Loading...
HomeMy WebLinkAbout20150041 Ver 1_Attach J Charlotte Coal Ash Due Diligence Study_20150224• CHARLOTTL. City of Charlotte Coal Ash Due Diligence Study City Manager's Office August 13, 2014 • CHARLOTTE,. Table of contents Coal Ash Due Diligence Findings Memo .......................3 Exhibit 1 Questions & Answers ........ ..............................6 Environment ....................................... ............................... 6 Water Quality ............ ..............................6 Air Quality .................. ..............................7 Transportation .......... ............................... 7 Land............................ ............................... 8 Science & Engineering ....................... ..............................9 Ash Management .............................. .............................11 Legal.................................................... .............................12 Social................................................... .............................14 Public Safety .......................... .............................14 Community Outreach .......... .............................14 Economic............................................ .............................14 Exhibit 2 Riverbend Coal Ash Ponds ............................16 Exhibit 3 Airport Map ....................... .............................17 Exhibit 4 Transportation Map ......... .............................18 Exhibit 5 Encapsulation Schematic .............................19 K 0 Coal Ash Due Diligence on 9 - August 13, 2014 CHARLOTTE,. Background At the direction of City Council and the City Manager, City staff conducted a Due Diligence study to determine if placing coal ash from the Riverbend Steam Station Power Plant ( "Riverbend" see Exhibit 2) at the Charlotte - Douglas International Airport (the "Airport ")(See Exhibit 3) would be good for the environment and economically beneficial for the Airport. In a presentation to City Council on March 24, 2014, Duke Energy proposed using approximately 4.7 million tons of encapsulated coal ash as structural fill at the Charlotte - Douglas International Airport under a future fourth runway. The coal ash would come from two coal ash ponds at Riverbend Steam Station, a decommissioned power plant on the shores of Mountain Island Lake. Duke Energy working with Charah, a company specializing in coal ash removal and reuse, proposed placing the coal ash in a location that has the potential for future development, including a fourth runway at the Charlotte - Douglas International Airport. It was estimated that encapsulating the coal ash and creating a structural fill in this location would save approximately $30 million in construction costs and would employ one hundred people over five years. The composition of the due diligence interdisciplinary team consisted primarily of City staff, but there was participation from County staff as well. During the course of this endeavor, staff worked closely with Duke Energy, Charah, Moore & Van Allen and the Catawba Riverkeeper to address numerous questions regarding the project. (See Exhibit 1) In addition, the team also received briefings from experts at the University of Kentucky and UNC- Charlotte and consulted with experts in the field, such as Hart and Hickman, a firm specializing in environmental consulting. The Due Diligence effort focused on environmental, legal, social and economic issues. City and County staff along with City Council members made visits to the Riverbend Power Plant and to the Asheville Regional Airport where Duke Energy and Charah are completing a project similar to what was proposed during the March 24 City Council meeting. The team focused on answering two broad questions: Is this project unambiguously good for the environment? Is this project unambiguously good for Charlotte - Douglas International Airport? What follows is a summary of the project team's conclusions regarding these two questions. Good for the Environment The focus of this question was on Mountain Island Lake since it is the body of water adjacent to the Riverbend Steam Station's coal ash ponds and the area most likely to benefit from the removal of coal ash. The power plant has two coal ash ponds on a piece of land that juts out into the lake creating a bend, thus the name Riverbend. The coal ash ponds are held in by an earthen berm and are not lined or covered. Several municipalities have their water intakes in Mountain Island Lake including the City of Charlotte which has its water intake three miles downstream from the coal ash ponds. A coal ash pond failure at Riverbend could result in several potential consequences. It could: Impact water treatment processes and potentially disrupt the water supply for the City of Charlotte and the other municipalities, • Disrupt the recreational use of the lake, and • Impair the water quality of the lake impacting both flora and fauna. The environmental team concluded that removing the coal ash from the ponds at Riverbend would be beneficial for the long -term environmental integrity of Mountain Island Lake. It is estimated that it would take approximately five years to remove all the coal ash from the site operating five days per week. Using a standard dump truck, it would require approximately 220 trips per day. Due to the volume of dump truck traffic and the number of trips necessary to move the coal ash in the short term, air quality could potentially be diminished along the transportation route. The air quality impact would be mitigated through the use of tarps, air quality monitoring and other operational measures to reduce dust. Furthermore, the volume of traffic would represent a degradation of the quality of life (i.e., truck traffic, noise, safety concerns, etc.) for the residents along the travel route, especially in the immediate vicinity of Riverbend. However, these conditions would be temporary and outweighed by the benefit of protecting the long -term integrity of Mountain Island Lake. Staff reviewed the proposed encapsulation plan and determined that it posed a low environmental risk based on the available science and technical knowledge. While there would be logistical challenges, the science and technology are sufficiently advanced that these challenges could be addressed or mitigated. There were however, concerns about the composition of the coal ash. In addition to coal ash, the State stormwater permit allowed other materials to be discharged into ponds at the Riverbend Power Plant. City and County staff received some testing results, but the analysis did not encompass every possible organic or inorganic compound of concern that could potentially be found in the coal ash. In addition, staff recognizes that should coal ash be deposited at an Airport site, that it will also have an environmental impact. Land, air, and water quality could potentially be impacted by this project in the area around the fill site. The extent and duration of the impacts will depend on the site chosen for the coal ash structural fill. Good for the Airport While the possibility of saving $30 million in developing a possible fourth runway is an attractive proposition, after further consideration, the team determined that the risks of placing coal ash under a runway were unacceptably high. In addition, staff ruled out using coal ash under any area that the Airport may use for future airfield development — not just under a future runway. The Charlotte - Douglas International Airport is currently the sixth busiest airport in the U.S. The airport staff indicated that even a remote chance the encapsulation system could fail and /or require maintenance is not acceptable. The loss of use of a runway at the Airport due to a failure in the encapsulation system has several negative consequences: • Impacts operational efficiency and capacity at the Airport, • Impacts revenues for the Airport, • Impacts airline partners' revenue, • Impacts the national air traffic system, 4 • Impacts international air traffic, • Impacts regional (and potentially global) economic systems, • Impacts the estimated 20,000 daily jobs at the Airport, and • Impacts the ability of the Airport to maintain its role as a primary hub to a major airline. It became apparent that any realized construction cost savings would be miniscule compared to the opportunity cost due to a failure in the structural fill. This determination resulted in a negative answer to the question of "Is this good for the Airport ?" In addition, placing coal ash at the Airport presents other challenges. Because the coal ash would be fully encapsulated and topped with six to eight feet of compactable soil, the size of the encapsulation creates development restrictions. Because the Airport is bordered by a rail line and highways, developable property at the airport is limited. Restricting the future use of any portion of Airport property was deemed unacceptable and contributed to the negative determination. Conclusion In reviewing the Duke /Charah proposal, it is evident that the science, technical competency and engineering are sufficiently advanced to mitigate any concerns the City may have and overcome any technical obstacles to making this project as safe and environmentally sound as possible. However, staff is unable to positively answer both questions in favor of the project moving forward as currently proposed. Under a different set of circumstances, it may be possible to continue partnering with Duke Energy to facilitate the removal of coal ash from Riverbend, but that is beyond the scope of the Due Diligence review. What follows are several attachments that provide further details into the environmental, legal, scientific, and other aspects of the project. The first is structured as a Question and Answer to provide greater detail about all aspects of the project. The second is a series of photos of Riverbend and the Airport. Exhibit 1 Questions and Answers by Topic Area Environment Water Quality Question 1: Would Charah conduct ground water monitoring? Yes. However, the number of wells and duration of monitoring was not established. Question 2: To what extent would Charah test for inorganics in the coal ash? (E.g., metals associated with coal ash) Charah has indicated that it would be willing to conduct additional testing. Question 3: To what extent would Charah test for organics in the coal ash? (E.g., other chemicals dumped into the ash ponds) Charah has indicated that it would conduct additional testing. Question 4: Would Charah conduct surface water monitoring prior to, during and post construction? Charah has indicated that it would establish a water quality baseline prior to initiating the project. Periodic water quality testing and post construction testing would be conducted and compared to the established pre- construction sampling baseline data. Question 5: What would be the duration of the monitoring program? Charah has not indicated a duration for monitoring. Question 6: Who would be responsible for the monitoring? Charah would be responsible for all monitoring. Mecklenburg County Water Quality may also conduct independent regulatory sampling. Question 7: What happens if monitoring wells are damaged or eliminated due to new construction? Charah has not provided this information. However, the City would request that a replacement well be drilled to continue monitoring the coal ash structural fill. Question 8: Are there any stormwater receptors or streams located within close proximity to the proposed site? Anywhere on Airport property will have a potential impact on land and streams. There are several jurisdictional streams on Airport property. Question 9: Are there any drinking water wells located down gradient of the proposed location? LUESA has provided staff with a map showing well locations. There are a few wells that may need further investigation. 11 Question 10: Would this project have an impact on the Airport's National Pollutant Discharge Elimination System ( NPDES) permit? If the City maintains ownership of the proposed location and coal ash is placed on the site, the proposed project would require the Airport to revise its NPDES and Stormwater Management Plan to include the coal ash project. Air Quality Question 11: How would dust be controlled? Material will be excavated at Riverbend, transported and placed with a moisture content of at least 20 percent. Trucks would be covered with fastened tarps to reduce the possibility of the coal ash flying into the air during transit. At the Airport site, the City expects Duke / Charah to provide the same standard of action as in their Asheville project. In Asheville, the active cells are kept moist with water trucks. To date, the Asheville Airport project has not generated any dust complaints. This was verified by Mecklenburg County Air Quality. Charah has also indicated that it uses polymers to assist with dust control. Polymers are used to create chemical attractions of particulates resulting in increased particle size reducing likelihood of getting into the air. Polymers are typically mixed with water and applied with mechanized spray equipment. Question 12: Would there be air monitoring? Where and at what frequency would air quality monitoring occur? City staff hired Hart & Hickman, a local environmental consulting firm, to develop a conceptual air quality monitoring plan. Charah has indicated that it would be willing to conduct air quality monitoring at the Riverbend site and along the transportation route. Question 13: Would clean diesel vehicles be used? Charah has a few clean diesel vehicles, but did not indicate that it would fully use clean diesel vehicles for coal ash transport. The City of Charlotte does not currently have a clean diesel policy or program. Question 14: What would be the reporting protocol for being alerted to air quality issues associated with the excavation, transportation and placement of coal ash? Charah is to provide air quality monitoring. No protocol for reporting has been established. Air Quality reporting would require coordination with Mecklenburg County Air Quality. Transportation Question 15: How was the transportation route determined? Staff have driven and flown by helicopter several potential routes. The safest route would have vehicles use Horseshoe Bend Beach Road, to Brookshire Boulevard (NC-16),1-485 to Wilkinson Boulevard. This route minimizes drive time through neighborhoods. Neighborhood and Business Services has created a GIS map of the route with nearby neighborhoods identified (See Exhibit 4). Question 16: How would incident responses be handled? The Charlotte Fire Department (Fire) and Charlotte - Mecklenburg Police Department (Police) would respond to any incident. Neither Fire nor Police feel that any additional planning is required by the City of Charlotte. Fire would notify stations in the response area of the transportation of coal ash. Since the material is non - hazardous, no specialized training or equipment is necessary. Fire recommends that Charah have an emergency response contractor on call in the event of a roadway mishap. Based on the 7 Fire Department's experience, road closures and lane restrictions are lengthened when a mishap occurs and the hauling firm does not have an emergency response contractor on call. Question 17: How would the coal ash be transported from Riverbend to the Airport? Charah would use dump trucks. It is estimated that approximately 220 round trips would be made per day Monday through Friday for the five year project life span. The use of rail was determined by Charah to be logistically non - feasible both for cost and routing reasons. The rail route would require the coal ash to switch at the old inter -modal rail yard at North Davidson Street before heading out to the Airport. Question 18: Would operations be suspended during inclement weather conditions? Potentially. The encapsulation operations would be run similarly to a typical construction project. Question 19: How would dust be controlled during transportation to and from the Riverbend facility and the Airport? Charah has agreed to use tighter fitting tarps on all of their trucks. Subcontractors would also be required to adhere to the tighter tarp policy. Vehicles would go through a truck wash station at the Riverbend facility before heading to the Airport and then once again before embarking upon the return trip from the airport. The beds of the trucks would be covered during both trips to and from the airport with tight fitting liners. Additionally, all material would be transported and placed with a moisture content of 20 percent. Question 20: Would dust along the route be monitored? Staff proposes air quality monitoring along the transportation route. Any complaints would be handled by Mecklenburg County who has responsibility for air quality. Question 21: Who would be responsible for damage to the road? NCDOT may require haul permits. Haulers pay a road use tax plus fuel taxes. The combination of these fees supports the NCDOT roadway system that allows the interstates to be used for hauling for a wide range of projects. The trucks would not be allowed to exceed the roadway weight rating. Question 22: Would the speed of the vehicles be limited? Vehicles would travel the posted speed. Question 23: Who would be responsible for ash that may accumulate along the transportation route? Charah would have an emergency response plan that would include the clean -up of any accumulated coal ash along the transportation route. Land Question 24: How would sediment and erosion control be handled? Charah will design devices using the 25 -year, 24 -hour storm event model and further evaluate the 50 and 100 -year storm event models as they look for the storm water basins to contain the 100 -year storm without overflowing. Charah will also evaluate slope drains for the 50 and 100 -year storms to ensure the earthen berms are not overtopped with these storm events. Charah's design approach to the project's hydrology would consider all those conditions contained in the State's design manual including slopes, soil types, travel paths including sheet flow, shallow concentrated and concentrated flow condition; however, Charah would take conservative measures E3 with regard to identifying time of concentration for both pre- and post - developed conditions. Charah intends to design the erosion and sedimentation control measures in a manner that exceeds the minimum design standards. Question 25: How would run -off from partially constructed cells be handled? Empty graded cells that fill with rain water would be pumped to sediment basins. Sediment basins are large stilling ponds that slowly release water so that sediment particles have time to fall out of suspension in the water column and accumulate at the bottom of pond. Cells containing coal ash that fill with rain water would be pumped into the municipal sanitary sewer system. At no time would coal ash laden stormwater be diverted to a sediment basin. Charlotte - Mecklenburg Utilities Department (CMUD) will require any water discharged to the sanitary sewer system to comply with the City's existing Sewer Use Ordinance including applying for and receiving an industrial discharge permit and meeting water quality requirement as an industrial sewer customer. CMUD may place limitation on the discharge based on volume and /or quantity to protect the sanitary sewer system from spills and /or treatment process disruption. Details of these conditions would have to be determined based on more refined construction plans from the contractor. Question 26: How will leachate and run -off be collected during construction? During and after rain events, cells that are being filled with coal ash would be dewatered with a pump system that would be tied directly into an active sanitary sewer system. Question 27: How will leachate be collected and treated after fill material is sealed? CMUD requires that the effluent meet its requirements for discharges into the sanitary sewer system. CMUD would require testing of the leachate to ensure that none of the chemical characteristics exceed regulatory thresholds. (See Exhibit 5 for a cross section of the liner system including the leachate collection system) Question 28: What will be placed on top of the coal ash fill? At least six feet of structural soil would be placed on top of the encapsulated coal ash fill. (See Exhibit 5) Question 29: Will there be settling over the earthen berms between cells? According to engineers employed by Charah, there will be minimal settling but not enough to impact the structural integrity of the system. Question 30: Could additional waste materials cause problems with the proposed liner system? Charah is conducting tests to determine if there are any constituents that have the potential of compromising the proposed liner material and /or system. Question 31: What is the proximity to residences, daycare centers and schools? No residences, schools or daycare centers are within the immediate vicinity of the Airport location. The transportation route uses Horseshoe Bend Road, Brookshire Boulevard, 1 -485 and Wilkinson Boulevard. There are schools and residences abutting the transit route, including a single family subdivision near Riverbend. 0] Science & Engineering Question 32: Would material only come from the Riverbend Facility? Approximately 4.7 million tons of coal ash would be moved from the Riverbend Power Plant to the Airport. No coal ash from any other Duke Energy power generation facility would be transported to the Airport. Question 33: What wastes have been disposed of in the coal ash ponds? Duke and Charah have indicated that only coal ash is in the ponds. However, the stormwater discharge permit for the Riverbend steam plant allows discharges into the ponds of the following: Induced draft fan and preheater bearing cooling water, stormwater from roof drains, and paving, treated groundwater, track hopper sump (groundwater, coal pile runoff, laboratory drain and chemical makeup tanks and drums rinsate wastes, ash transport water, general plant /trailer sanitary wastewater, metal cleaning waste, chemical metal cleaning waste, combustion turbine cooling water discharges, turbine and boiler room sumps, vehicle rinse water and stormwater from pond areas and up gradient watershed. It is possible that there are other constituent parts beyond simply coal ash in the ponds. As a result, the City staff has requested more comprehensive laboratory testing for organic and inorganic compounds. Question 34: What impacts could other wastes have on the liner system? Charah is conducting tests to determine if there are any constituents that have the potential of compromising the proposed liner material and /or system. Question 35: What is coal ash? Coal ash is the remaining residue from burning coal in a furnace for a coal fired steam power plant. Approximately 90% of the coal is incinerated with the remainder being coal ash. Of that 10 %, 80% is fly ash, meaning it is light enough to leave through the smokestacks. This material, including gypsum, is collected via scrubbers and precipitators in the stacks. The remaining 20% of the ash is called bottom ash in that it is a heavier residue that falls to the bottom of the boiler. Coal ash is not regulated as a hazardous material. In fact, chemically, coal ash is very similar to shale. Ninety percent of the coal ash is silicon, iron, aluminum and calcium. Eight percent is magnesium, potassium, sodium, titanium, and sulfur. Less than 1% are trace elements like arsenic, selenium, mercury and lead. Question 36: What risks are associated with coal ash in a liquid and dry state? Coal ash is the residue leftover from burning coal. Chemically, while similar to shale, the composition of coal ash can vary depending on where the coal was mined. All coal ash contains amounts of silicon dioxide and calcium oxide. Because of the presence of trace heavy metals in the coal ash, there is potential for contamination and health hazards should it leach into the ground water. The points below highlight the more significant concerns. In unlined coal ash ponds, trace heavy metals found in coal ash have the potential to leach and migrate through soils to ground water. The more porous the soil, the higher the risk of ground water contamination from unlined ponds. 10 • Although the concentrations of trace metals are on the low end of the toxicity scale, it is the prolonged and repeated introduction of the trace metals to ground water that over time may lead to toxic concentrations. • Arsenic is toxic (poisonous) and dissolves in ground water. It is also found naturally occurring in minerals which can cause high naturally occurring levels in ground water or surface water. • Mercury bio- accumulates in fish and humans and may lead to cognitive impairment. • In high doses, selenium may be toxic and has the potential to cause a wide array of health issues. • Depending on where the coal was mined varying levels of heavy metals may be present in the ash. • Coal ash ponds on river banks have the potential to fail resulting in contamination of the water body. • Coal ash pond failures have the potential to blanket the bottom substrate of a water body. This can create a desert -like landscape impacting macro - invertebrates, which in turn threatens the complete aquatic food chain within that water body until naturally occurring sediment covers the coal ash and macro - invertebrates reestablish that link of the ecosystem. • Coal ash pond failures also threaten downstream drinking water supplies making the water more difficult to treat and producing by- products with special disposal requirements. Question 37: Could there be any exposure issues for construction workers and inspectors? Charah has indicated that there are no health risks associated with working in or around coal ash. Occupational Safety and Health Administration (OSHA) does not require respirators or any other type of personal protection equipment. Question 38: Was there any research conducted on alternative liner systems? No. Question 39: Would a single or double liner system be used? What type of material would comprise the liner system? Single liner system constructed with a clay bottom layer then layered with a 60 mil High- Density Polyethylene (HDPE) liner. On top of the HDPE liner is a geocomposite drainage layer. Material would be place between the clay, HDPE and geocomposite drainage system. A 40 mil HDPE layer would cap off the encapsulation. All seams would be heat fused. (See Exhibit 5) Question 40: What would be the cover material? The encapsulation would be topped off with a minimum of six feet of structural soil. Question 41: Are there Geotechnical considerations? City staff did not conduct a geotechnical study. Geotechnical studies provide users with information about soil types, depths to bedrock and groundwater. These studies are a precursor to development and provide civil engineers with vital information that dictates design criteria. Charah has conducted a geotechnical study of a portion of airport property. Results have not been shared with City staff. Ash Management Question 42: Would third parties be involved in the design of the encapsulated structural fill? No. Charah would do all the design work. 11 Question 43: Would third parties be allowed to monitor progress and take samples on -site? Charah has indicated that it would hire a third party environmental quality assurance consultant to perform such tasks. Question 44: Would third parties have access to investigate suspected problems? Charah has indicated that it would hire a third party environmental quality assurance consultant to perform such tasks. Question 45: Would third parties be consulted in the future when decisions are made about what will be placed over the structural fill? Charah has indicated that City staff would be included in the design process. Question 46: Would third parties be consulted about repairs and maintenance of the structural fill? Yes. The details of how and who would be responsible for the contracting of third parties was not finalized. Question 47: When would Charah begin moving coal ash? Within six months from the notification to proceed. Question 48: Would the material be staged at any location before final placement? No. Material would be transported from the Riverbend site directly into encapsulated cells at the designated location at the Airport. Question 49: Where will the waste material be placed at the Airport and what would be placed over the encapsulated coal ash? The Airport has determined that the material would not be placed under a runway or in any area for future airfield development. An alternate location owned by the Airport is currently being considered. The material would be placed in encapsulated cells and then covered with a minimum of six feet of structural fill. Question 50: What will be done to clean up contaminated soil under the ash ponds? Duke Energy has indicated that it would remediate the Riverbend site. Final remediation plans have not been shared with the City of Charlotte. It is unknown if Duke Energy has finalized the remediation plans. Question 51: What will be done to clean up contaminated water under the ash ponds? Duke Energy has indicated that it would remediate the Riverbend site. Final remediation plans have not been shared with the City of Charlotte. It is unknown if Duke Energy has finalized the remediation plans. Legal Question 52: What would be the City of Charlotte's future legal exposure? If the City continues to own the land where encapsulated coal ash is used as structural fill, the City remains liable under the Comprehensive Environmental Response Compensation and Liability Act (CERCLA). 12 Question 53: What Federal, State and Local Permits would be required? Duke /Charah would be responsible for NPDES, stormwater, erosion control, Army Corps of Engineers and NC Division of Water Quality stream and wetland impact permits and other applicable permits with the communication with the City regarding the same. Question 54: Would there need to be any Environmental Protection Agency (EPA) or NC Department of Environment and Natural Resources (NCDENR) coordination? Charah /Duke would be responsible for coordination and compliance with EPA and DENR. In addition, Charah /Duke would also communicate with the City regarding the same. Question 55: Would there need to be any Federal Aviation Administration (FAA) coordination required? Airport staff has been consulting with the FAA and plan on continuing do so should the project move forward. Question 56: What is the role of NCDENR? NCDENR regulates coal ash ponds and has a permitting system for the use of coal ash as a structural fill. Duke Energy has an existing National Pollution Discharge Elimination System (NPDES) permit issued and monitored by NCDENR for discharge of water from existing coal ash ponds. Question 57: What role do State or Federal legislation and /or rulemaking have on the proposed project? The State of North Carolina currently has a coal ash bill proposed in the legislature. It is not known when the bill will be finalized. The Federal EPA expects to have finalized their coal ash rulemaking in December 2014. Both proposed regulations result in changes in uses for coal ash as structural fill. Question 58: How would indemnification be handled? City would require that a contract contain joint and several indemnity obligations on the part of Duke Energy and Charah to defend and hold harmless the City and its elected officials, employees, agents etc. Question 59: What would be the contract terms if this project was to go forward? The City would require that a contract provide a definition of coal ash to include all material brought to the fill site, joint and perpetual ownership of coal ash by Duke Energy /Charah, warranties that coal ash does not include hazardous materials, and required testing of coal ash contents. Question 60: Would there be insurance and long term liability? Insurance and long term liability will be the responsibility of Duke Energy /Charah. Question 61: What are the environmental justice issues? City staff will conduct community meetings to better understand neighborhood concerns should this project proceed. Question 62: Would the encapsulated area be recorded at the Register of Deeds? Coal ash location would be recorded on the deed with deed restrictions. 13 Question 63: Would permanent records be kept of the exact location of the waste cells? (As -built drawings) A survey with as -built drawings would be required and would be recorded with the Mecklenburg County Register of Deeds. Question 64: How would the City prevent future damage to the landfill from new construction and grading activities? Deed restrictions pertaining to the depth of excavations would be recorded on the deed. Question 65: Would there be deed restrictions to limit future uses of the property? Deed restrictions pertaining to the depth of excavations would be recorded on the deed. Question 66: Who would be responsible for leachate collection system, berms, cover, monitoring wells, damage to cells or liner system? This would be addressed in a legal agreement between Duke Energy, Charah and the City of Charlotte. Question 67: If structural problems arise in the fill area, who would be responsible for making repairs that continue to protect the public and the environment? This would be addressed in a legal agreement between Duke Energy, Charah and the City of Charlotte. Question 68: If allegations of ground water, surface water, or other problems arise in 2040, who would be responsible? This would be addressed in a legal agreement between Duke Energy, Charah and the City of Charlotte. Question 69: Would bonds be posted, insurance posted or other methods of long term financial assurance be designed to assure that responsible parties have the financial ability to address problems in the future? Charah has not provided this information. Public Safety Question 70: How would emergency response be handled? Fire and Police Departments would respond to any incident. Neither Fire nor Police feel that any additional planning is required by the City of Charlotte. Fire would notify stations in the response area of the transportation of coal ash. Since the material is non - hazardous, no specialized training or equipment is necessary. Charah has stated that it would have a contractor on retainer to handle any coal ash spills should they occur. Community Outreach Question 72: Has the City planned to do any public outreach? One town hall meeting has been conducted at the Westside Service Center. Other locations are currently being scheduled. Public outreach will be conducted jointly with Duke Energy, Charah, the Catawba River Keeper and the City of Charlotte should this project continue. 14 Economic Question 73: What is the benefit of removing the coal ash from the Riverbend facility? Coal Ash would be removed from the banks of the Catawba River. Removing the coal ash ponds would eliminate a potential threat to Charlotte's drinking water and to the integrity and water quality of Mountain Island Lake. The Riverbend facility is located three miles upstream from a drinking water intake for the City of Charlotte. Question 74: Cost savings? No cost savings were determined once the coal ash encapsulation under the proposed fourth runway option was ruled out. Question 75: Would moving the coal ash result in job creation? Charah estimates this project would create 100 jobs during the life of the project. Question 76: Would the City of Charlotte be compensated for costs incurred as part of the due diligence study? Charah has agreed to pay for staff time and outside resources. 15 Exhibit 2 Upper Coal Ash Pon Riverbend Coal Ash Ponds 16 Exhibit 3 Charlotte - Douglas International Airport 17 Exhibit 4 Y Jr M SUWON s t�f Aw a.s z Possible Transportation Route from Riverbend to Airport IM. Exhibit 5 ILL USTRAr1YE PURPOSES ONL Y- NOT rO SC4LE Fully -Lined Engineered Structural Fill XTURED) I RESIDUALS (CCRs) WRAPPED WITH =XTILE COLLECTION PIPE MITE DRAINAGE LAYER IIL HDPE LINER, (TEXTURED) GEOCOMPOSITE CLAY LINER JBGRADE 19