Loading...
HomeMy WebLinkAbout20120345 Ver 1_Certification of Completion_201502184 *A �� v 5D North Carolina Department of Environment and Division of water Resources Water Quality Programs Pat McCrory Thomas A Reeder Governor Director DWR Project No: p7 O) 2-- (nl) 7—County: Applicant. �,'� to /� c r Project Name: ( �J Cl I,= 4 ;—, c � �� 401 Water Quality Certification Issued Date: Certificate of Completion 1) 9.. ( 6 Natural Resources Jahn E Sltvarta, III Secretary S5 Upon completion of all work approved within the 401 Water Quality Certification or applicable Buffer Rules, and any subsequent modifications, the applicant is required to return this certificate to the DWR 401 & Buffer Permitting Unit, 1650 Mail Service Center, Raleigh, NC, 27699 -1650. This form may be returned to DWR by the applicant, the applicant's authorized agent, or the project engineer. It is not necessary to send certificates from all of these Ap Certificatipn ) `r—lt �° F hereby state that, to the best of my abilities, due care and diligence was used in the observation of the construction such that the construction was observed to be built within substantial compliance and Intent of the 401 Water Quality Certification and Buffer Rules, the approved plan specifications, and other supporting materials. Signature: V f J� _ — j Date Agent's Certification 1, hereby state that, to the best of my abilities, due care and diligence was used in the observation of the construction such that the construction was observed to be built within substantial compliance and intent of the 401 Water Quality Certification and Buffer Rules, the approved plans and specifications, and other supporting materials. Signature Date: If this project was designed by a Certified Professional 1, as a duly registered Professional Engineer, Landscape Architect, Surveyor, etc ) in the State of North Carolina, having been authorized to observe (periodically, weekly, full time) the construction of the project, for the Permitee hereby state that, to the best of my abilities, due care and diligence was used in the observation of the construction such that the construction was observed to be built within substantial compliance and intent of the 401 Water Quality Certrfcation and Buffer Rules, the approved plans and specifications, and other supporting materials Signature: 401 Huffer PermlWrg Unit 1650 Mall Service Center, Raleigh. North Carolina 27699 -1650 Loceion 512 N Salisbury SL Raleigh, North Carolina 27604 Phone 91H07.63001 FAX 9196076494 Internet w nmiemua6fv, om Al EWal OPpatu* I AlfirmahtAction Empky r Date: