Loading...
HomeMy WebLinkAbout20071296 Ver 4_Riparian Buffer Authorization Request_20230122Buffer Authorization Application Form 15A NCAC 02B .0233 (8)(b), .0243 (8)(b), .0250 (11)(b), .0259 (8)(b), .0267 (11)(c), .0607 (e)(2) Buffer Authorization Online Form - Update 10/23/2018 Water Reources ENVIRONMENTAL QUALITY Original Submittal 1/22/2023 A. Owner/Applicant Information General Information Primary Contact Email:* Who is submitting the application?* 1. Property Owner Information: la. Name on Recorded Deed: * 1b. Responsible Party: lc. Mailing Address:* Id. Telephone:* 704-591-3017 3. Agent Information: 3a. Name: 3b. Company Affiliation: hager@lakepermit.com Please list the contact person's email for questions or payment on this project if needed. Owner Applicant other than Owner Agent TIMOTHY LOMBARDI (for Corporations) Street Address 170 WINDWOOD LANE Address Line 2 City State / Province / Region TROUTMAN NC Postal / Zip Code Country 28166 US 3c. Mailing Address: Street Address Address Line 2 City Postal / Zip Code 3d. Telephone: 1e. Email Address:* hager@lakepermit.com 3e. Email Address: State / Province / Region Country 3f. Attach a signed and dated copy of the agent Click the upload button or drag and drop files here to attach document authorization form. PDF Only B. Project Information and Prior Project History 1. Project Information la. Name of Project: * LOMBARDI , CRESENT LAND & TIMBER (Subdivision, facility, or establishment name) 1b. Is this a publicly -funded transportation project?* Yes No Id. Subdivision Name: CRESENT LAND & TIMBER 1e. Nearest Municipality: TROUTMAN If. Property Size: 1.64 acres lg. County (or Counties) where the project is located:* Iredell lh. Property ID# 4629524907000 Tax PIN or Parcel id 1 i. Deed Information Date of Purchase 9/1/2020 Type of Book Book# Page# Deed 2730 1886 Map 34 56 1 j. Attach a copy of the recorded map that indicates when the lot was last platted. Click the upload button or drag and drop files here to attach document LOMBARDI SURVEY 160.pdf 222.03KB PDF only 1k. How would you like to provide the Latitude and Longitude information?* Address Lookup - Manually Latitude* 35.638806 Longitude* -80.933354 11. Is the project located in any of North Carolina's twenty coastal counties?* Yes - No 2. Surface Waters 2a. Name of the nearest body of water to proposed project: * LAKE NORMAN 2b. Water Quality Classification of nearest receiving water: CATAWBA 2c. List the total estimated linear feet of all existing streams (intermittent and perennial) on the property: 0 (linear feet only) 3. Project Description: 3a. Describe the existing conditions on the site and the general land use in the vicinity of the project at the time of this application: CONSTRUCTING CART PATH FROM HOME TO SHORELINE 3b. Attach an 8% x 11 excerpt from the most recent version of the USGS topographic map indicating the location of the site. Click the upload button or drag and drop files here to attach document LOMBARDI TOPO.pdf 75.11KB PDF only 3c. Attach an 8 '/2 x 11 excerpt from the most recent version of the published County NRCS Soil Survey Map depicting the project site. Click the upload button or drag and drop files here to attach document LOMBARDI SURVEY.pdf 224.73KB PDF only 4. Proposed Activity Provide a detailed description of the proposed activity including its purpose and include the type of equipment to be used: * CONSTRUCT CART PATH FROM HOME TO SHORELINE BUFFER USING EXCAVATOR Attach a site plan as applicable to the project: Click the upload button or drag and drop files here to attach document LOMBARDI TOPO.pdf 75.11KB PDF only 5. Jurisdictional Determinations 5a. Have jurisdictional wetlands or stream determinations by the Corps or State been requested or obtained for this property/project (including all prior phases) in the past?* Yes ® No 6. Project History 6a. Have permits or certifications been requested or obtained for this project (including all prior phases) in the past? * Yes O No 7. Future Project Plans 7a. Is this project a phased project?* C. Proposed Impacts Inventory Buffer Impacts O Yes O No Project is in which protected Basin?* Neuse River Basin (15A NCAC 02B.0233) • Catawba River Basin (15A NCAC 02B.0243) Randleman Lake Watershed (15A NCAC 02B.0250) Tar -Pamlico River Basin (15A NCAC 02B.0259) Jordan Lake Watershed (15A NCAC 02B.0267) Goose Creek Watershed (15A NCAC 02B.0606 & 15A NCAC 026.0607) Individually list all buffer impacts below. If any impacts require mitigation, then you MUST fill out Section D of this form. Site# - Reason Stream Name Buffer Impact* Impact Type Zone 1 Zone 2 WINDWOOD LN CATAWBA Permanent Allowable 0.00 0.00 Map label (e.g. Road (P) Square Square Crossing 1) Perm or Temp Feet Feet Total Zone 1 Impacts: 0.00 Total Zone 2 Impacts: 0.00 Total Buffer Impacts: 0.00 Comments: D. Impact Justification and Mitigation 1. Avoidance and Minimization ............................................................................................................................................................................................................................................................................................................................................................................................................................................................................................ la. Specifically describe measures taken to avoid or minimize the proposed impacts in designing the project. PERMIT CART PATH AND VARIANCE PERMIT FOR CART PATH, MITIGATION PERMIT AND CREDITS FROM RES 1b. Specifically describe measures taken to avoid or minimize the proposed impacts through construction techniques. NONE E. Diffuse Flow Plan la. What type of SCM are you providing?* Level Spreader Vegetated Conveyance (lower SHWT) Wetland Swale (higher SHWT) Proposed project will not create concentrated stormwater flow through the buffer Other SCM that removed minimum of 30% nitrogen lc. Diffuse Flow Documentation F. Supplementary Information Environmental Documentation Click the upload button or drag and drop files here to attach document LOMBARDI RES LETTER.pdf 132.17KB PDF only la. Does the project involve an expenditure of public (federal/state/local) funds or the use of public (federal/state) land? Yes No Violations 2a. Is the site in violation of DWR Wetland Rules (15A NCAC 02H .0500), Isolated Wetland Rules (15A NCAC 02H .1300), DWR Surface Water or Wetland Standards, or Riparian Buffer Rules (15A NCAC 02B .0200)? Yes No 2b. Is this an after -the -fact buffer authorization application? Yes • No G. Additional Information Please upload any additional information you would like the Division to consider during application review. Additional Attachments: Additional Comments: H. Sign and Submit By digitally signing below, I certify that: Click the upload button or drag and drop files here to attach document LOMBARDI LETTER.pdf PDF only 183.04KB o I have given true, accurate, and complete information on this form; • I agree that submission of this form is a "transaction" subject to Chapter 66, Article 40 of the NC General Statutes (the "Uniform Electronic Transactions Act") o I agree to conduct this transaction by electronic means pursuant to Chapter 66, Article 40 of the NC General Statutes (the "Uniform Electronic Transactions Act"); o I understand that an electronic signature has the same legal effect and can be enforced in the same way as a written signature; AND o I intend to electronically sign and submit the application form." Print Name:* TIMOTHY LOMBARDI Signature Submission Date: TJM T/} Z 2M9A ,P/ 1/20/2023 (Auto populated field) Initial Review Is this accepted into the review process?* Is this project a public transportation project?* Yes No Yes No ID#* 20071296 Version:* 4 Select Reviewer: * Andrew Pitner:eads\ahpitner Select Reviewing Office* Mooresville Regional Office - (704) 663-1699 Has payment been received?* • No Payment Needed Fee Received Need Fee - send electronic notification