Loading...
HomeMy WebLinkAbout20140687 Ver 1_Certification of Completion_20150213FTWA NCDENR North Carolina Department of Environment and Natural Pat McCrory Governor DWR Project No: Applicant: r,ZOI q OCR$ 7 County: CRY of I�gcrSCK3 VILLC, I& FEB 13 2015 Donald R. van der Vaart Secretary Project Name: 13e4LXa,,s 1IZ�10 —rOOEZ 401 Water Quality Certification Issued Date: 7be l Certificate of Completion Upon completion of all work approved within the 401 Water Quality Certification or applicable Buffer Rules, and any subsequent modifications, the applicant is required to return this certificate to the DWR 401 & Buffer Permitting Unit, 1650 Mail Service Center, Raleigh, NC, 27699 -1650. This form may be returned to DWR by the applicant, the applicant's authorized agent, or the project engineer. It is not necessary to send certificates from all of these. Applicant's Certification 1, . hereby state that, to the best of my abilities, due care and diligence was used in the observation of the construction such that the construction was observed to be built within substantial compliance and intent of the 401 Water Quality Certification and Buffer Rules, the approved plans and specifications, and other supporting materials. Signature: Date: Agent's Certification I, b"3 l�3£l C N6tZ FCxwj -US hereby state that, to the best of my abilities, due care and diligence was used in the observation of the construction such that the construction was observed to be built within substantial complia a . ntent of the 401 Water quality Certification and Buffer Rules, the approved plans and sp <zati other supporting materials. Signature: Date: oZ /�.f If this project was designed by a Certified Professional 1, . as a duly registered Professional (i.e., Engineer, Landscape Architect, Surveyor, etc.) in the State of North Carolina, having been authorized to observe (periodically, weekly, full time) the construction of the project, for the Permitee hereby state that, to the best of my abilities, due care and diligence was used in the observation of the construction such that the construction was observed to be built within substantial compliance and intent of the 401 Water Quality Certification and Buffer Rules, the approved plans and specifications, and other supporting materials. Signature: Date: Division of Water Resources -401 & Buffer Pennitti g Una 1617 Mail Service Center, Raleigh, North Carolina 27699 -1617 Location, 512 N Salsbury SL Raleigh, North Carolina 27604 Phone 91980783001 FAX 919807-6492 Internet www.nciraterqualityorgi MEpul Oppud,d IA%n A. EnViOW-M;iwnparbr rwy papw