Loading...
HomeMy WebLinkAboutNCC230204_ESC Approval Submitted_20230124q ROY COOPER Governor ELIZABETH BISER Secretary .? DOUGLAS ANSEL Interim Director NORTH CAROLiNA Envlranm"ad Quality December 14, 2022 LETTER OF APPROVAL WITH MODIFICATIONS MC Investments of Thomasville, Inc. Attention: Brian Deweese, Owner 210 Gleason Lane Thomasville, NC 27360 RE: Project Name: Baity Plumbing Project ID: DAVID-2023-024 Acres Approved: 3.72 County: Davidson City: Thomasville Address: Kendall Mill Road River Basin: Yadkin - PeeDee Stream Classification: C Submitted By: Hiram J. Marziano, P.E. Date Received by LQS: December 5, 2022 Plan Type: Revised Dear Brian Deweese: This office has reviewed the subject erosion and sedimentation control plan. We find the plan to be acceptable with modifications and hereby issue this letter of Approval with Modifications. The modifications required for approval are listed on the attached page. This plan approval shall expire three (3) years following the date of approval, if no land -disturbing activity has been undertaken, as is required by Title 15A NCAC 4B .0129. As of April 1, 2019, all new construction activities are required to complete and submit an electronic Notice of Intent (eNOI) form requesting a Certificate of Coverage (COC) under the NCG010000' Construction General Permit. After the form is reviewed and found to be complete, you will receive a link with payment instructions for the $100 annual permit fee. After the fee is processed, you will receive the COC via email. As the Financially Responsible Party shown on the FRO form submitted for this project, you MUST obtain the COC prior to commencement of any land disturbing activity. The eNOI form may be accessed at deg.nc.gov/NCG01. Please direct questions about the eNOI form to the Stormwater Program staff in the Raleigh central office. If the owner/operator of this project changes in the future, the new responsible party must obtain a new COC. Title 15A NCAC 4B .011.8(a) and the NCG010000 permit require that the following documentation be kept on file at the job site: North Carolina Department of Environmental Quality I Division of Energy, Mineral, and Land Resources Winston-Salem Regional Office 1450 Hanes Mill Road, Suite 3001 Winston-Salem, North Carolina 27i05 49 Q:336-776-9800 Letter of Approval with Modifications MC Investments of Thomasville, LLC December 14, 2022 Page 3 of 3 MODIFICATIONS REQUIRED FOR APPROVAL Project Name: Baity Plumbing Project ID: DAVID-2023-024 County: Davidson Modifications pursuant to applicable North Carolina General Statutes and/or Regulations: I. Any off -site borrow and waste required for this project must come from a site with an approved erosion control plan, a site regulated under the Mining Act of 1971, or a landfill regulated by the Division of Solid Waste Management. Trash/debris from demolition activities or generated by any activities on site must be disposed of at a facility regulated by the Division of Solid Waste Management or per Division of Solid Waste Management or Division of Water Resources rules and regulations. [I5A NCAC 4B .0110] 2. Additional measures may be required - The applicant is responsible for the control of sediment on -site. If the approved erosion and sedimentation control measures prove insufficient, the applicant must take those additional steps- necessary to stop sediment from leaving this site. [15A NCAC 4B .0115] 3. The NCG01 has a $100 yearly fee and our office often receives closure inspection requests days prior to yearly NCG1 fee payment due dates. Be advised the project requires a closure inspection report by DEMLR prior to filing the Notice of Termination (NOT) to terminate NCGO1 coverage. The closure inspection should not be requested until after the site has achieved full vegetative stabilization and measures have been removed. The removal of temporary ESC measures, including basins, requires prior approval. Often, a full growing season is necessary between initial seeding/mulching and removal of measures. Please plan your construction accordingly to avoid contacting our office prematurely for a closure inspection. Also be advised you may be asked for representative site pictures prior to a closure inspection. [General Comment] Ref: G.S. 113A-54.1 through G.S. 113A-57 Sections 15A NCAC 04A.0101 through 15A NCAC 04E.0504 General Permit NCG 010000 NPDES for Construction Activities