Loading...
HomeMy WebLinkAboutNCC230231_ESC Approval Submitted_20230126TOWN OF WEDDINGTON EROSION and SEDIMENTATION CONTROL COMPLIANCE FORM Tracts Less than One -Acre Disturbed Residential and Commercial This compliance form shall be prominently displayed at the primary entrance to the site of the land disturbing activity Before construction begins and remain until all construction is complete. PROPERTY ADDRESS: L _ alw-----PARCEL ID:. l5 NAME OF SUBDIVISION: -^l i ZdA,pi, a hoexe LOT It: 4 NAME OF PROPERTY OWNER: j V V1 to 0ss i G q _ NAME OF CONSTRUCTION COMPANY; < erS t-U S m Tt" ci ✓te NAME OF CONSTRUCTION MANAGER: / V f C, 1G 4 S _GN _ ( ,S CONSTRUCTION MGR PHONE #: , lot' -24 LI —q" % Z-- EMAIL: _j� P'L' f'i!� � l)i l t'�� cVllt704 �,d�'�I�� fo0l PROPOSED START DATE OF CONSTRUCTION: PLEASE READ THE BACKSIDE BEFORE COMPLETING. Choose one of the following approaches: ❑ The most appropriate option from the back of this form Is option, or a combination of options and The sediment control plan Is as drawn in the space to the Q- right er's . ttached. Notes: r EROSION CONTROL PLAN E-7 THE UNDERSIGNED HEREBY CERTIFIES THAT HE/SHE HAS READ THE INFORMATION ON THE BACK OF THIS FORM AND IS AWARE OF THE STATED REQUIREMENTS OF THE EROSION AND SEDIMENTATION CONTROL ORDINANCE. THE OWNER MUST COMPLY WITH THE PROVISION OFTHE ORD]NAN E .TT ,E-UNDE651.GNE4.ACKNQW-LEDGES FINANCIAL RESPONSIBILITY FOR PAYMENT OF ALL FEES ASSOCIATED WITH THIS PROJECT. PROPERTY OWNER/AUTHORIZED AGENT SIGNATURE PRINT NAME _-70 (-r - � 6 `f - 'I �1. o(W bpi,, Irk m (/, cd ►- 11 /j t zo7 Z. PHONE EMAILDATE APPLICANT CHECKLIST: OFFICE USE ONLY ❑ Exempt from installation of ESC measures. REASON: ❑ IN An Erosion Control Plan Approval is required. REASON: area to be disturbed: 0.50; not covered by dev. FRP N Attach approved NCG01 Certificate of Compliance (CoC) (available at www.deq.nc.gov) 0 ❑ An Existing driveway will be used as the Temporary Construction Entrance. 0 ❑ Install Temporary Gravel Construction Entrance In accordance with NCDENR detail attached and as D Indicated above. (Atch A) ❑ Install Silt Fencing with steel posts in accordance with NCDENR detail attached and as indicated ❑ above. (Atch B) ❑ Confine siltation within 25% of lake or water course buffer zone per ESC Ord. Section 58.606 (a). ❑ ❑ Call Gary Wright of LaBella Engineering (704) 351-5306 for inspection 48 hours prior to start of work for Inspection of measures. n Groundcover on all slopes shall be established within 21 days of completion of any phase of construction Q (Sect. S8.606 (b)). Upon completion of any phase of construction permanent groundcover shall be established within 60 calendar days (Sect. 58.606 (d)) Town of Weddington Zoning Permit/Project #23-00047 APPROVED BY: DATE: 01-24-23