Loading...
HomeMy WebLinkAboutMRR Year 5 Tar River Headwaters Stream Mitigation BankBaker, Caroline D From: Sent: To: Subject: Laserfiche Upload: Email DW R#: 20130184 Doc Date: 1/23/23 Homewood, Sue Wednesday, January 25, 2023 10:54 AM Baker, Caroline D FW: [External] Notice of Year 5 Monitoring Report Review/ MMI Tar River Headwaters Stream Mitigation Bank / SAW-2012-02073 / Person County Doc Type: Mitigation — Mitigation Information Doc Name: General topic of email title Thanks, Sue Homewood (she/her/hers) 401 & Buffer Permitting Branch Division of Water Resources Sue. Homewood@ncdenr.gov 336 813 1863 Email correspondence to and from this address is subject to the North Carolina Public Records Law and may be disclosed to third parties. From: Haywood, Casey M CIV USARMY CESAW (USA)<Casey.M.Haywood@usace.army.mil> Sent: Monday, January 23, 2023 4:17 PM To: Tugwell, Todd J CIV USARMY CESAW (US)<Todd.J.Tugwell@usace.army.mil>; Kim Browning <Kimberly.D.Browning@usace.army.mil>; Davis, Erin B CIV SAW <Erin.B.Davis@usace.army.mil>; Wilson, Travis W. <travis.wilson@ncwildlife.org>; Bowers, Todd <bowers.todd@epa.gov>; Merritt, Katie <katie.merritt@ncdenr.gov>; kathryn matthews@fws.gov Cc: rich@ mogensenmitigation.com; gpottern@rigacarolina.com Subject: [External] Notice of Year 5 Monitoring Report Review/ MMI Tar River Headwaters Stream Mitigation Bank / SAW-2012-02073 / Person County CAUTION: External email. Do not click links or open attachments unless you verify. Send all suspicious email as an attachment to Report Spam. Good afternoon IRT, The below reference bank Sponsor has submitted an Annual Monitoring Report for NCIRT review, and is requesting a release of credits. The Annual Monitoring Report has been posted to the RIBITS Cyber Repository for the bank site (see link and instructions provided below). If you are unable to access the document or prefer to have a hard copy mailed to you, please let me know as soon as possible, and I will arrange to get you a copy of the report. This review will follow the process outline for Credit Release Approval in the 2008 Mitigation Rule (Section 332.8(o)(9)), which requires an IRT review period of 15 calendar days from the date of this email notification. Please provide any comments by 5 PM on the 15-day comment deadline shown below. Comments provided after the 15-day comment deadline may not be considered. If you would like to request a site visit prior to submitting comments, please notify me as soon as possible but prior to the 15-day comment due date. If a site visit is required, the due date for IRT comments will be extended to 15 days after the date of site visit. Once I have received a request for a site visit, I will coordinate with the IRT and Sponsor to arrange for the on -site meeting; however, please note that due to workload it may take a month or longer to arrange the meeting. Within 30 days of the conclusion of the IRT review period (comment deadline), a copy of all comments will be provided to the bank Sponsor and the IRT along with District Engineer's intent to approve or disapprove this credit release. Sponsor: Mogensen Mitigation Inc. Bank Name: Tar River Headwaters Stream Mitigation Bank USACE ID: SAW-2012-02073 River Basin: Tar H UC: 03020101 County: Person USACE PM: Kim Isenhour Requested Credit Release: Year 5 Annual Monitoring 10% of the total stream restoration and/or enhancement credits: 196.5 SMU 15-Day Comment Start Date: January 27, 2023 15-Day Comment Deadline: February 07, 2023 45-Day Credit Release Approval Deadline: March 09, 2023 NOTE: Deadlines will be extended if an on -site meeting is requested. Please be sure to log on to RIBITS before following the link below. Once in the Cyber Repository, select the arrow beside appropriate folder to view and/or download the documents. Cyber Repository Link: httos://ribits.00s.usace.armv.mil/ords/f?o=107:278:15777608510745:::RP.278:P278 BANK ID:2848 Thank you and please contact me with any questions, Casey Casey Haywood Mitigation Specialist, Regulatory Division I U.S. Army Corps of Engineers (919) 750-7397 work cell BUILDING STRONG