HomeMy WebLinkAbout20221615 Ver 1_More Info Requested_20221207Annino, Amy M
From: Annino, Amy M
Sent: Wednesday, December 7, 2022 4:01 PM
To: Jonathan M. Herman
Cc: brooke.a.davis@usace.army.mil; Leslie, Andrea J; Tim V. Surrett
Subject: DWR 20221615 - Wasterwater Treatment Plant Access Road
Attachments: GC4246 for NW14.pdf
On November 11, 2022, the Division of Water Resources (Division) received your application requesting a 401 Water
Quality Certification from the Division for the subject project. The required fee was received on November 16, 2022. The
Division has determined that your application is incomplete and cannot be processed. The application is on -hold until all
of the following information is received:
1. Per Condition II. 8 of GC 4246, all work must be done "in the dry". Therefore, dewatering methods will be
necessary to temporarily dewater the stream channel during pipe installation. Please provide a construction
sequence that details the method of dewatering to be utilized at the site and the sequence of construction
events to be followed to ensure compliance with this condition. In addition, please ensure that the location of
the temaorary impacts are shown on the construction drawings and clearlv indicated in the revised imaact
table.
a. The EC-44 Detail #7 on Sheet G-002 specifies an arch culvert for this project. This is counter to the
impacts described in the PCN application and shown on the construction drawing set. There is no
discussion of working in the dry, or a description of a pump around on this sheet. Please amend this to
include a written description of the pump around requirement.
b. Sheet C-101 does not discuss a pump around in the construction sequence. Please amend this to include
a written description of the pump around sequence, as well as a drawing on the site plan to indicate the
location of the pump around sequence.
Pursuant to Title 15A NCAC 02H .0502(e), the applicant shall furnish all of the above requested information for the
proper consideration of the application. Please provide your response by January 6, 2023. If all of the requested
information is not received, the Division will be unable to approve the application and it will be denied as incomplete.
The denial of this project will necessitate reapplication to the Division for approval, including a complete application
package and the appropriate fee.
Amy Annino
Environmental Specialist, Division of Water Resources
North Carolina Department of Environmental Quality
Office: (828) 296-4656 1 Cell: (984) 232-1222
amy.annino@ncdenr.gov
D_ E_
�
NORTH CAROLINA t1pi
Department of Environmental Quality
Email correspondence to and from this address is subject to the North
Carolina Public Records Law and may be disclosed to third parties.