HomeMy WebLinkAbout20221424 Ver 1_Encl 2 - DCM-MP 2 Excavation and Fill - Lane, Revised 01-24-2023_20230124 (2)Form DCM MP-2
EXCAVATION and FILL
(Except for bridges and culverts)
Attach this form to Joint Application for CAMA Major Permit, Form DCM MP-1. Be sure to complete all other sections of the Joint
Application that relate to this proposed project. Please include all supplemental information.
Describe below the purpose of proposed excavation and/or fill activities. All values should be given in feet.
Access
Channel
(NLW or
NWL)
Canal
Boat Basin
Boat Ramp
Add'. Riprap
2 Sides
Rock Groin
Rock
Breakwater
Other
(excluding
shoreline
stabilization)
Length
13 (12 + 1)
Width
15 (10.5 + 4.5)
Avg. Existing
Depth
1.5
NA
NA
Final Project
Depth
1.0
NA
NA
1. EXCAVATION
® This section not applicable
a. Amount of material to be excavated from below NHW or NWL in
cubic yards.
c. (i) Does the area to be excavated include coastal wetlands/marsh
(CW), submerged aquatic vegetation (SAV), shell bottom (SB),
or other wetlands (WL)? If any boxes are checked, provide the
number of square feet affected.
❑CW ❑SAV ❑SB
❑WL ®None
(ii) Describe the purpose of the excavation in these areas:
b. Type of material to be excavated.
d. High -ground excavation in cubic yards.
2. DISPOSAL OF EXCAVATED MATERIAL ®This section not applicable
a. Location of disposal area.
c. (i) Do you claim title to disposal area?
®Yes ❑No ❑NA
(ii) If no, attach a letter granting permission from the owner.
e. (i) Does the disposal area include any coastal wetlands/marsh
(CW), submerged aquatic vegetation (SAV), shell bottom (SB),
or other wetlands (WL)? If any boxes are checked, provide the
number of square feet affected.
❑CW ❑SAV ❑SB
❑WL ®None
(ii) Describe the purpose of disposal in these areas:
b. Dimensions of disposal area.
d. (i) Will a disposal area be available for future maintenance?
❑Yes ❑No ®NA
(ii) If yes, where?
f. (i) Does the disposal include any area in the water?
®Yes ❑No ❑NA
(ii) If yes, how much water area is affected?
252-808-2808 :: 1-888-4RCOAST :: www.nccoastalmanagement.net revised: 12/26/06
C i. .w.
nrnn RID_' /Exr_avafinn and Fill, Page 2 of 2)
3. SHORELINE STABILIZATION
(If development is a wood groin, use MP-4 — Structures)
❑ This section not applicable
a. Type of shoreline stabilization:
®Bulkhead ❑Riprap ❑Breakwater/Sill ❑Other:
c. Average distance waterward of NHW or NWL: 24.5-ft
e. Type of stabilization material:
Vinyl Sheetpile
g•
Number of square feet of fill to be placed below water level.
Bulkhead backfill 8,086 Riprap
Breakwater/Sill Other
i. Source of fill material.
Back fill: excavated from uplands on -site adjoining erosion
escarpment, and/or trucked in from sandpit.
b.
d.
f.
h.
Length: 329' at shoreline. 40' along boatramp. 15' east return wall
Width: 2-ft
Maximum distance waterward of NHW or NWL: 47.5
(i) Has there been shoreline erosion during preceding 12
months?
®Yes ❑No ❑NA
(ii) If yes, state amount of erosion and source of erosion amount
information.
Previous resident indicates no erosion util after storm —18
months ago, when bulkhead failed. 2/2022 Google imagery
compared to current measurements gives 35'/yr erosion rate.
Type of fill material.
Graded adjoining uplands of Roanoke Silt Loam, or trucked -in
clean sand.
4. OTHER FILL ACTIVITIES
(Excluding Shoreline Stabilization)
❑ This section not applicable
a. (i) Will fill material be brought to the site? ®Yes ❑No ❑NA
If yes,
(ii) Amount of material to be placed in the water 69 sf. 48 cf
(iii) Dimensions of fill area irregular: 12' x 4.5'+ 1' x 15'
(iv) Purpose of fill
Supplement riprap armor alongside Boatramp
b.
(i) Will fill material be placed in coastal wetlands/marsh (CW),
submerged aquatic vegetation (SAV), shell bottom (SB), or
other wetlands (WL)? If any boxes are checked, provide the
number of square feet affected.
❑CW ❑SAV ❑SB
❑WL ®None
(ii) Describe the purpose of the fill in these areas:
N/A
5. GENERAL
a. How will excavated or fill material be kept on site and erosion
controlled?
Bulkhead will be constructed and sealed before backfill is placed.
c. (i) Will navigational aids be required as a result of the project?
❑Yes No ❑NA
(ii) If yes, explain what type and how they will be implemented.
b. What type of construction equipment will be used (e.g., dragline,
backhoe, or hydraulic dredge)?
Excavator
d. (i) Will wetlands be crossed in transporting equipment to project
site? ❑Yes No ❑NA
(ii) If yes, explain steps that will be taken to avoid or minimize
environmental impacts.
09/26/2022; Amended 01/24/2023
Date
Lane Shoreline Development Project
Sharon R. Lane
Applicant
Theodore Sampson (Agent)
Project Name
Applicant Signature
252-808-2808 :: 1-888-4RCOAST :: www.nccoastalmanagement.net
revised: 12/26/06