Loading...
HomeMy WebLinkAboutNCC201720_NOT Closeout Documents_20230124North Carolina Department of Environmental Quality Land Resources: 610 East Center Avenue, Suite 301, Mooresville, NC 28115 (704) 663-1699 Countv: Cabarrus Project: New Mateenbar Facility in Concord, NC River basin: Yadkin-PeeDee Person financially responsible: 201 ConcordNC Inc - Sam Costa, Authorized A.-enT Project #: CABAR-2020-068 Address: 151 Alhitehall Drive, Markham, ON CA L.3R 9TI L Project Location: Highway 49, Concord Pictures: No 2. Weather and soil conditions: sunny, workable soils Initial inspection: No 3. Is site currently under notice of violation? No 4. Is the site in compliance with S.P.C.A. and rules? Yes If no, check violations below: 5. Violations: 6. Is the site in compliance with NPDES Permit NCG010000 Construction Stormwater requirements? . Describe: 7. Has sedimentation damage occurred since last inspection? No If Yes, where? (check all that apply) Degree of damage: 8. Contact made with (name): no one on site at the time of the inspection Title: Inspection report: Sent Report Date given/sent: November 18, 2022 9. Corrective action needed: 10. Comments: Permanent ground cover sufficient to restrain erosion has been established. No additinnnl `QTfmonitorittg or self -inspections are required. Project is in compliance and released under the SPCA. Termination of coverage under the NPDES General Stormwater Permit for Construction Activities (NCGOI) must be requested by the permittee via a Notice of Termination (NOT). The NOT is available at: https:i`ledocs.deq.nc.gov/Forms,NCGOI-Termination_ Please note that this correspondence must be uploaded as part of completing the NOT process. Reported by: Matthew Gigante Others present: Date of inspection: November 09, 2022 Time arriving on site: 12:20 PM Time leaving site: 12:30 PM cc: Yes