Loading...
HomeMy WebLinkAboutWQ0044071_Application (FTSE)_20230111Received 1-11-2023 State of North Carolina Department of Environmental Quality DWR Division of Water Resources FAST TRACK SEWER SYSTEM EXTENSION APPLICATION Division of Water ResoUTCes FTA 06-21 & SUPPORTING DOCUMENTATION Application Number: WQ0044071 (to be completed by DWR) All items must be comuleted, or the awlication will be returned I. APPLICANT INFORMATION: 1. Applicant's name: Rockingham County (company, municipality, HOA, utility, etc.) 2. Applicant type: ❑ Individual ❑ Corporation ❑ General Partnership ❑ Privately -Owned Public Utility ❑ Federal ® State/County ❑ Municipal ❑ Other 3. Signature authority's name: Ronald Tate per 15A NCAC 02T .0106(b) Title: Director of Department of Engineering & Utilities 4. Applicant's mailing address: 371 NC Highway 65 City: Reidsville State: NC Zip: 27320 5. Applicant's contact information: Phone number: (336) 342-8104 Email Address: rtate&co.rockingham.nc.us II. PROJECT INFORMATION: 1. Project name: Wastewater Capacity Improvements 2. Application/Project status: ® Proposed (New Permit) ❑ Existing Permit/Project If a modification, provide the existing permit number: WQ00 and issued date: , For modifications, also attach a detailed narrative description as described in Item G of the checklist. If new construction, but part of a master plan, provide the existing permit number: WQ00 3. County where project is located: Rockingham County, NC 4. Approximate Coordinates (Decimal Degrees): Latitude: 0Longitude: - 5. Parcel ID (if applicable): (or Parcel ID to closest downstream sewer) III. CONSULTANT INFORMATION: 1. Professional Engineer: Bill Lester, Jr. P.E.. Firm: LKC En , ing eering PLLC License Number: 17651 Mailing address: 140 Aqua Shed Court City: Aberdeen State: NC Zip: 28315 Phone number: (910) 420-1437 Email Address: billglkcen ing eering com IV. WASTEWATER TREATMENT FACILITY (WWTF) INFORMATION: 1. Facility Name: Mayodan WWTP Permit Number: NCO021873 Owner Name: Town of Mayodan, NC V. RECEIVING DOWNSTREAM SEWER INFORMATION: 1. Permit Number(s): WQ 2. Downstream (Receiving) Sewer Information: inch ❑ Gravity 3. System Wide Collection System Permit Number(s) (if applicable): WQCS00364 Owner Name(s): Rockingham County ❑ Force Main FORM: FTA 06-21 Page 1 of 5 VI. GENERAL REQUIREMENTS 1. If the Applicant is a Privately -Owned Public Utility, has a Certificate of Public Convenience and Necessity been attached? ❑ Yes ❑ No ® N/A 2. If the Applicant is a Developer of lots to be sold, has a Developer's Operational Agreement (FORM: DEV) been attached? ❑ Yes ❑ No ® N/A 3. If the Applicant is a Home/Property Owners' Association, has an HOA/POA Operational Agreement (FORM: HOA) and supplementary documentation as required by 15A NCAC 02T.0115(c) been attached? ❑ Yes ❑ No ® N/A 4. Origin of wastewater: (check all that apply): ❑ Residential (Individually Owned) ❑ Retail (stores, centers, malls) ❑ Car Wash ❑ Residential (Leased) ❑ Retail with food preparation/service ❑ Hotel and/or Motels ❑ School / preschool / day care ❑ Medical / dental / veterinary facilities ❑ Swimming Pool/Clubhouse ❑ Food and drink facilities ❑ Church ❑ Swimming Pool/Filter Backwash ❑ Businesses / offices / factories ❑ Nursing Home ❑ Other (Explain in Attachment) 5. Nature of wastewater : 0 % Domestic 0 % Commercial 0 % Industrial (See 15A NCAC 02T .0103(20)) If Industrial, is there a Pretreatment Program in effect? ❑ Yes ❑ No 6. Hasa flow reduction been approved under 15A NCAC 02T .0114(f )? []Yes ❑ No ➢ If Yes, provide a cony of flow reduction approval letter with this application 7. Summarize wastewater generated by project: Establishment Type (see 02T.0114(f)) Daily Design Flow a,b No. of Units Flow gal/ GPD gal/ GPD gal/ GPD gal/ GPD gal/ GPD gal/ GPD Total GPD a See 15A NCAC 02T .0114(b), (d), (e)(1) and (e)(2) for caveats to wastewater design flow rates (i.e., minimum flow per dwelling; proposed unknown non-residential development uses; public access facilities located near high public use areas; and residential property located south or east of the Atlantic Intracoastal Waterway to be used as vacation rentals as defined in G.S. 42A-4). b Per 15A NCAC 02T .0114(c), design flow rates for establishments not identified [in table 15A NCAC 02T.01141 shall be determined using available flow data, water using fixtures, occupancy or operation patterns, and other measured data. 8. Wastewater generated by project: _ GPD (per 15A NCAC 02T .0114) ➢ Do not include future flows or previously permitted allocations If permitted flow is zero, please indicate why: ® Pump Station/Force Main or Gravity Sewer where flow will be permitted in subsequent permits that connect to this line. Please provide supplementary information indicating the approximate timeframe for permitting upstream sewers with flow. ❑ Flow has already been allocated in Permit Number: Issuance Date: ❑ Rehabilitation or replacement of existing sewers with no new flow expected ❑ Other (Explain): FORM: FTA 06-21 Page 2 of 5 VII. GRAVITY SEWER DESIGN CRITERIA (If Applicable) - 02T .0305 & MDC (Gravity Sewers): 1. Summarize gravity sewer to be permitted: Size (inches) Length (feet) Material 15-inch 4121.f. PVC ➢ Section II & III of the MDC for Permitting of Gravity Sewers contains information related to design criteria ➢ Section III contains information related to minimum slopes for gravity sewer(s) ➢ Oversizing lines to meet minimum slope requirements is not allowed and a violation of the MDC VIII. PUMP STATION DESIGN CRITERIA (If Applicable) — 02T .0305 & MDC (Pump Stations/Force Mains): PROVIDE A SEPARATE COPY OF THIS PAGE FOR EACH PUMP STATION INCLUDED IN THIS PROJECT 1. Pump station number or name: See attached narrative for pump station design criteria 2. Approximate Coordinates (Decimal Degrees): Latitude: Longitude: - ° 3. Total number of pumps at the pump station: 3. Design flow of the pump station: millions gallons per day (firm capacity) ➢ This should reflect the total GPM for the pump station with the largest pump out of service. 4. Operational point(s) per pump(s): gallons per minute (GPM) at feet total dynamic head (TDH) 5. Summarize the force main to be permitted (for this Pump Station): Size (inches) Length (feet) Material 20-inch 36,0941.f. PVC / DIP 24-inch (O.D.) 1,3871.f. HDPE If any portion of the force main is less than 4-inches in diameter, please identify the method of solids reduction per MDCPSFM Section 2.01C.l.b. ❑ Grinder Pump ❑ Mechanical Bar Screen ❑ Other (please specify) 6. Power reliability in accordance with 15A NCAC 02T .0305(h)(1): ® Standby power source or ❑ Standby pump ➢ Must have automatic activation and telemetry - 15A NCAC 02T.0305(h)(1)(B): ➢ Required for all pump stations with an average daily flow greater than or equal to 15,000 gallons per day ➢ Must be permanent to facility and may not be portable Or if the pump station has an average daily flow less than 15,000 gallons per day 15A NCACO2T.0305(h)(1)(C): ❑ Portable power source with manual activation, quick -connection receptacle and telemetry - or ❑ Portable pumping unit with plugged emergency pump connection and telemetry: ➢ Include documentation that the portable source is owned or contracted by the applicant and is compatible with the station. ➢ If the portable power source or pump is dedicated to multiple pump stations, an evaluation of all the pump stations' storage capacities and the rotation schedule of the portable power source or pump, including travel timeframes, shall be provided as part of this permit application in the case of a multiple station power outage. FORM: FTA 06-21 Page 3 of 5 Ix. SETBACKS & SEPARATIONS — (02B .0200 & 15A NCAC 02T .0305(f)): 1. Does the project comply with all separations/alternatives found in 15A NCAC 02T .0305(D & g)? ® Yes ❑ No 15A NCAC 02T.0305 contains minimum separations that shall be provided for sewers stems: Setback Parameter* Separation Required Storm sewers and other utilities not listed below (vertical) 18 inches 2Water mains (vertical - water over sewer preferred, including in benched trenches) 18 inches 2Water mains (horizontal) 10 feet Reclaimed water lines (vertical - reclaimed over sewer) 18 inches Reclaimed water lines (horizontal - reclaimed over sewer) 2 feet **Any private or public water supply source, including any wells, WS-I waters of Class I or Class II impounded reservoirs used as a source of drinking water, and associated wetlands. 100 feet **Waters classified WS (except WS-I or WS-V), B, SA, ORW, HQW, or SB from normal high water (or tide elevation) and wetlands associated with these waters (see item IX.2) 50 feet **Any other stream, lake, impoundment, or ground water lowering and surface drainage ditches, as well as wetlands associated with these waters or classified as WL. 10 feet Any building foundation (horizontal) 5 feet Any basement (horizontal) 10 feet Top slope of embankment or cuts of 2 feet or more vertical height 10 feet Drainage systems and interceptor drains 5 feet Any swimming pools 10 feet Final earth grade (vertical) 36 inches ➢ If noncompliance with 02T.0305(fl or (g), see Section X.1 of this application * 15A NCAC 02T.0305(a) contains alternatives where separations in 02T.0305(f) cannot be achieved. Please check "yes" above if these alternatives are used and provide narrative information to explain. **Stream classifications can be identified using the Division's NC Surface Water Classifications webpage 2. Does this project comply with the minimum separation requirements for water mains? ®Yes ❑ No ❑ N/A ➢ If no, please refer to 15A NCAC 18C.0906(f) for documentation requirements and submit a separate document, signed/sealed by an NC licensed PE, verifying the criteria outlined in that Rule. 3. Does the project comply with separation requirements for wetlands? ® Yes ❑ No ❑ N/A ➢ Please provide supplementary information identifying the areas of non-conformance. ➢ See the Division's draft separation requirements for situations where separation cannot be met. ➢ No variance is required if the alternative design criteria specified is utilized in design and construction. 4. Is the project located in a river basin subject to any State buffer rules? ❑ Yes Basin name: ® No If yes, does the project comply with setbacks found in the river basin rules per 15A NCAC 02B .0200? ❑ Yes [—]No ➢ This includes Trout Buffered Streams per 15A NCAC 213.0202 5. Does the project require coverage/authorization under a 404 Nationwide/individual permits ❑ Yes ® No or 401 Water Quality Certifications? ➢ Please provide the permit number/permitting status in the cover letter if coverage/authorization is required. 6. Does project comply with 15A NCAC 02T.0105(c)(6) (additional permits/certifications)? ® Yes [—]No Per 15A NCAC 02T.0105(c)(6), directly related environmental permits or certification applications must be being prepared, have been applied for, or have been obtained. Issuance of this permit is contingent on issuance of dependent permits (erosion and sedimentation control plans, stormwater management plans, etc.). 7. Does this project include any sewer collection lines that are deemed "high -priority?" ® Yes [—]No Per 15A NCAC 02T.0402, "high -priority sewer" means any aerial sewer, sewer contacting surface waters, siphon, or sewers positioned parallel to streambanks that are subject to erosion that undermines or deteriorates the sewer. Siphons and sewers suspended through interference/conflict boxes require a variance approval. ➢ If yes, include an attachment with details for each line, including type (aerial line, size, material, and location). High priority lines shall be inspected by the permittee or its representative at least once every six -months and inspections documented per 15A NCAC 02T.0403(a)(5) or the permittee's individual System -Wide Collection permit. FORM: FTA 06-21 Page 4 of 5 X. CERTIFICATIONS: I. Does the submitted system comply with 15A NCAC 02T, the Minimunn Design Criicrin for the Permitting of Pump Stations and Force Mains (latest version), and the Gravity Scwcr MinimpLn I tcsi v rsinn as applicable? ® Yes ❑ No If no, for projects requiring a single variance, complete and submit the Variance/Alternative Design Request application (VADC 10-14) and supporting documents for review to the Central Office. Approval of the request will be issued concurrent) with the a roval of the nermit, and oroiects reauhine a variance annroval may be subject to lop er review times. For proiects reauirine two or more variances or where the variance is determined by the Division to be a significant portion of the nroiect, the full technical review is required. 2. Professional Engineer's Certification: I, Bill Lester Jr., P.E., attest that this application for Rockingham County Wastewater Capacity Improvements has been reviewed by me and is accurate, complete, and consistent with the information supplied in the plans, specifications, engineering calculations, and all other supporting documentation to the best of my knowledge. I further attest that to the best of my knowledge the proposed design has been prepared in accordance with the applicable regulations, Minimum Design Criteria for Gravity Sewcrs (latest version}, and the Minimum Design Crileria for the Fast -Track Permilligg_gf F'uMX Stations and Force Mains (latest version}. Although other professionals may have developed certain portions of this submittal package, inclusion of these materials under my signature and seal signifies that I have reviewed this material and have judged it to be consistent with the proposed design. NOTE — In accordance with General Statutes 143-215.6A and 143-215.6B, any person who knowingly makes any false statement, representation, or certification in any application package shall be guilty of a Class 2 misdemeanor, which may include a fine not to exceed $10,000, as well as civil penalties up to $25,000 per violation. Misrepresentation of the application information, including failure to disclose any design non-compliance with the applicable Rules and design criteria, may subject the North Carolina -licensed Professional Engineer to referral to the licensing board. (21 NCAC 56.0701) North Carolina Professional Engineer's seal, signature, and date: 3. Applicant's Certification per 15A NCAC 02T .010G(b): 1, Ronald Tate, attest that this application for the Rockingham County Wastewater Capacity Improvements project attest that this application has been reviewed by me and is accurate and complete to the best of my knowledge. i understand that if all required parts of this application are not completed and that if all required supporting documentation and attachments are not included, this application package is subject to being returned as incomplete. I understand that any discharge of wastewater from this non -discharge system to surface waters or the land will result in an immediate enforcement action that may include civil penalties, injunctive relief, and/or criminal prosecution. I will make no claim against the Division of Water Resources should a condition of this permit be violated. I also understand that if all required parts of this application package are not completed and that if all required supporting information and attachments are not included, this application package will be returned to me as incomplete. NOTE — In accordance with General Statutes 143-215.6A and 143-215.6B, any person who knowingly makes any false statement, representation, or certification in any application package shall be guilty of a Class 2 misdemeanor, which may include a fine not to exceed $10,000 as well as civil penalties up to $25,000 per violation. ++ r r Signature: l Now, !� Date; � � � C 2� FORM: FTA 06-21 Page 5 of 5 State of North Carolina D.rW-R W 4zwo� Division of Water Resources Department of Environmental Quality Division of Water Resources Flow Tracking for Sewer Extension Applications (FTSE 10-18) Entity Requesting Allocation: Rockingham County Project Name for which flow is being requested: Wastewater Capacity Upgrade More than one FTSE may be required for a single project if the owner of the WWTP is not responsible for all pump stations along the route of the proposed wastewater flow. I. Complete this section only if you are the owner of the wastewater treatment plant. a. WWTP Facility Name: b. WWTP Facility Permit # Town of Mayodan WWTP : NC0021873 c. WWTP facility's permitted flow d. Estimated obligated flow not yet tributary to the WWTP e. WWTP facility's actual avg. flow f. Total flow for this specific request g. Total actual and obligated flows to the facility h. Percent of permitted flow used All flows are in MGD 4.5000 1.1577 0.9866 0.0000 2.1442 47.65% II. Complete this section for each pump station you are responsible for along the route of this proposed wastewater flow. List pump stations located between the project connection point and the WWTP: (A) (B) Design Pump Pump Average Approx. Station Station Firm Daily Flow** Current (Name or Permit Capacity, * (Firm / pf), Avg. Daily Number) No. MGD MGD Flow, MGD N/A (C) (D)=(B+C) (E)=(A-D) Obligated, Not Yet Total Current Tributary Flow Plus Daily Flow, Obligated Available MGD Flow Capacity*** * The Firm Capacity (design flow) of any pump station is defined as the maximum pumped flow that can be achieved with the largest pump taken out of service. ** Design Average Daily Flow is the firm capacity of the pump station divided by a peaking factor (pf) not less than 2.5, per Section 2.02(A)(4)(c) of the Minimum Design Criteria. *** A Planning Assessment Addendum shall be attached for each pump station located between the project connection point and the WWTP where the Available Capacity is < 0. Downstream Facility Name (Sewer): Town of Mayodan Downstream Permit Number: N/A Page 1 of 6 FTSE 10-18 III. Certification Statement: I Kathleen Patterson Town Manger certify to the best of my knowledge that the addition of the volume of wastewater to be permitted in this project has been evaluated along the route to the receiving wastewater treatment facility and that the flow from this project is not anticipated to cause any capacity related sanitary sewer overflows or overburden any downstream pump station en route to the receiving treatment plant under normal circumstances, given the implementation of the planned improvements identified in the planning assessment where applicable. This analysis has been performed in accordance with local established policies and procedures using the best available data. This certification applies to those items listed above in Sections I and II plus all attached planning assessment addendums for which I am the responsible party. Signature of this form certifies that the receiving collection system or treatment works has adequate capacity to transport and treat the proposed new wastewater. of Signing Official Page 2 of 6 FTS E 1 a-18 D.rW-R W 4zwo� Division of Water Resources State of North Carolina Department of Environmental Quality Division of Water Resources Flow Tracking for Sewer Extension Applications (FTSE 10-18) Entity Requesting Allocation: Rockingham County Project Name for which flow is being requested: Wastewater Capacity Upgrade More than one FTSE may be required for a single project if the owner of the WWTP is not responsible for all pump stations along the route of the proposed wastewater flow. I. Complete this section only if you are the owner of the wastewater treatment plant. a. WWTP Facility Name: Town of Mayo b. WWTP Facility Permit #: NC0021873 1. = c. WWTP facility's permitted flow d. Estimated obligated flow not yet tributary to the WWTP e. WWTP facility's actual avg. flow f. Total flow for this specific request g. Total actual and obligated flows to the facility h. Percent of permitted flow used All flows are in MGD 4.5000 1.1577 0.9866 0.0000 2.1442 47.65% II. Complete this section for each pump station you are responsible for along the route of this proposed wastewater flow. List pump stations located between the project connection point and the WWTP: (A) (B) (C) (D)=(B+C) (E)=(A-D) Design Obligated, Pump Pump Average Approx. Not Yet Total Current Station Station Firm Daily Flow** Current Tributary Flow Plus (Name or Permit Capacity, * (Firm / pf), Avg. Daily Daily Flow, Obligated Available Number) No. MGD MGD Flow, MGD MGD Flow Capacity*** Red Birch 4.680 1.872 0.002 0.138 0.140 1.732 Gold Hill 4.752 1.901 0.007 0.138 0.145 1.756 Hogan's Creek 5.040 2.016 0.010 0.138 0.148 1.868 * The Firm Capacity (design flow) of any pump station is defined as the maximum pumped flow that can be achieved with the largest pump taken out of service. ** Design Average Daily Flow is the firm capacity of the pump station divided by a peaking factor (pf) not less than 2.5, per Section 2.02(A)(4)(c) of the Minimum Design Criteria. *** A Planning Assessment Addendum shall be attached for each pump station located between the project connection point and the WWTP where the Available Capacity is < 0. Downstream Facility Name (Sewer): Town of Mayodan Downstream Permit Number: WQCS00078 Page 1 of 6 FTSE 10-18 III. Certification Statement: I Ronald Tate, Dir. of Engr. & PU certify to the best of my knowledge that the addition of the volume of wastewater to be permitted in this project has been evaluated along the route to the receiving wastewater treatment facility and that the flow from this project is not anticipated to cause any capacity related sanitary sewer overflows or overburden any downstream pump station en route to the receiving treatment plant under normal circumstances, given the implementation of the planned improvements identified in the planning assessment where applicable. This analysis has been performed in accordance with local established policies and procedures using the best available data. This certification applies to those items listed above in Sections I and I1 plus all attached planning assessment addendums for which I am the responsible party. Signature of this form certifies that the receiving collection system or treatment works has adequate capacity to transport and treat the proposed new wastewater. Signing Official Signature Director of Engineering & Public utilities Title of Signing Official Date Page 2 of 6 FTSE 10-18 WASTEWATER CAPACITY IMPROVEMENTS ROCKINGHAM COUNTY, NC NCDEQ SEWER EXTENSION PERMIT NARRATIVE This proposed project includes the replacement and upgrade of three wastewater pump stations and forcemain in the Rockingham County US220 Sewer System (Permit No. WQCS00364). Rockingham County is currently seeing a large amount of growth within the US220 corridor, and as such, this proposed project is intended to upgrade capacity of this collection system to handle the additional wastewater flows associated with this growth. The existing collection system runs along US220 to the southwestern part of the County. Flow is pumped through series -linked pump stations north, to the Town of Madison's collection system where it is eventually pumped to the Town of Mayodan Wastewater Treatment Plant for treatment. This proposed project will reroute the Hogan's Creek forcemain to bypass the Madison collection system, and pump directly into the headworks at the Mayodan Wastewater Treatment Plant. Rockingham County recently received an approved flow reduction that applies to all permitted but not yet tributary residential connections, and all future residential connections of 75 gallons per day per bedroom (minimum flow of 150 gallons per day per dwelling). The County currently has approximately 10,000 GPD of flow through the US220 collection system and 138,200 gpd of approved flow that is not yet discharging to the system. The following table shows the projected developments for the US220 corridor. These are divided into three types: developments that have been permitted; developments that are currently in conceptual stage but not yet permitted; and the projected future projects that are expected in the next several years. The flow allocation for the permitted residential projects have been revised to reflect the flow reduction that the County has been approved for. Please note that the County is not currently requesting any flow allocation for these developments. The developers for these lots will be expected to permit each development individually and submit a flow request to Rockingham County and the Town of Mayodan. Table 1: Existing and Projected Flows for Rockingham County US220 Wastewater Collection System Project Status No. Of Units Daily Design Flow Average Daily Flow (GPD) Current Flow: 10,000 South Rockingham Corporate Park Permit Approved 18,000 Levington Permit Approved 80 3-BR, 79 4-BR 75 gal/BR 41,700 Colleybrooke Permit Approved 179 4-BR 75 gal/BR 53,700 Neal Farm Permit Approved 69 4-BR 75 gal/BR 20,700 210k Spec Building Permit Submitted 41 loading bays 100 gal/loading bay 4,100 Bennett Farms East Conceptual Stage 1,000 4-BR 75 gal/BR 300,000 Bennett Farms West Conceptual Stage 700 4-BR 75 gal/BR 210,000 Newnam Road North Conceptual Stage 180 4-BR 75 gal/BR 54,000 Simpson Road Conceptual Stage 204 4-BR 75 gal/BR 61,200 Misc. Property - Huntsville Area Potential Future Project 750 4-BR 75 gal/BR 225,000 Friddle Road Property Potential Future Project 200 4-BR 75 gal/BR 60,000 Reserved for Economic Development Potential Future Project - - 150,000 Reserved for Commercial Development Potential Future Project - - 120,000 TOTAL ANTICIPATED FLOW: 1,328,400 The proposed project will include the upgrade / replacement of three of the County's wastewater pump stations and forcemains that convey wastewater through the US220 collection system. The following gives a detailed description of each pump station to be upgraded. Red Birch Pump Station: The Red Birch Pump Station is located at 2025 US220 in the southwestern part of Rockingham County (36.303056°,-79.940278°). This pump station has a current capacity of 300 gpm; wastewater is pumped through an existing 6-inch forcemain that discharges to a gravity sewer outfall that flows to the Gold Hill Pump Station. This proposed project will include a complete replacement of the existing Red Birch Pump Station on a site adjacent to the existing station. This will include the construction of a new triplex pump station with a new 20'x12' rectangular wet well, a new emergency standby generator, flow meter, bypass pump connection, new 15-inch gravity sewer to direct flow to the new wet well, and electrical and SCADA upgrades. This will also include the construction of approximately 6,824 I.f. of 20-inch forcemain, beside the existing forcemain, that will bypass the existing gravity sewer outfall and discharge at a new manhole at the Gold Hill Pump Station. The proposed pumps will have a design condition of 3,250 gpm at 115.0' TDH. Variable Frequency Drives (VFDs) will be installed at this pump station to allow the County to control the speed and pumping rate of the pumps to meet demand. It is expected that these pumps will initially be operated at between 2,000 and 2,500 gpm to account for the flow estimated for the new developments listed in Table 1 above. The pumps have been sized for a larger capacity than what is initially expected. It is expected that development will continue to occur in this US220 corridor beyond what is currently being planned for. The installation of larger pumps and VFDs now will allow the Town the additional capacity and ability to speed these pumps up as development continues to allow them to serve any additional developments in this corridor. The County and the Town of Mayodan currently have a draft copy of a contract to allow for all of the County's wastewater to be pumped directly to the Mayodan Wastewater Treatment Plant. All new developments will need to be approved by Mayodan during the permit stage before additional capacity will be allocated. The County will operate these pumps at a speed / flow rate necessary to keep up with demand as these new developments are permitted and brought online. Gold Hill Pump Station: The Gold Hill Pump Station is located at 124 Old 220 Loop in the southwestern part of Rockingham County (36.321389°,-79.944444°). This pump station has a current capacity of 500 gpm; wastewater is pumped through an existing 8-inch forcemain that discharges to a gravity sewer outfall that flows to the Hogan's Creek Pump Station. This proposed project will include a complete replacement of the existing Gold Hill Pump Station on a site adjacent to the existing station. This will include the construction of a new triplex pump station with a new 20'x12' rectangular wet well, a new emergency standby generator, flow meter, bypass pump connection, new 15-inch gravity sewer to direct flow to the new wet well, and electrical and SCADA upgrades. This will also include the construction of approximately 15,289 Lf. of 20-inch forcemain, beside the existing forcemain, that will bypass the existing gravity sewer outfall and discharge at a new manhole at the Hogan's Creek Pump Station. The proposed pumps will have a design condition of 3,300 gpm at 96.0' TDH. As with the Red Birch Pump Station, VFDs will be installed at this pump station to allow the County to control the flow rate leaving this pump station. Hogan's Creek Pump Station: The Hogan's Creek Pump Station is located at 4246 US220 in the western part of Rockingham County (36.3625°,-79.945278°). This pump station has a current capacity of 800 gpm; wastewater is pumped through an existing 8-inch forcemain that discharges to the Town of Madison collection system, where it is ultimately pumped to the Town of Mayodan for treatment. This proposed project will include a complete replacement of the existing Hogan's Creek Pump Station on a site adjacent to the existing station. This will include the construction of a new triplex pump station with a new 20'x12' rectangular wet well, a new emergency standby generator, flow meter, bypass pump connection, new 15-inch gravity sewer to direct flow to the new wet well, and electrical and SCADA upgrades. This will also include the construction of approximately 15,368 Lf. of 20-inch forcemain; this new forcemain will bypass the Town of Madison collection system and discharge directly into the headworks at the Town of Mayodan Wastewater Treatment Plant. The proposed pumps will have a design condition of 3,500 gpm at 172.0' TDH. As with the Red Birch and Gold Hill Pump Stations, VFDs will be installed at this pump station to allow the County to control the flow rate leaving this pump station. The existing pump stations will be left in service during construction of the proposed project. The existing pump stations will remain in service until permitted flow reaches their existing capacity, at which point the new pump stations will be brought online. At this point, the existing pump stations will be taken offline and demolished. Summary: The County currently discharges all of their wastewater on the US220 collection system to the Town of Madison. This proposed project will completely bypass the Town of Madison and will discharge directly into the Town of Mayodan Wastewater Treatment Plant. Rockingham County and the Town of Mayodan have been in discussions for several months now to develop a contract for flow allocation. A draft contract has been developed and the County and Town are currently working with their attorneys to finalize the details of the contract. This final draft is expected to be completed in early 2023, at which the Town and County will take it before their boards for final approval and signatures. Attachments: Flow Reduction Approval Letter from NCDEQ dated June 22, 2022 Pump Station Design Calculations High Priority Line Summary Project Layout Map USGS Map FLOW REDUCTION APPROVAL LETTER FROM NC DEQ DATED JUNE 221f 2022 DocuSign Envelope ID: 713DEAF1-93D5-48B9-8CC0-6F1638FF102D ROY COOPER Governor ELIZABETH S. BISER Secretary RICHARD E. ROGERS, JR. Director NORTH CAROLINA Environmental Quality June 22, 2022 Mr. Ronnie Tate, Director Department of Engineering and Public Utilities Rockingham County 371 NC Hwy 65 Reidsville, NC 27320 Subject: Residential Flow Reduction Approval Rockingham County Collection System (WQCS00364) Rockingham County Dear Mr. Tate: On April 13, 2022, the Division of Water Resources (Division) received a request for an adjusted daily sewage flow rate (flow reduction) that would apply to all permitted but not yet tributary residential connections and all future residential connections within the Rockingham County service area. Additional information was requested by the Division and was received on April 13, 2022 and June 1, 2022. In accordance with 15A NCAC 02T .0114(f)(2), the Division has evaluated the request, and based on the data submitted, the Division hereby approves for use by Rockingham County an adjusted daily sewage design flow rate with the following conditions: • The flow reduction is applicable to residential single-family dwellings only. • The minimum flow for 1- and 2- bedroom dwellings shall be 150 gallons per day. • Each additional bedroom above two bedrooms shall increase the volume by 75 gallons per day per bedroom. • This flow reduction shall not apply to sewer extension applications and/or permits for any other public or private organizations whose wastewater flows are or might become tributary to the Rockingham County collection system (WQCS00364). Future sewer extension applications should be made using the flow reduction amount stated above. All other aspects of the permitting process remain unchanged, and all applications must be in compliance with the statutes, rules, regulations and minimum design criteria as certified by the owner and engineer. North Carolina Department of Environmental Quality I Division of Water Resources 512 North Salisbury Street 1 1611 Mail Service Center I Raleigh, North Carolina 27699-1611 NORTH CARCLINA 919.707.9000 DocuSign Envelope ID: 713DEAF1-93D5-48B9-8CC0-6F1638FF102D Regardless of the adjusted design daily wastewater flow rate, at no time shall the wastewater flows exceed the effluent limits defined in the permit for the treatment facility or exceed the capacity of the sewers downstream of any new sewer extension or service connection(s). In accordance with 15A NCAC 02T .0114(f), the Division periodically requires reassessment of wastewater flow data associated with the collection system or the receiving wastewater treatment plant as applicable to confirm the suitability of the approved flow reduction value. Rockingham County shall submit documented, representative data in accordance with 15A NCAC 02T .0114(f)(1)(A-H) prior to the expiration date of collection systempermit no. WOCS000364 on October 31, 2032. Failure to submit the required data by this date will result in this flow reduction approval letter becoming null and void. Upon review of the data, the Division shall either regpprove, modify or not grant reapproval for the previously approved flow reduction value. The granting of this flow reduction does not prohibit the Division from reopening, revoking, reissuing and/or modifying the flow reduction as allowed by the laws, rules, and regulations contained in 15A NCAC 02T, NCGS 143-215.1, or as needed to address changes in State and/or Federal regulations with respect to wastewater collection systems, protection of surface waters, and/or wastewater treatment. If you have any questions, please contact Charlie Miller, P.E. at (919) 707-3627 or by email at Charlie.Miller(a ncdenr.gov. Sincerely, DocuSigned by: �bIN�,AS �bW�.t,ln. 57287ES6E81A40D... for Richard E. Rogers, Jr. Director, Division of Water Resources by Douglas Dowden Industrial Permitting Unit, Division of Water Resources, DEQ CC: Bill Lester, Jr., P.E., LKC Engineering, PLLC (bill(a�jkcen ing eering com) Kathleen Patterson, Town of Mayodan (kpatterson&mayodannc.org) Winston-Salem Regional Office, Water Quality Regional Operations Municipal Permitting Unit (electronic copy) REQ5 North Carolina Department ofEnvironmental Quality I Division ofWater Resources 512 North Salisbury Street 1 1611 Mail Service Center I Raleigh, North Carolina 27699-1611 NORTH CAROLINA 919.707.9000 onparhnem of EmironmanW 9uallly PUMP STATION DESIGN CALCULATIONS HOGAN'S CREEK PUMP STATION DESIGN CALCULATIONS HOGAN'S CREEK DUPLEX SUBMERSIBLE PUMP STATION DESIGN ROCKINGHAM COUNTY Project: Rockingham County Sewer Capacity Upgrade - Hogan's Creek PS Date: December-22 Pump Station Design: A. Wastewater Flows 1. Average Daily Wastewater Flows to PS Total Pump Station Design Flow = 2,016,000 GPD Peaking Factor for PS Flows = 2.50 Peak Domestic Flow = 2,016,000 gpd x 2.50 (Peak) 5,040,000 gpd / 1440 min./day = 5,040,000 GPD = 3,500 GPM A `�AR'��-I Z. Design Flow = Q Peak = 3,500 gpm 'Q ' 2. Target Pumping Rate Use 3,500 gpm for End Service Target Pumping Rate SEAL - 00975 B. Pump Station / Force Main Design Criterion 1. Piping i i a. Station Piping �. 12 "DIP H-W Friction Coefficients: C= 120 (Begin Service) C= 110 (End of Service) 16 "DIP H-W Friction Coefficients: C= 120 (Begin Service) C= 110 (End of Service) b. Force Main Piping 20 " PVC H-W Friction Coefficients: C= 140 (Begin Service) C= 130 (End of Service) 20 " DIP H-W Friction Coefficients: C= 120 (Begin Service) C= 110 (End of Service) c. Total Force Main Length 20 "D.I. 1,825 If 20 " PVC 13,575 If 15,400 If d. Force Main Detention Volume 251,311 Gallons e. Velocity and Headloss @ Actual Pumping Rate 3,500 gpm 20" PVC Force Main Velocity in Force Main at Target Pumping Rate 3.58 fps (End Service) Headloss in FM per 1,000 ft. (C=140) 1.88 ft. (Begin Service PVC) Headloss in FM per 1,000 ft. (C=120) 2.50 ft. (End Service PVC) 2. Static Head: Force Main Discharge Elev. 740.00 ft. Pump Off Elev. 641.25 ft. Total Static Lift 98.75 ft. 3. Schedule of Piping: b. Pump Station Piping (Discharge, all DIP) 12" Pump Station Discharge Piping (DIP) Fitting / Valve Description # Equivalent Length per Fitting / Valve Total Equivalent Length (ft.) 90 Degree Bends 2 30.00 60.00 Reducer 2 12.00 24.00 Straight Pipe - - 30.00 Total Equivalent Length 114.00 16" Pump Station Discharge Piping (DIP) Fitting / Valve Description # Equivalent Length per Fitting / Valve Total Equivalent Length (ft.) Check Valve 1 1 1 1 2 - 125.00 10.00 75.00 38.00 16.00 - 125.00 10.00 75.00 38.00 32.00 10.00 Gate Valve Branch Flow of Tee 90 Degree Bends Reducer Straight Pipe Total Equivalent Length 290.00 b. Force Main Piping: 20" PVC Piping Fitting / Valve Description # Equivalent Length per Fitting / Valve ea.) Total Equivalent Length (ft.) Straight Pipe 13,575 Total Equivalent Length 13,575 20" D.I. Piping and Equivalent Length of Fittings Equivalent Length per Total Equivalent Fitting / Valve Description # Fitting / Valve Length (ft. / ea.) (ft.) 90 Degree Bend 6 47.00 282.00 45 Degree Bend 6 25.00 150.00 22.5 Degree Bend 12 20.00 240.00 11.25 Degree Bend 14 20.00 280.00 Gate Valve 7 13.00 91.00 Straight Pipe - - 1,825 Total Equivalent Length 2,868 4. Projected System Curves: Hazen -Williams Formula ONE PUMP RUNNING y Friction Headloss y^ (J m = y w y O C_ O V C_ U N 2 N C N u O C N jp O L r 2 y = y LL U V) O. Q y U y (n 0) O. a) in E w 3 o w LL E -0 y o -0 LL y v > H w F- IL a . pm 0 98.75 0.00 0.00 0.00 0.00 0.00 98.75 98.75 500 98.75 0.15 0.89 0.18 1.03 0.00 99.80 99.96 1000 98.75 0.55 3.22 0.65 3.72 0.02 102.54 103.13 1500 98.75 1.16 6.83 1.37 7.87 0.04 106.78 108.02 2000 98.75 1.98 11.63 2.33 13.40 0.06 112.42 114.55 2500 98.75 2.99 17.57 3.52 20.25 0.10 119.41 122.62 2800 98.75 3.69 21.66 4.34 24.98 0.13 124.23 128.19 3000 98.75 4.19 24.61 4.93 28.38 0.15 127.70 132.20 3500 98.75 5.58 32.74 6.55 37.74 0.20 137.26 143.24 4000 98.75 7.14 41.91 8.39 48.32 0.26 148.06 155.72 4500 98.75 8.88 52.11 10.43 60.09 0.33 160.07 169.59 TWO PUMPS IN PARALLEL m Friction Headloss y^ a m = d 2 d L o c o c 3 a m e 0 = w = m V c°' ._i cO U d d U O LL O. n y E" w 4 y `o ` a O. E° a o m O 01 0) O C y N 7 LL 7 y LL y > a a pm (ft.) ft. (ft.) 0 98.75 0.00 0.00 0.00 0.00 0.00 98.75 98.75 500 98.75 0.04 0.89 0.05 1.03 0.00 99.69 99.84 1000 98.75 0.15 3.22 0.18 3.72 0.02 102.14 102.66 1500 98.75 0.32 6.83 0.38 7.87 0.04 105.94 107.04 2000 98.75 0.55 11.63 0.65 13.40 0.06 110.99 112.86 2500 98.75 0.83 17.57 0.98 20.25 0.10 117.25 120.08 2800 98.75 1.02 21.66 1.20 24.98 0.13 121.56 125.06 3000 98.75 1.16 24.61 1.37 28.38 0.15 124.67 128.64 3500 98.75 1.55 32.74 1.82 37.74 0.20 133.23 138.51 4000 98.75 1.98 41.91 2.33 48.32 0.26 142.90 149.66 4500 98.75 2.46 52.11 2.89 60.09 0.33 153.65 162.06 5000 98.75 2.99 63.33 3.52 73.02 0.40 165.47 175.69 5500 98.75 3.57 75.54 4.19 87.10 0.49 178.35 190.53 6000 98.75 4.19 88.73 4.93 102.31 0.58 192.26 206.57 Note: Combined flow split evenly between 2 identical pumps in parallel. C. Pump Selection 1. Duplex Non -Clog Submersible Sewage Pumps a. Selected Pump KRT K 200-402/1554XNG-S b. Pump Discharge 8 inches c. Motor Horsepower 208.0 HP d. Motor Speed 1,782 RPM e. Electrical Service 460 volt f. Impeller Diameter 15.438 inches a Solids 3.56 inches h. Target Q v. Hd.: 3500 gpm @ 162.00 ft. TDH (End Service Conditions) Pump Curve (Q) Flow (gpm)m 2(0) Flow Total Hd. ft. 0 0 260 250 500 255 500 1000 250 750 1500 245 1000 2000 238 1250 2500 230 1500 3000 225 1750 3500 215 2000 4000 210 2250 4500 202 2500 5000 195 2750 5500 190 3000 6000 180 3250 6500 170 3500 7000 162 3750 7500 153 4000 8000 145 4250 8500 130 4500 9000 125 4750 9500 115 5000 10000 105 5250 10500 95 5500 11000 85 2. Estimated Pumping Rate (one pump running) Pump Capacity: 3,950 gpm @ 148 ft. TDH (Begin Service) 3,800 gpm @ 152 ft. TDH (End of Service) 3. Estimated Pumping Rate (two pumps running) Pump Capacity: 5,750 gpm/ea. @ 195 ft. TDH (Begin Service) 5,500 gpm/ea. @ 200 ft. TDH (End of Service) PUMP & SYSTEM CURVES 260 250 240 230 220 210 200 190 180 LL 170 160 = 150 140 130 120 - 110 100 SIN 90 80 70 60 O ��O yOO A NIZ, 00 N13 K^00 `000 `vle `000 `VA 00 '3le '3s '3^00 R000 0 00 000 R^00 000 4 00 4 000 hA00 6P Flow (GPM) mC.- 9,.„a o D. Wet Well Dimensions. Elevations. and Cycle Times Begin Service End of Service 1. Inside Dimensions, Area 200.00 sf 200.00 sf 2. Pump Station Rim Elevation 659.00 ft. MSL 659.00 ft. MSL 3. Invert of Influent Line 647.56 ft. MSL 647.56 ft. MSL 4. High Level Alarm 647.25 ft. MSL 647.25 ft. MSL 5. Lag Pump On 647.00 ft. MSL 647.00 ft. MSL 6. Lead Pump On 646.75 ft. MSL 646.75 ft. MSL 7. Pump Off 641.25 ft. MSL 641.25 ft. MSL 8. Bottom Wet Well 635.00 ft. MSL 635.00 ft. MSL 9. Detention Volume 8,228.00 gal. 8,228.00 gal. 10 Storage (Pump On to top of 2,214 gal. 2,214 gal. Influent Pipe) 11. Force Main High Point 740.00 ft. MSL 740.00 ft. MSL 12. Force Main Discharge Elev. 740.00 ft. MSL 740.00 ft. MSL 13. Cycle Time: Pump On Time = 3.23 min. Pump Off Time = 5.88 min. Pumping Cycle = 9.10 min. 6.59 Cycles per Hour 15. Volume Pumped Each Cycle 12,745 gal. Note: Cycle times based upon Calculated Pumping Rates. E. Wet Well BuoVancV Calculation 1. Wet Well Volume Wet Well Dimensions 10.00 Width 20.00 Length 1.500 thickness 24.00 depth Slab Dimensions (ft) 22.00 Diameter 1.000 thickness 2. Ground Water Elevation 0.67 feet below rim 3. Total Wet Well Weight (Empty) 875,075 Ibs 4. Weight of Soil on Anti -flotation Collar 1,583 Soil Volume (ft) 42.6 Assumed unit weight of submerged backfill (Ib/ft) 67,451 Total Weight (lb) 5. Buoyancy Calculation 7709.5 Volume 62.4 Ibs/ft3 481,071 Total Buoyancy 942,526 Total Wet Well & Soil Weight 1.96 Safety Factor 3.43 min. 5.88 min. 9.31 min. 6.45 Cycles per Hour 13,028 gal. GOLD HILL PUMP STATION DESIGN CALCULATIONS GOLD HILL DUPLEX SUBMERSIBLE PUMP STATION DESIGN ROCKINGHAM COUNTY Project: Rockingham County Sewer Capacity Upgrade - Gold Hill PS Date: December-22 Pump Station Design: A. Wastewater Flows 1. Average Daily Wastewater Flows to PS Total Pump Station Design Flow = 1,900,800 GPD Peaking Factor for PS Flows = 2.50 Peak Domestic Flow = 1,900,800 gpd x 2.50 (Peak) = 4,752,000 GPD 4,752,000 gpd / 1440 min./day = 3,300 GPM Design Flow = Q Peak = 3,300 gpm 01% `CAO 0��, 125 2. Target Pumping Rate Use 3,300 gpm for End Service Target Pumping Rate ? ;'Q• SEAL B. Pump Station / Force Main Design Criterion = OM75 1. Piping A.- Station Piping '•� �` 12 "DIP H-W Friction Coefficients: C= 120 (Begin Service) C= 110 (End of Service) 16 "DIP H-W Friction Coefficients: C= 120 (Begin Service) C= 110 (End of Service) b. Force Main Piping 20 " PVC H-W Friction Coefficients: C= 140 (Begin Service) C= 130 (End of Service) 20 " DIP H-W Friction Coefficients: C= 120 (Begin Service) C= 110 (End of Service) c. Total Force Main Length 20 " D.I. 400 If 20 " PVC 14,900 If 15,300 If d. Force Main Detention Volume 249,679 Gallons e. Velocity and Headloss @ Actual Pumping Rate 3,300 gpm 20" PVC Force Main Velocity in Force Main at Target Pumping Rate 3.37 fps (End Service) Headloss in FM per 1,000 ft. (C=140) 1.69 ft. (Begin Service PVC) Headloss in FM per 1,000 ft. (C=120) 2.25 ft. (End Service PVC) 2. Static Head: Force Main Discharge Elev. 845.86 ft. Pump Off Elev. 789.00 ft. Total Static Lift 56.86 ft. 3. Schedule of Piping: b. Pump Station Piping (Discharge, all DIP) 12" Pump Station Discharge Piping (DIP) Fitting / Valve Description # Equivalent Length per Fitting / Valve Total Equivalent Length (ft.) 90 Degree Bends 2 30.00 60.00 Reducer 2 12.00 - 24.00 30.00 Straight Pipe - Total Equivalent Length 114.00 16" Pump Station Discharge Piping (DIP) Fitting / Valve Description # Equivalent Length per Fitting / Valve Total Equivalent Length (ft.) Check Valve 1 1 1 1 2 - 125.00 125.00 10.00 75.00 38.00 32.00 10.00 Gate Valve 10.00 Branch Flow of Tee 75.00 90 Degree Bends 38.00 16.00 - Reducer Straight Pipe Total Equivalent Length 290.00 b. Force Main Piping: 20" PVC Piping Fitting / Valve Description # Equivalent Length per Fitting / Valve (ft. / ea.) Total Equivalent Length (ft.) Straight Pipe 14,900 Total Equivalent Length 14,900 20" D.I. Piping and Equivalent Length of Fittings Equivalent Length per Total Equivalent Fitting / Valve Description # Fitting / Valve Length (ft. / ea.) (ft.) 90 Degree Bend 2 47.00 94.00 45 Degree Bend 6 25.00 150.00 Gate Valve 1 13.00 13.00 Straight Pipe 400 Total Equivalent Length 657 4. Projected System Curves: Hazen -Williams Formula ONE PUMP RUNNING y Friction Headloss y^ (J m = y d ccN O C_ O V C_ U 2 N C N Fm 2 O C N (_1 jp O L r 2 y = y O LL U -0 O. sz y a, U a y P 0) O. W a)a) U y O cc w E w 3 o w LL E-0 y o-0 LL y v > H w V IL a pm 0 56.86 0.00 0.00 0.00 0.00 0.00 56.86 56.86 500 56.86 0.15 0.81 0.18 0.93 0.00 57.83 57.97 1000 56.86 0.55 2.93 0.65 3.36 0.02 60.35 60.88 1500 56.86 1.16 6.19 1.37 7.11 0.04 64.25 65.38 2000 56.86 1.98 10.54 2.33 12.11 0.06 69.45 71.36 2500 56.86 2.99 15.93 3.52 18.30 0.10 75.89 78.78 2600 56.86 3.22 17.13 3.78 19.68 0.11 77.32 80.43 3000 56.86 4.19 22.33 4.93 25.64 0.15 83.53 87.57 3300 56.86 5.00 26.63 5.88 30.59 0.18 88.67 93.50 3500 56.86 5.58 29.69 6.55 34.10 0.20 92.33 97.71 4000 56.86 7.14 38.01 8.39 43.66 0.26 102.27 109.16 TWO PUMPS IN PARALLEL m Friction Headloss y^ a m = d 2 d L o c o c 3 d m e 0 = w = m O 2 V ci fn ._ cO ._ U d d U O LL O. n y E" w 4 y `o ` a O. E° a o m O 01 0) O C y N 7 LL 7 y LL y > a a pm ft. ft. (ft.) 0 56.86 0.00 0.00 0.00 0.00 0.00 56.86 56.86 500 56.86 0.04 0.81 0.05 0.93 0.00 57.72 57.85 1000 56.86 0.15 2.93 0.18 3.36 0.02 59.95 60.41 1500 56.86 0.32 6.19 0.38 7.11 0.04 63.41 64.39 2000 56.86 0.55 10.54 0.65 12.11 0.06 68.02 69.68 2500 56.86 0.83 15.93 0.98 18.30 0.10 73.73 76.24 2600 56.86 0.89 17.13 1.05 19.68 0.11 75.00 77.70 3000 56.86 1.16 22.33 1.37 25.64 0.15 80.50 84.01 3300 56.86 1.39 26.63 1.63 30.59 0.18 85.05 89.25 4000 56.86 1.98 38.01 2.33 43.66 0.26 97.11 103.10 4500 56.86 2.46 47.27 2.89 54.29 0.33 106.92 114.37 5000 56.86 2.99 57.44 3.52 65.97 0.40 117.70 126.75 5500 56.86 3.57 68.52 4.19 78.69 0.49 129.44 140.24 6000 56.86 4.19 80.49 4.93 92.44 0.58 142.12 154.80 Note: Combined flow split evenly between 2 identical pumps in parallel. C. Pump Selection 1. Duplex Non -Clog Submersible Sewage Pumps a. Selected Pump KRT K 200-403/804XNG-S b. Pump Discharge 8 inches c. Motor Horsepower 107.0 HP d. Motor Speed 1,775 RPM e. Electrical Service 460 volt f. Impeller Diameter 13.188 inches a Solids 3.56 inches h. Target Q v. Hd.: 3300 gpm @ 96.00 ft. TDH (End Service Conditions) 2. Estimated Pumping Rate (one pump running) Pump Capacity: 3,500 gpm @ 94 ft. TDH 3,400 gpm @ 96 ft. TDH 3. Estimated Pumping Rate (two pumps running) Pump Curve (Q) Flow (gpm)m 2(0) Flow Total Hd. ft. 0 0 175 250 500 170 500 1000 165 750 1500 160 1000 2000 155 1250 2500 150 1500 3000 145 1750 3500 140 2000 4000 133 2250 4500 126 2500 5000 120 2750 5500 110 3000 6000 105 3250 6500 100 3500 7000 95 3750 7500 80 4000 8000 73 (Begin Service) (End of Service) Pump Capacity: 5,000 gpm/ea. @ 120 ft. TDH (Begin Service) 4,750 gpm/ea. @ 122 ft. TDH (End of Service) -I a u 170 160 150 140 130 120 110 100 90 80 70 60 50 40 PUMP & SYSTEM CURVES O �O oO 4O oO hO oO yO op oO hO oO hO oO yO oO oO oO hO oO yO oO `L 5 1 ^O ^`L no NA r1O � ; 0 ti^ 50 5`L yh 51 tO �L ph R� �O y'L bq Flow (GPM) IP,m R. s C..-�i.('P a .a) C.M.Ed„a P 9 D. Wet Well Dimensions. Elevations. and Cycle Times Begin Service End of Service 1. Inside Dimensions, Area 240.00 sf 240.00 sf 2. Pump Station Rim Elevation 815.00 ft. MSL 815.00 ft. MSL 3. Invert of Influent Line 798.83 ft. MSL 798.83 ft. MSL 4. High Level Alarm 798.50 ft. MSL 798.50 ft. MSL 5. Lag Pump On 798.25 ft. MSL 798.25 ft. MSL 6. Lead Pump On 798.00 ft. MSL 798.00 ft. MSL 7. Pump Off 794.50 ft. MSL 794.50 ft. MSL 8. Bottom Wet Well 789.00 ft. MSL 789.00 ft. MSL 9. Detention Volume 6,283.20 gal. 6,283.20 gal. 10 Storage (Pump On to top of 2,693 gal. 2,693 gal. Influent Pipe) 11. Force Main High Point 845.86 ft. MSL 845.86 ft. MSL 12. Force Main Discharge Elev. 845.86 ft. MSL 845.86 ft. MSL 13. Cycle Time: Pump On Time = 2.88 min. Pump Off Time = 4.76 min. Pumping Cycle = 7.64 min. 7.85 Cycles per Hour 15. Volume Pumped Each Cycle 10,088 gal. Note: Cycle times based upon Calculated Pumping Rates. E. Wet Well BuoVancV Calculation 1. Wet Well Volume Wet Well Dimensions 12.00 Width 20.00 Length 1.500 thickness 26.00 depth Slab Dimensions (ft) 22.00 Diameter 1.000 thickness 2. Ground Water Elevation 0.67 feet below rim 3. Total Wet Well Weight (Empty) 813,123 Ibs 4. Weight of Soil on Anti -flotation Collar 1,715 Soil Volume (ft) 42.6 Assumed unit weight of submerged backfill (Ib/ft) 73,072 Total Weight (lb) 5. Buoyancy Calculation 8337.8 Volume 62.4 Ibs/ft3 520,278 Total Buoyancy 886,195 Total Wet Well & Soil Weight 1.70 Safety Factor 3.02 min. 4.76 min. 7.78 min. 7.71 Cycles per Hour 10,271 gal. RED BIRCH PUMP STATION DESIGN CALCULATIONS RED BIRCH DUPLEX SUBMERSIBLE PUMP STATION DESIGN ROCKINGHAM COUNTY Project: Rockingham County Sewer Capacity Upgrade - Red Birch PS Date: December-22 Pump Station Design: A. Wastewater Flows 1. Average Daily Wastewater Flows to PS Total Pump Station Design Flow = 1,872,000 GPD Peaking Factor for PS Flows = 2.50 Peak Domestic Flow = 1,872,000 gpd x 2.50 (Peak) = 4,680,000 GPD 4,680,000 gpd / 1440 min./day = 3,250 GPM Design Flow = Q Peak = 3,250 gpm `%0'�, t , �► of ,a;y11 2. Target Pumping Rate .QQ' Use 3,250 gpm for End Service Target Pumping Rate _ SEAL •. 049975 B. Pump Station / Force Main Design Criterion 1. Piping a. Station Piping 12 "DIP H-W Friction Coefficients: C= 120 (Begin Service) C= 110 (End of Service) 16 "DIP H-W Friction Coefficients: C= 120 (Begin Service) C= 110 (End of Service) b. Force Main Piping 20 " PVC H-W Friction Coefficients: C= 140 (Begin Service) C= 130 (End of Service) 20 " DIP H-W Friction Coefficients: C= 120 (Begin Service) C= 110 (End of Service) c. Total Force Main Length 20 " D.I. 250 If 20 " PVC 6,575 If 6,825 If d. Force Main Detention Volume 111,376 Gallons e. Velocity and Headloss @ Actual Pumping Rate 3,250 gpm 20" PVC Force Main Velocity in Force Main at Target Pumping Rate 3.32 fps (End Service) Headloss in FM per 1,000 ft. (C=140) 1.64 ft. (Begin Service PVC) Headloss in FM per 1,000 ft. (C=120) 2.18 ft. (End Service PVC) 2. Static Head: Force Main Discharge Elev. 877.00 ft. Pump Off Elev. 788.30 ft. Total Static Lift 88.70 ft. 3. Schedule of Piping: b. Pump Station Piping (Discharge, all DIP) 12" Pump Station Discharge Piping (DIP) Fitting / Valve Description # Equivalent Length per Fitting / Valve Total Equivalent Length (ft.) 90 Degree Bends 2 30.00 60.00 Reducer 2 12.00 24.00 Straight Pipe - - 30.00 Total Equivalent Length 114.00 16" Pump Station Discharge Piping (DIP) Fitting / Valve Description # Equivalent Length per Fitting / Valve Total Equivalent Length (ft.) Check Valve 1 1 1 1 2 - 125.00 10.00 75.00 38.00 16.00 - 125.00 10.00 75.00 38.00 32.00 10.00 Gate Valve Branch Flow of Tee 90 Degree Bends Reducer Straight Pipe Total Equivalent Length 290.00 b. Force Main Piping: 20" PVC Piping Fitting / Valve Description # Equivalent Length per Fitting / Valve ea.) Total Equivalent Length (ft.) Straight Pipe 6,575 Total Equivalent Length 6,575 20" D.I. Piping and Equivalent Length of Fittings Equivalent Length per Total Equivalent Fitting / Valve Description # Fitting / Valve Length (ft. / ea.) (ft.) 90 Degree Bend 2 47.00 94.00 45 Degree Bend 7 25.00 175.00 22.5 Degree Bend 6 20.00 120.00 11.25 Degree Bend 2 20.00 40.00 Gate Valve 1 13.00 13.00 Straight Pipe - - 250 Total Equivalent Length 692 4. Projected System Curves: Hazen -Williams Formula ONE PUMP RUNNING y Friction Headloss y^ (J m = y w y O C_ O V C_ U N 2 N C N u O C N jp O L r 2 y = y LL U V) O. Q y U y (n 0) O. a) in E w 3 o w LL E -0 y o -0 LL y v > H w F- IL a . pm 0 88.70 0.00 0.00 0.00 0.00 0.00 88.70 88.70 500 88.70 0.15 0.39 0.18 0.44 0.00 89.24 89.33 1000 88.70 0.55 1.39 0.65 1.60 0.02 90.66 90.96 1500 88.70 1.16 2.94 1.37 3.39 0.04 92.84 93.49 2000 88.70 1.98 5.01 2.33 5.76 0.06 95.76 96.86 2500 88.70 2.99 7.57 3.52 8.71 0.10 99.37 101.03 2750 88.70 3.57 9.03 4.19 10.39 0.12 101.42 103.41 3000 88.70 4.19 10.61 4.93 12.20 0.15 103.65 105.98 3250 88.70 4.86 12.30 5.71 14.15 0.17 106.04 108.73 3500 88.70 5.58 14.11 6.55 16.23 0.20 108.59 111.68 4000 88.70 7.14 18.06 8.39 20.78 0.26 114.16 118.13 TWO PUMPS IN PARALLEL 3 LL m a a V N Friction Headloss m = O m > y^ d = w O 01 0)y 2 d L = m O C o m e c°' ._i O. n y E" w 7 IL c cO U 4 y `o ` a LL o 0 d O. E° 7 y a c d U a o LL y pm (ft.) ft. (ft.) 0 88.70 0.00 0.00 0.00 0.00 0.00 88.70 88.70 500 88.70 0.04 0.39 0.05 0.44 0.00 89.13 89.20 1000 88.70 0.15 1.39 0.18 1.60 0.02 90.26 90.49 1500 88.70 0.32 2.94 0.38 3.39 0.04 92.00 92.50 2000 88.70 0.55 5.01 0.65 5.76 0.06 94.32 95.17 2500 88.70 0.83 7.57 0.98 8.71 0.10 97.20 98.49 2750 88.70 0.99 9.03 1.16 10.39 0.12 98.84 100.38 3000 88.70 1.16 10.61 1.37 12.20 0.15 100.62 102.42 3250 88.70 1.35 12.30 1.58 14.15 0.17 102.52 104.61 4000 88.70 1.98 18.06 2.33 20.78 0.26 109.00 112.07 4500 88.70 2.46 22.46 2.89 25.84 0.33 113.95 117.76 5000 88.70 2.99 27.30 3.52 31.40 0.40 119.39 124.02 5500 88.70 3.57 32.56 4.19 37.45 0.49 125.32 130.84 6000 88.70 4.19 38.24 4.93 43.99 0.58 131.72 138.20 6500 88.70 4.86 44.35 5.71 51.02 0.68 138.60 146.11 Note: Combined flow split evenly between 2 identical pumps in parallel. C. Pump Selection 1. Duplex Non -Clog Submersible Sewage Pumps a. Selected Pump KSB KRT K 200-403/954XNG-S b. Pump Discharge 8 inches c. Motor Horsepower 127.0 HP d. Motor Speed 1,770 RPM e. Electrical Service 460 volt f. Impeller Diameter 13.750 inches a Solids 3.56 inches h. Target Q v. Hd.: 3250 gpm @ 115.00 ft. TDH (End Service Conditions) 2. Estimated Pumping Rate (one pump running) Pump Capacity: 3,500 gpm @ 106 ft. TDH 3,350 gpm @ 110 ft. TDH 3. Estimated Pumping Rate (two pumps running) Pump Curve (Q) Flow (gpm)m 2(0) Flow Total Hd. ft. 0 0 195 250 500 190 500 1000 185 750 1500 180 1000 2000 175 1250 2500 170 1500 3000 165 1750 3500 160 2000 4000 150 2250 4500 145 2500 5000 137 2750 5500 130 3000 6000 125 3250 6500 115 3500 7000 106 3750 7500 100 4000 8000 90 (Begin Service) (End of Service) Pump Capacity: 5,750 gpm/ea. @ 128 ft. TDH (Begin Service) 5,500 gpm/ea. @ 130 ft. TDH (End of Service) /uu 190 180 170 160 150 140 130 120 110 100 90 80 70 60 PUMP & SYSTEM CURVES O rho h�o rho ODO rho hog ^1;P Oo0 �1;P h00 ^h0 Oo0 �h0 h0o '3 ^ho Ooo rho h0o ^ho ODO rho h0o ^4P 0S0 ,3 R R R R h h h h h Flow (GPM) p,.(,P a� D. Wet Well Dimensions. Elevations. and Cycle Times Begin Service End of Service 1. Inside Dimensions, Area 240.00 sf 240.00 sf 2. Pump Station Rim Elevation 806.00 ft. MSL 806.00 ft. MSL 3. Invert of Influent Line 792.57 ft. MSL 792.57 ft. MSL 4. High Level Alarm 792.25 ft. MSL 792.25 ft. MSL 5. Lag Pump On 792.00 ft. MSL 792.00 ft. MSL 6. Lead Pump On 791.75 ft. MSL 791.75 ft. MSL 7. Pump Off 788.30 ft. MSL 788.30 ft. MSL 8. Bottom Wet Well 782.00 ft. MSL 782.00 ft. MSL 9. Detention Volume 6,193.44 gal. 6,193.44 gal. 10 Storage (Pump On to top of 2,675 gal. 2,675 gal. Influent Pipe) 11. Force Main High Point 877.00 ft. MSL 877.00 ft. MSL 12. Force Main Discharge Elev. 877.00 ft. MSL 877.00 ft. MSL 13. Cycle Time: Pump On Time = 2.82 min. Pump Off Time = 4.76 min. Pumping Cycle = 7.58 min. 7.92 Cycles per Hour 15. Volume Pumped Each Cycle 9,853 gal. Note: Cycle times based upon Calculated Pumping Rates. E. Wet Well BuoVancV Calculation 1. Wet Well Volume Wet Well Dimensions 20.00 Width 12.00 Length 1.500 thickness 24.00 depth Slab Dimensions (ft) 14.00 Diameter 1.000 thickness 2. Ground Water Elevation 0.67 feet below rim 3. Total Wet Well Weight (Empty) -677,375 Ibs 4. Weight of Soil on Anti -flotation Collar 980 Soil Volume (ft) 42.6 Assumed unit weight of submerged backfill (Ib/ft) 41,756 Total Weight (lb) 5. Buoyancy Calculation 2792.5 Volume 62.4 Ibs/ft3 174,252 Total Buoyancy -635,619 Total Wet Well & Soil Weight -3.65 Safety Factor 3.02 min. 4.76 min. 7.79 min. 7.71 Cycles per Hour 10,121 gal. Rockingham County Wastewater Capacity Improvements Fast Track Application — Item IX.6 High Priority Lines The project submitted within this application has three directional bore crossings that pass under major streams with proposed HDPE pipe. The following outlines each of these crossings: Line FM-1 (Sta 0+81 to Sta. 8+70): This crossing consists of approximately 200 Lf. of 20-inch restrained joint ductile iron pipe and approximately 589 Lf. of 24" HDPE pipe for the directional bore under Hogan's Creek. Line FM-1 (Sta 108+10 to Sta. 115+33): This crossing consists of approximately 200 Lf. of 20-inch restrained joint ductile iron pipe and approximately 523 Lf. of 24" HDPE pipe for the directional bore under the Dan River. Line FM-1 (Sta 141+43 to Sta. 146+18): This crossing consists of approximately 200 Lf. of 20-inch restrained joint ductile iron pipe and approximately 275 Lf. of 24" HDPE pipe for the directional bore under a tributary stream from the Dan River. e,,. •�w . --�1 IWASTEWATER CAPACITY UPGRADES �m -0m r/ am ROCKINGHAM COUNTY, NC - PROJECT LAYOUT MAP �.,. ��►so :�1 of Mayodan C � r Hogan's Creek Lift Station Upgraded to 3,500 GPM FIRM - 2,016,000 GPD AVG - 5,040,000 GPD Approximately 15,368 Lf. 20" Force Main 0 m Furch CD CD m T` c Gold Hill Lift Station Upgraded to 3,300 GPM FIRM - 4,752,000 GPD AVG - 1,900,800 GPD Pa ne ai ° G� Approximately 15,289 Lf. Wanda 20" Force Main Red Birch Lift Station Upgraded to 3,250 GPM FIRM - 4,680,000 GPD AVG - 1, 872, 000 GPD Approximately 6,824 Lf. 20" Force Main i, T J ❑u Legend Ps Proposed Pump Stations Proposed 20-inch Forcemain Mayodan WWTP Streams County Boundary Parcels 0 1,250 2,500 5,000 Feet