, as amended, 16 U S C 661- 667d). This project should not affect trout and construction does not need to be avoided during the trout spawning moratorium We do not recommend adding any special conditions to the permit Thank you for the opportunity to review and comment on this project Please contact me at (828) 296- 4720 if you have any questions about these comments Sincerely, Andrea Leslie Mountain Region Coordinator Habitat Conservation Program ec Tim Fox, NC Division of Water Resources Matt Oettmg, McGill Associates Mailing Address: Division of Wand Fisheries • 1721 Mail Service Center • Raleigh, NC 27699 -1721 Telephone: (919) 707 -0220 • Fax: (919) 707 -0028