HomeMy WebLinkAboutNCC202487_NOT Closeout Documents_20230124North Carolina Department of Environmental Quality
Land Resources: Systel Building, 225 Green Street, Suite 714, Fayetteville, NC 28301-5094
(910) 433-3300
County: Anson Project: Line 44 Retirement
Person financially responsible: Piedmont Natural Gas - Randy Webb, Operations
Manager
Address: 185 Enterprise Drive, Rockingham, NC 28379
1. Project Location: Stanback Ferry Ice Plant Road, Wadesboro
Pictures: No
River basin: Yadkin-PeeDee
Project #: ANSON-2020-006
NCC202487
2. Weather and soil conditions: dry, workable soils Initial inspection: No
3. Is site currently under notice of violation? No
4. Is the site in compliance with S.P.C.A. and rules? Yes If no, check violations below:
5. Violations:
6. Is the site in compliance with NPDES Permit NCGO10000 Construction Stormwater requirements? Yes
Describe:
7. Has sedimentation damage occurred since last inspection? No If Yes, where? (check all that apply)
Degree of damage:
8. Contact made with (name): Stephen Williams, Daniel White Title: Lead EHS Inspector, Environmental
Compliance Lead
Inspection report: Sent Report Date given/sent: December 15, 2022
9. Corrective action needed:
10. Comments: Permanent ground cover sufficient to restrain erosion has been established. No additional
self -monitoring or self -inspections are required. Project is in compliance and released under
the SPCA. Termination of coverage under the NPDES General Stormwater Permit for
Construction Activities must be requested by the permittee via a Notice of Termination
(NOT). The NOT is available at: https://edocs.deq.nc.gov/Fonns/NCGOI-Termination.
Please note that this correspondence must be uploaded as part of completing the Notice of
Termination process.
Reported by: Melissa Joyner Others present:
Date of inspection: December 13, 2022 Time arriving on site: 10:00 AM Time leaving site: 11:30 AM
cc: Stephen Williams, Daniel White (via email)