Loading...
HomeMy WebLinkAboutNC0072877_Annual Performance Report 2015_20150209 - RECEIVEDIDENRIDWR FEB 0 9 2015 TOWN OF NEWTON GROVE Water Duality P.O.Box 4 Permitting Section Newton Grove,N.C. 28366 (910)594-0827 fax: (910)236-9018 February 4,2015 Daryl Merritt PERCS System Performance Annual Report North Carolina Division of Water Resources 1617 Mail Service Center Raleigh,N.C. 27699-1716 Mr. Merritt: Enclosed is the Wastewater Annual Performance Report for the Town of Newton Grove for calendar year 2014. If you have questions or comments you may call me directly at(910) 591-7871. Regards, / ' / Ballance Public Works Dept. ir Encl Cc: file Town of Newton Grove Wastewater System 2014 Performance Annual Report I. General Information Facility/System Name: Town of Newton Grove Responsible Entity: Barbara F. Burch, Mayor(910) 594-0827 Person in Charge/Contact: Jim Ballance, ORC (910) 594-0827 cell - (910) 591-7871 Applicable Permits:NCIM72X77, WQ0010470 Description of Collection System or Treatment Process: The collection system consists of five lift stations located throughout the Town and 125 low pressure grinder pumps at customers homes. The main lift station that takes the wastewater to the treatment plant is located on Clinton Street at the Park. This lift station is fed by a gravity sewer. A lift station is located at McDonald's on 50/55 highway at I-40. A lift station is located approximately one mile outside the Town limits on 50/55 highway. Another lift station is located at the trailer park on Mt Olive highway. A lift station is located four miles down US Hwy 701S,at Hobbton School and pumps directly to the treatment plant. The treatment plant is located on Pork Chop Hill Road off Bryan Road. It consists of a bar screen, flow equalization basin, an oxidation ditch/clarifier, a tertiary sand filter, aerobic digester, and flow monitoring/disinfection station. Ultraviolet light is used to disinfect the water before being discharged into Beaver Dam Swamp and ultimately into Coharie Creek. A generator is located on site and is used to supply backup power to the wastewater treatment plant during power outages. The generator is automatically exercised weekly to insure proper operation during outages. All sludge generated at the plant enters an aerobic digester. Upon proper digestion,the sludge is then applied on a 7.4 acre permitted site (Permit#WQ0010470),adjacent to the treatment plant. Approximately 150,000 gallons of sludge are applied each year. II. Performance There were no violations reported for 2014. Sewage Spills No reportable spills occurred during the year 2014. III.Notification A copy of this report is located at Town Hall for review by the sewer use customers. All customers have been notified that this report is available for their review and copies will be made and distributed as requested. IV. Certification I certify under penalty of law that this report is complete and accurate to the best of my knowledge. I further certify that this report has been made available to the users or customers of the named system and that those users have been notified of its availability. 1 &JIMA 1-- TC1/41 a-1-1 -aoL3 Barbara F. Burch Date Mayor Town of Newton Grove