Loading...
HomeMy WebLinkAbout20050732 Ver 30_Stormwater Approval_20150227Dr; North Carolina Department of Environment and Natural Resources Pat McCrory Donald I. van der Vert Governor Secretary February 27, 2015 DWQ Project # 05 -0732 V30 Chatham County Mr. Bill Mumford, Assistant Vice President NNP — Briar Chapel LLC 16 Windy Knoll Circle Chapel Hill, NC 27516 Subject Property: APPROVAL OF STORMWATER PLAN Briar Chapel - SD Commercial Dear Mr. Mumford: On January 11, 2008, the Division of Water Resources (DWR) issued a revised 401 Water Quality Certification to temporarily impact 339 linear feet of stream and 0.157 acre of 404 wetlands and to permanently impact 1,666 linear feet of stream and 0.159 acre of 404 wetland in order to construct the Briar Chapel Subdivision in Chatham County. In order to meet Condition 10 of the 401 Certification for this project, a stormwater management plan (SMP) for the Briar Chapel - SD North Commercial dated January 20, 2015 was received on January 23, 2015. This approval is for the purpose and design that you described in your application. If you change your project, you must notify us and you may be required to send us a new SMP. This approval requires you to follow the conditions listed in the Water Quality Certification for the project and the additional conditions listed below: 1. The SMP approved by the DWR consists of a wet detention basin and a bioretention cell and includes all associated stormwater conveyances, inlet and outlet structures, and the grading and drainage patterns depicted on plan sheets dated January 20, 2015. The plans and specifications for the SD North Commercial project are incorporated by reference into this approval and are enforceable by DWR provided however that any modification of the design for the stormwater management system that is accepted by DWR shall take precedence over the original plans and specifications. The maximum allowable drainage and the maximum impervious areas for the wet detention pond and the bioretention cell shall be those provided in the "401 Narrative & Supporting Calculations — Briar Chapel Development —SD North Commercial" dated Division of Water Resources — 401 & Buffer Permitting Unit 1617 Mail Service Center, Raleigh, North Carolina 27699 -1617 Location: 512 N. Salisbury St. Raleigh, North Carolina 27604 Phone: 919 - 807 -63001 FAX: 919 -807 -6494 Internet: www.ncwaterquality.org An Equal Opportunity 1 Affirmative Action Employer — Made in part by recycled paper NNP— Briar Chapel LLC DVVR Project #05-U7]2V3O Sturmwater Plan Approval Page 2 of 2 January 20, 2015. Any changes to these maximum areas shall require the applicant to submit and receive approval for a revised stormwater management plan by the DWR. The footprint of all stormwater management devices as well as an additional 10-foot wide area on all sides of the devices shall be located in public rights-of-way, dedicated common areas or recorded easement areas. The final plats for the project shoxvingaUsuchrights- of-vvay,connrnonareasandeasennentareassheUbeinaccordancgvviththeapproved plans. 4. Maintenance activities for the wet detention pond and the bioretention cell and related stormwater devices shall be performed in accordance with the notarized O&M agreements signed byLaurie Ford (Vice President, Operations) on January 3O\2O15. The O&M agreements must transfer with the sale ofthe land or transfer ofownership/responsibility for the BIVIP facility. DWR must be notified promptly of every transfer. The applicant and/or authorized agent shall provide a completed Certificate of Completion form to the DWR within thirty (30) days of project completion (available at Thank you for your attention to this matter. If you have any questions or wish to discuss these matters further, please contact Boyd DeVane at (919) 807-6373. Sincerely, Karen Higgins, Supervisor 4O1[& Buffer Permitting Unit [c: USACERa|eid) Regulatory Field Office DVVNRR]file Chatham County Public Works Dept,P.O. Box 155[1Pittsboro,NC 27312 401 Qi Buffer Permitting Unit file Rename: oaoraavuoun