HomeMy WebLinkAboutNC0029297_Authorization to Construct_19940729State of North Carolina
Department of Environment,
Health and Natural Resources
Division of Environmental Management
James B. Hunt, Jr., Governor
Jonathan B. Howes, Secretary
A. Preston Howard, Jr., P.E., Director
July 29, 1994
Mr. Mark Bumgamer
Catawba County Schools
PO Box 1000
Newton, NC 28658
75‘7:,A
GoEHNFl
Subject: Permit No. NC0029297
Authorization to Construct
Catawba County Schools
Fred T. Foard High School
Wastewater Treatment Facility
Catawba County
Dear Mr. Bumgarner,
A letter of request for an Authorization to Construct was received January 24, 1994 by the Division
and final plans and specifications for the subject project have been reviewed and found to be satisfactory.
Authorization is hereby granted for expansion to 0.030 MGD, including the construction of a septic tank
and gravity sewer for the proposed West Catawba Middle School,combiningthe resulting effluent with the
wastewater from the septic tank at the Fred T. Foard High School,applying the wastewater to existing
recirculating sandfilters located at the high school, and for the addition of dechlorination with discharge of
treated wastewater into Pott Creek.
This Authorization to Construct is issued in accordance with Part III, Paragraph A of NPDES
Permit No. NC0029297 issued July 29, 1994, and shall be subject to revocation unless the wastewater
treatment facilities are constructed in accordance with the conditions and limitations specified in Permit No.
NC0029297.
The sludge generated from these treatment facilities must be disposed of in accordance with G.S.
143-215.1 and in a manner approved by the North Carolina Division of Environmental Management.
In the event that the facilities fail to perform satisfactorily, including the creation of nuisance
conditions, the Permittee shall take immediate corrective action, including those as may be required by this
Division, such as the construction of additional or replacement wastewater treatment or disposal facilities.
The Mooresville Regional Office, telephone number 704/663-1699 , shall be notified at least forty-
eight (48) hours in advance of operation of the installed facilities so that an in -place inspection can be
made. Such notification to the regional supervisor shall be made during the normal office hours from 8:00
a.m. until 5:00 p.m. on Monday through Friday, excluding State Holidays.
Upon completion of construction and prior to operation of this permitted facility, a certification
must be received from a professionalengineer certifying that the permitted facility has been installed in
accordance with the NPDES Permit, this Authorization to Construct and the approved plans and
specifications. Mail the Certification to the Permits and Engineering Unit, P.O. Box 29535, Raleigh, NC
27626-0535.
Upon classification of the facility by the Certification Commission, the Permittee shall employ a
certified wastewater treatment plant operator to be in responsible charge (ORC) of the wastewater treatment
Box 29535, Raleigh, North Carolina 27626-0535 Telephone 919-733-7015 FAX 919-733-2496
An Equal Opportunity Affirmative Action Employer 50% recycled/ 10% post -consumer paper
Permit No. NC0029297
Authorization to Construct
Catawba County Schools
July 29, 1994
Page 2
facilities. The operator must hold a certificate of the type and grade at least equivalent to or greater than the
classification assigned to the wastewater treatment facilities by the Certification Commission. The
Permittee must also employ a certified back-up operator of the appropriate type and grade to comply with
the conditions of Title 15A, Chapter 8A, .0202. The ORC of the facility must visit each Class I facility at
least weekly and each Class II, III, and IV facility at least daily, excluding weekends and holidays, and
must properly manage and document daily operation and maintenance of the facility and must comply with
all other conditions of Title 15A, Chapter 8A, .0202. Once the facility is classified, the Permittee must
submit a letter to the Certification Commission which designates the operator in responsible charge within
thirty days after the wastewater treatment facilities are 50% complete.
A copy of the approved plans and specifications shall be maintained on file by the Permittee for the
life of the facility.
A leakage test shall be performed on the septic tank to insure that any exfiltration occurs at a rate
which does not exceed twenty (20) gallons per twenty-four (24) hour per 1,000 gallons of tank capacity.
The engineer's certification will serve as proof of compliance with this condition.
Failure to abide by the requirements contained in this Authorization to Construct may subject the
Permittee to an enforcement action by the Division of Environmental Management in accordance with
North Carolina General Statute 143-215.6A to 143-215.6C.
The issuance of this Authorization to Construct does not preclude the Permittee from complying
with any and all statutes, rules, regulations, or ordinances which may be imposed by other government
agencies (local, state, and federal) which have jurisdiction.
One (1) set of approved plans and specifications is being forwarded to you. If you have any
questions or need additional information, please contact Charles Alvarez, telephone number 919/733-
5083.
Sincerely,
/' Preston oward, Jr., P.E.
cc: Catawba County Health Department
Mooresville Regional Office, Water Quality
Training and Certification Unit
Facilities Assessment Unit
Frank C. Cockinos & Assoc., Bryan Smith
EB 90
f tl6
SOC PRIORITY PROTECT: No
To: Permits and Engineering TJnit
Water Quality Section
Attention: Charley. Alvarez
Date: January 28, 1994
AUTHORIZATION TO CONSTRUCT
NPDES PERMIT
REPORT AND RECOMMENDATIONS
County: ratawha
MRO Nn,: 94-23
Permit Nn, NC002a2a7
PART I - GENERAL iNFORMpTION
Facility and Address.: Fred T. Foard High School
r/n Catawha County Srlhnnls
of flee Box 1nn0
Newton, N.C. 28658
Date of On -Site investigation (if conducted); N/p
?, Report Prepared Ry: Michael L. Parker, Environ. Engr: ii
!'g
4. Persons Contacted and Telephone Numher: Frank C. Cockinoc,
(704) 372-4464.
5. Verified Discharge Pnint(s), List for All Discharge Points:
Latitude: 35° 36.' 43" Longitude: R1° 22' 27"
Attach a LTSGS map extract and indicate treatment f aci 1 it1
site and discharge point on map. Ensure discharge point(s)
correspond to'NPDES permitted discharge points.
USGS Quad No.: E 13 SE
ti_ Site size and expansion area consistent with application?
Yes.
7. Topography (relationship to flood plain included): Rolling,
3-8% slopes. Facility is not located in a flood plain area.
8 Location of Nearest Dwelling: None within 300 feet of the
site,
Page Two
PART II - DESCRIPTION OF DISCHARGE AND TREATMENT WORKS
1. Existing Treatment Facility
a. Current permitted capacity: 0,02n MCD
b. nate(s) and construction activities allowed by previous
ATCs issued in the previous two (2) years: N/A.
Actual treatment rapacity of the current facility
(design riume) : 0.020 MGD,
d. Description of existing or substantially constructed
WWT facilities: The existing WWT facilities consist of
a grease trap followed by a 20,500 gallon capacity
septic tank, a 14,000 gallon recirculation tank, two
(2) surface sand filters, flow measurement, a chlorine
contact tank with tablet disinfection_ and cascade
aeration.
2 Type of Proposed Treatment Facility: The applicant proposes
to construct a septic tank and a gravity sewer to connect
the wastewater generated at the proposed West Catawba Middle
School to the existing facilities,
3. Res duals Handling and Util i zation!Distosal Schpmp:
Residuals are removed as nPP(1Pfa by a septage hauler and
taken to a City of Hickory WWTP for disposal.
4. Treatment Plant Classification (attached Completed ration
sheet): Class I
5. SIC Code(s): 8211
Wastewater Code(s):
Primary: 03
Secondary: N/A
Main Treatment Unit Code: 45007
6. Important SOC/,JOC nr Compl i ante Schedul e Dates: N/A
r
15 ez 3.1A1A, 4,nk (c 1 ArsiO (LoUec_bk& ,,a, w,it G c.1,0c.d9 Are=GcSCsD.-
Page Three
PART III - EVALUATION AND RECOMMENDATIONS
in a 1 PttPr rat Pr nrfnhPr 26, 1991 from Mr. Frank C.
for Catawba ounty Schools, thisoffi
Co^_.k_inos j c
P . E . ; Engineer -ce-
was rPcluPstPd to evaluate wastewater flow data from various
Catawba County Schools to determine whether the data nnuld he
used to s nrt the Division allowing the school system to
connect the wastewater from the proposed West r_atawba Middle
School into t e_ existing WWTP serving t e subject school During
n'•_.r review of the data submitted by Mr. rockinos, it was noted
that the anticipated peak flows from hoth the subject school and
the proposed school would exceed the subject school's hydraulin
design napacity. Furthermoore, there was nn mention of the number
of faculty/staff, which would further expand the total
anticipated wastewater flow. In this Office's response to Mr,
rocki ns's re. ! est ted love her 0 993 see tt, nhed nnpy),
_ _ n q�_ da4 _ r._ _m_ 1•_, 1.__ (_ _ a•- a•_.-•-•-• •-__j,
we' indicated that we Gould not support a prnpncal to introduce
the wastewater from t e prnpnAPli school into the existing Fred T
F o a r d WW T P
Tn a subsequent discussion with Mr; f!nckinnc it was learner
that the school system would like an "official" review and reply
( v..es or nn answer) to this proposal. Since the school system
has provided nn additional data to support their originalf
request- it is the recommendation of the Office that the request
for an ATC he denied.
27‘eer111[;/-//,at_
Signature of __port Preparer Date
e
2!) //
Water Quality egional Supervisor
Date
DIVISION OF ENVIRONMENTAL MANAGEMENT
February 11, 1994
;;EMn Tn
FROM:
PREPARED BY: Michael Parker
SUBJECT:
Charles Alvarez
D. Rex Gleascrip
(111- Da6
Staff Report Addendum
Fred T. Foard High School
High
AC0029297
Catawba County
nn January 28, 1994, this Office submitted a SR concerning
the connection of wastewater from a proposed West Catawba Middle
School into the subject school's existing WWTP. As a result of
our review, we could not support the proposed connection based on
projected flow figures providerd by the (:atawba County School
System's engineer. rnnsequently, a rernmmendation for denial of
the ATC was forwarded to the central Office.
subsequently,.. new information has been provided to this
Office that, if acc rate, would sup ort the proposed onnnec_tiOn.
T+t has been learnerilearned that t_he sand be_rl at Fred T.
Foard has sufficient surface area (two (2) separate filter beds)
to accommodate the wastewater flow from both srhnnls paced o'1 a
loading of 1.5 g l/ft`. At the present time, the existing WWT
system i s Alternating between the two, beds and achieving
excellent treatment (single digit BnDS and NHS as N results are
ro tine T e School Sys emhas prnpo e cons ruc n septic
_•:at _ h _ _ .t•_. i-+._j _ •._d _ t tin, a
tank followed by a pump tank that would then utilize one of the
two filter hedsr the existing recirculation tank, the
disinfection facilities and the existing nutfal l . Based on the
form tinn p nor; e,it is nu deci$ n to rescind our original
in a _ r-_ �_d d, _ r __ i n_ _
recommendation an_d to now recommend that the request for the ATC
he approved, pending a technical review by P&E. The review should
ascertain whether the two filter beds do indeed have sufficient
surface area to allow for the connection of the proposed school
without cnmpromising existing treatment efficiency.
If you have any questions, please advise.
MT:P