HomeMy WebLinkAboutNC0072877_Annual Performance Report 2015_20150209 - RECEIVEDIDENRIDWR
FEB 0 9 2015
TOWN OF NEWTON GROVE Water Duality
P.O.Box 4 Permitting Section
Newton Grove,N.C. 28366
(910)594-0827
fax: (910)236-9018
February 4,2015
Daryl Merritt
PERCS
System Performance Annual Report
North Carolina Division of Water Resources
1617 Mail Service Center
Raleigh,N.C. 27699-1716
Mr. Merritt:
Enclosed is the Wastewater Annual Performance Report for the Town of Newton
Grove for calendar year 2014. If you have questions or comments you may call me
directly at(910) 591-7871.
Regards,
/ ' /
Ballance Public Works Dept.
ir
Encl
Cc: file
Town of Newton Grove Wastewater System
2014 Performance Annual Report
I. General Information
Facility/System Name: Town of Newton Grove
Responsible Entity: Barbara F. Burch, Mayor(910) 594-0827
Person in Charge/Contact: Jim Ballance, ORC (910) 594-0827 cell - (910) 591-7871
Applicable Permits:NCIM72X77, WQ0010470
Description of Collection System or Treatment Process:
The collection system consists of five lift stations located throughout the Town and 125 low
pressure grinder pumps at customers homes. The main lift station that takes the wastewater to
the treatment plant is located on Clinton Street at the Park. This lift station is fed by a gravity
sewer. A lift station is located at McDonald's on 50/55 highway at I-40. A lift station is located
approximately one mile outside the Town limits on 50/55 highway. Another lift station is
located at the trailer park on Mt Olive highway. A lift station is located four miles down US
Hwy 701S,at Hobbton School and pumps directly to the treatment plant. The treatment plant is
located on Pork Chop Hill Road off Bryan Road. It consists of a bar screen, flow equalization
basin, an oxidation ditch/clarifier, a tertiary sand filter, aerobic digester, and flow
monitoring/disinfection station. Ultraviolet light is used to disinfect the water before being
discharged into Beaver Dam Swamp and ultimately into Coharie Creek. A generator is located
on site and is used to supply backup power to the wastewater treatment plant during power
outages. The generator is automatically exercised weekly to insure proper operation during
outages.
All sludge generated at the plant enters an aerobic digester. Upon proper digestion,the
sludge is then applied on a 7.4 acre permitted site (Permit#WQ0010470),adjacent to the
treatment plant. Approximately 150,000 gallons of sludge are applied each year.
II. Performance
There were no violations reported for 2014.
Sewage Spills
No reportable spills occurred during the year 2014.
III.Notification
A copy of this report is located at Town Hall for review by the sewer use customers. All
customers have been notified that this report is available for their review and copies will be made
and distributed as requested.
IV. Certification
I certify under penalty of law that this report is complete and accurate to the best of my
knowledge. I further certify that this report has been made available to the users or customers of
the named system and that those users have been notified of its availability.
1
&JIMA 1-- TC1/41 a-1-1 -aoL3
Barbara F. Burch Date
Mayor
Town of Newton Grove