Loading...
HomeMy WebLinkAboutNC0044440_Correspondence_20230111RECEIVED/NCDEQ/DWR JAN 11 2023 WOROS MOORESVILLE REGIONAL OFFICE 2022 SYSTEM PERFORMANCE ANNUAL REPORT ilr-Lo o y��lyv WASTEWATER TREATMENT PLANT I. General Information Facility Name: Location: Cherryville Wastewater Treatment Plant 736 Tot Dellinger Road Cherryville, NC 28021 Gaston County Responsible Entity: City of Cherryville, North Carolina Person in Charge: Larry Wright, Wastewater Treatment Plant ORC / Plant Superintendent (704) 435-1739 Iwright@cityofcherryville.com Backup ORC: Chris Heedick, Wastewater Treatment Plant Lab & Backup ORC (704) 435-1739 cheedick@cityofcherryville.com Applicable Permits: TREATMENT WORKS NC 0044440 Expires 07/31/2026 LAB CERTIFICATION # 5619 Expires 12/31/2023 STORMWATER PERMIT# NCG110135 Expires 05/31/2023 LAND APPLICATION PERMIT# WQ0000430 Expires 08/31/2026 Description of Treatment Process: This facility is located on Tot Dellinger Road just outside the city limits. The Plant is an activated sludge plant designed to treat 2.0 MGD - million gallons per day. The facility consist of a bar screen, grit removal, dual oxidation ditches, dual secondary clarifiers, chlorine disinfection and de -chlorination system, flow measurement, cascade aeration, aerated sludge holding tank, sludge storage lagoon, and sludge drying beds which are no longer in use. Currently we are only running half of the plant due to the low flow. This Facility discharges into the Indian Creek, which is classified C water in the Catawba River Basin. II. Performance Summary of System Performance for calendar year 2021: This Facility is well maintained and in good operational condition. Effluent from the secondary clarifiers is of high quality with few suspended solids. The mixed liquor in the aeration basin are mixed well and is maintained at a sufficient dissolved oxygen level for the biological process to operate properly. The mixed liquor in the secondary clarifiers exhibits Good settling characteristics. We drip feed 50% Caustic to maintain alkalinity when needed. Records concerning instrument calibration and process control are being maintained in accordance with NPDES Permit requirements. The discharge monitoring reports (DMRs), chain -of -custody forms, and laboratory analyses form are readily available for review in the facility's office. All records are complete and up- to-date. Overall, for the previous twelve (12) months this facility has performed well. The Wastewater Plant is running smoothly and everything is in good working order. We passed all of our quarterly toxicity testing and was within our permit limits on our monthly DMR reports. We only received one Notice of Violation — NOV-2022-MV-0168. The Notice of Violation was during the month of October 2022, we forgot to sample for our monthly Total Nitrogen and Phosphorus sample. No fines have been issued and we responded with a letter to NCDENR of correction action to assure this does not happen again. 2 We are currently in the process of renovating one of our oxidation ditches. The screenings from both the bar screen and grit removal system are contracted by Berry's Container Service LLC. The screenings are hauled to the Gaston County landfill. Our land application is contracted by Synagro Central, LLC. We contact our Analytical and Toxocity testing out to Meritech Lab, Inc. in Reidsville, NC. The City of Cherryville is currently in the process of updating some of its sewer lines and the water lines were updated as part of the approved 9.5 million dollar bond. FLOW MEASUREMENT: The effluent flow are being measured using an ultrasonic flow meter with a totalizer. Carolina Technical Services, Inc. of China Grove, North Carolina calibrates the flow meter quarterly. The contracted company (performing the meter calibration) should document a comparison of an instantaneous flow measurement to the flow meter's recorded flow rate to verify that the flow meter's accuracy is within 10% of the actual discharge. A full and complete copy of The City of Cherryville Wastewater Treatment Plant's "Performance Annual Report" will be posted on a prominent Bulletin Board located at the City Hall of Cherryville and the Wastewater Treatment Plant. Certification I certify under penalty of law that this report is complete and accurate to the best of my knowledge. I further certify that this report has been made available to the users or customers of the named system and that those users have been notified of its availability. Larryl Wright ORC / Plant Superintendent City of Cherryville, N.C. CC: Brian Dalton, City Manager Date 3 Collection System Performance Annual Report 2022 I. General Information Facility Name: City of Cherryville Responsible Entity: City of Cherryville Person in Charge/Contact: Kevin Abernathy ORC Description of Collection System: The City of Cherryville has around 2500 customers who are mostly residential with light commercial and a few Industrial customers. We maintain around 25 miles of gravity sewer line along with about 10 miles of pressure main and 10 pumping stations. II. Performance Summary of system performance for 2021 fiscal year The City of Cherryville system is in good shape with very few SSO's. We do have some areas that are susceptible to heavy rain and other areas that may have an I/I problem we are still looking to find. These areas result in few overflows. January None February 1 I th 125 Fish Camp Rd. — 400 gal March None April None May None June None July None August None September None October None November None December None III. Notification This report will be available to the public at their request. IV. Certification I certify under penalty of law that this report is complete and accurate to the best of my knowledge. I further certify that this report has been made available to the customers of City of Cherryville and that those users have been notified of its availability. �- y— z 3 zo Kevin Abernathy - Date Water and Sewer Supervisor City of Cherryville