From: ejoyner45@gmail.com
Sent: Friday, January 6, 2023 11:10 AM
To: Annino, Amy M
Cc: Leslie, Andrea J; 'Davis, Brooke A CIV SAW'; Anderson, Mitchell L
Subject: RE: [External] DWR 2022123 - Evert Bulkhead
Attachments: 281 Red Bird Circle Cr - Updated PCN Impact Table and Information.pdf; Submitted - Pre -
Construction Notification (PCN) Form.pdf
CAUTION: External email. Do not click links or open attachments unless you verify. Send all suspicious email as an attachment to
Report Spam.
Amy,
(I'm resending this email because I forgot to copy DWR and USACE to the previous one.)
Attached is a Word Document that I believe lays out all the changes and information that you were asking for. I've
attached a PDF copy of the original PCN form that I submitted as well.
Hopefully, this has everything that you need. If you need anything else or are still missing some information, please feel
free to call me at (717)798-0710.
Due to you being out of the office today I hope that this doesn't affect our January 6th deadline and that our application
stays active.
Thank You
Emma Joyner
From: Annino, Amy M <amy.annino@ncdenr.gov>
Sent: Wednesday, January 4, 2023 4:52 PM
To: ejoyner45@gmail.com
Cc: Leslie, Andrea J <andrea.leslie@ncwildlife.org>; 'Davis, Brooke A CIV SAW'<Brooke.A.Davis@usace.army.miI>;
Anderson, Mitchell L <mitchell.anderson@ncdenr.gov>
Subject: RE: [External] DWR 2022123 - Evert Bulkhead
Hi Emma,
Thanks for this response.
Unfortunately, the PCN impact table can't be edited once the application has been submitted. Most folks just make a
quick table (using the same format as the Impact Table) with the requested updates inserted for DWR / USACE. You can
indicate Temp / Perm impacts in the main table.
I need to know the acreage of proposed temporary fill for the coffer dam, not cubic feet.
Also, can you provide the length of the sea wall to be replaced and the dimensions of the foundation fill?
Thanks,
Amy Annino
Environmental Specialist, Division of Water Resources
North Carolina Department of Environmental Quality
Office: (828) 296-4656 1 Cell: (984) 232-1222
amy.annino@ncdenr.gov
D7
ta"o)
NORTH CAROLINA -�EQ
Department of Environmental Quality
Email correspondence to and from this address is subject to the North
Carolina Public Records Law and may be disclosed to third parties.
From: eioyner45@gmail.com <e0oyner45@gmail.com>
Sent: Wednesday, January 4, 2023 10:54 AM
To: Annino, Amy M <amy.annino@ncdenr.gov>
Cc: Leslie, Andrea J <andrea.leslie@ncwildlife.org>; 'Davis, Brooke A CIV SAW'<Brooke.A.Davis@usace.army.mil>;
Anderson, Mitchell L <mitchell.anderson@ncdenr.gov>
Subject: [External] DWR 2022123 - Evert Bulkhead
CAUTION: External email. Do not click links or open attachments unless you verify. Send all suspicious email as an attachment to
Report Spam.
Amy,
Below is what you requested in your previous email for the Evert Bulkhead Project.
1. Page 7 of 7 carries the signature of Emma Joyner. In order for Emma Joyner to sign, the application package
requires an agent authorization letter from the applicant. A sample agent authorization letter can be found on
the USACE website
(http://www.saw.usace.army.mil/Portals/59/docs/regulatory/regdocs/Permits/SAMPLE AGENT AUTHORIZATIO
N FORM.pdf). [15A NCAC 02H .0502(a)(11)]
2. The construction of the bulkhead in Lake Toxaway is considered a permanent impact. The footprint of the
bulkhead should be noted as permanent on the PCN Impact table. The temporary fill proposed to construct the
coffer dam within the lake must be accounted for on the PCN impact table. Please revise your PCN Impact table
and submit that table via email to DWR and USACE. [15A NCAC 02H .0502(a)]
I've attached the signed Agent Authorization Form you requested.
Regarding your second requests, I was unable to find a place in the PCN Impact Table to note the footprint of the
Bulkhead being Permanent and or to account for the temporary fill to be used in the coffer dam. All this information has
now been noted in the engineers drawing of the project, which I have attached. I've noted the permanent bulkhead as
well as the total cubic feet of temporary fill to be used in the coffer dam.
Please contact me if you have any questions or if you need any additional information.
Thank You
Emma Joyner
Engineering of Brevard, PLLC
(717)798-0710