Loading...
HomeMy WebLinkAbout20230118 Ver 1_401 Application_20230119Staff Review Form NORTH CAROLINA Envlronm¢ntcl Qvofiry Updated September 4, 2020 Staff Review Does this application have all the attachments needed to accept it into the review process?* Yes No ID# * 20230118 Version* 1 Is this project a public transportation project?* Reviewer List:* Select Reviewing Office: * Submittal Type:* Yes • No Andrew Moore:eads\awmoore3 Asheville Regional Office - (828) 296-4500 401 Application Does this project require a request for payment to be sent?* Yes No Project Submittal Form Please note: fields marked with a red asterisk * below are required. You will not be able to submit the form until all mandatory questions are answered. Project Type: * For the Record Only (Courtesy Copy) New Project Modification/New Project with Existing ID More Information Response Other Agency Comments Pre -Application Submittal Re-Issuance\Renewal Request Stream or Buffer Appeal Pre -Filing Meeting Date Request was submitted on: 11/4/2022 Project Contact Information Name: Marty Kocot Who is submitting the information? Email Address: mkocot@landworksengineering.com Project Information Project Name: 3122 Hendersonville Road, Fletcher, NC Is this a public transportation project? Yes No Is the project located within a NC DCM Area of Environmental Concern (AEC)? Yes No Unknown County (ies) Henderson Please upload all files that need to be submited. Click the upload button or drag and drop files here to attach document 10-26-22C3-G RAD I N G. pdf Site Map.pdf Site Sketch and V-map.pdf PCN DWR 11-07-22.pdf Permission Executed.pdf Only pdf or kmz files are accepted. Describe the attachments or comments: Full Site Grading Plans. Site Sketch & Vicinity Map Authorization from Owner to submit application Pre -Construction Notification 985.17KB 247.11KB 1.36MB 467.54KB 110.22KB Sign and Submit By checking the box and signing box below, I certify that: • I, the project proponent, hereby certifies that all information contained herein is true, accurate, and complete to the best of my knowledge and belief. • I, the project proponent, hereby requests that the certifying authority review and take action on this CWA 401 certification request within the applicable reasonable period of time. • I agree that submission of this online form is a "transaction" subject to Chapter 66, Article 40 of the NC General Statutes (the "Uniform Electronic Transactions Act"); • I agree to conduct this transaction by electronic means pursuant to Chapter 66, Article 40 of the NC General Statutes (the "Uniform Electronic Transactions Act"); • I understand that an electronic signature has the same legal effect and can be enforced in the same way as a written signature; AND • I intend to electronically sign and submit the online form. Signature: Submittal Date: 1/19/2023 Is filled in automatically. oAzfoJ^ozoQO nm➢o 3. 00 N�gB gg3q ° �a RMq osss A o=mo o / E RED N - �m _ v I \V a °\ rr vcomeo n°N v v I. z c �acni tm V v 'vX < I 1 v \ � v 1 t � I \ y � o \ z FI vI \ 4�Re I i I I v V�� A tt TR p<Ar s<,of ,aos �f v cc= r a m r- o. AV a o 3122 HENDERSONVILLE RDA N ❑ LandWorksEngineerinq ° ❑ La d Pla 9 & C 1 Eng n nng o° mzso Long Shoals Partners, LLC Town of Fletcher, Henderson CO., NC .❑ ,� e c oz ER4i "Ivoeze C3 GRADINGI EROSION CONTROL PLAN T Qz= re d t ! LO .C: 0 cu —r0 ƒ&�®)u $CCU \F§rf � 0 o c: /®027�y \k�»Ecu .00=r / C) C) oc���§z o a o Gm,�,oJ g = S§# oB— °°° z; "0 U) C &}G0oD= sue£&#.Ezo / 7cu -Ec: §,«7= ,- , , \ o { U) " a) � / 0E ?�0 E -0-0 §§/ ==G°-o� % M 02 .,,.�__� ba®=2{E L§&e±G 3$§/S"&¥Q)/-0 L C52—cu 0 » /— = /.E/tD- / 2�°��\u E 6- 2 -j 2�0�, a Ln o E 0 2 `-2 c: � 7-r-0)L J } $ § # } \ ® / \ j } | E] ( � e CDf / § $ � / § § \ \ § ± \ 2 0 ] / k Q CY) / r / ►/ � .�' .-fie .CID 4 Vn Z cv C 47LF 48"� � ��� PIPE % 96 v 21 .21 W / 1 9 / O .219 f s sue- s (HOLE WITH FRAME GRATE COVER PER D 840.03C TYPE E 'APPROVED EQUAL. E CLOTH & GRAVEL ET PROTECTION PER IEQ STD DETAIL 6.51 (TYP). ire OF I Y . m RBANCE (TYP). O �' N �i 21-95 co �SF— SF _ SF SF SFSF SF/ W Oki /- �o Ll4 2�\ _ - - - - - - � - NC Surface Water Classification -t ,f on� ,ti au,�n NORTH CAROLINA Environmental Quality Water Resources Office Use Only Corps Action I D no. [Click to enter.] Date received: [Click to enter.] DWR project no. Click enter.] Date received: [Click to enter.] Site Coordinates: Latitude (DD.DDDDDD): 35.4405 Longitude (DD.DDDDDD):-82.5041 Form Version 4.3, April 20, 2022 Pre -Construction Notification (PCN) Form (Ver. 4.2, January 31, 2022)) For Nationwide Permits and Regional General Permits and corresponding Water Quality Certifications Please note: fields marked with a red asterisk are required. The form is not considered complete until all mandatory questions are answered. The PCN help document may be found at this link: https://edocs.deg.nc.gov/WaterResources/DocView.aspx?dbid=0&id=2196924&cr=1 Please ensure you have submitted a pre -filing meeting request at least 30 days prior to submitting this form, as DWR will not be able to accept your application without documentation of this important first step. The Division has developed a Pre -filing Meeting Request email address 401 PreFile(a)-ncdenr.gov to accept the federally required pre -filing meeting request and provide confirmation receipt of submittal . This receipt or similar documentation will satisfy 40 C.F.R. Section 121.4(a) which states "At least 30 days prior to submitting a certification request, the project proponent shall request a pre -filing meeting with the certifying agency." In accordance with 40 C.F.R. Section 121.5(b)(7), and (c)(5), all certification requests must include documentation that a pre -filing meeting request was submitted to the certifying authority at least 30 days prior to submitting the certification request. Attach documentation of Pre -Filing Meeting Request to this Application. Date of Pre -filing Meeting Request (MM/DD/YYYY) : 11/7/2022 Page 1 of 20 PCN Form Version 4.3- April 20, 2022 A. Processing Information County (counties) where project is located: Henderson Additional (if needed). Is this a NCDMS project? (Click yes only if NCDMS is the applicant or co- ❑ Yes ❑x No applicant) Is this a public transportation project? (Publicly funded municipal, state, or federal road, rail, ❑ Yes ❑x No or airport project) Is this a NCDOT project? ❑ Yes ❑x No If yes, NCDOT TIP or state project number: Click to enter. If yes, NCDOT WBS number: Click to ente ❑x Section 404 Permit (wetlands, streams, waters, Clean Water Act) la. Type(s) of approval sought from the Corps: ❑ Section 10 Permit (navigable waters, tidal waters, Rivers and Harbors Act) Has this PCN previously been submitted? ❑ Yes ❑x No Please provide the date of the previous submission. Click to enter a date. ❑x Nationwide Permit (NWP) 1 b. What type(s) of permit(s) do you wish to seek ❑ Regional General Permit (RGP) authorization? ❑ Standard (IP) This form may be used to initiate the standard/ individual permit process with the USACE. Please contact your Corps representative concerning submittals for standard permits. All required items can be included as attachments and submitted with this form. 1 c. Has the NWP or GP number been verified by the Corps? ❑ Yes ❑x No NWP number(s) (list all numbers ): Click to enter. RGP number(s) (list all numbers ): Click to enter. Are you a federal applicant? ❑ Yes ❑x No If yes, please provide a statement concerning compliance with the Coastal Zone Management Act Click to enter text. 1d. Type(s) of approval sought from DWR (check all that apply): ❑x 401 Water Quality Certification — Regular ❑ 401 Water Quality Certification— Express ❑ Non-404 Jurisdictional General Permit ❑ Riparian Buffer Authorization ❑ Individual 401 Water Quality Certification Is this a courtesy copy notification ❑ Yes ❑x No 1e. Is this notification solely for the record because written approval is not required? For the record only for DWR 401 Certification: ® Yes ❑ No For the record only for Corps Permit: ❑ Yes ❑x No 1f. Is this an after -the -fact permit/certification application? ❑ Yes ❑x No Page 2 of 20 PCN Form Version 4.3- April 20, 2022 1g. Is payment into a mitigation bank or in -lieu fee program proposed for ❑ Yes ❑x No mitigation of impacts? If yes, attach the acceptance letter from mitigation bank or in -lieu fee program. 1 h. Is the project located in any of NC's twenty coastal counties? * ❑ Yes ❑x No 1 i. Is the project located within an NC DCM Area of Environmental ❑ Yes ❑x No ❑ Unknown Concern (AEC)? * 1j. Is the project located in a designated trout watershed? * ❑ Yes ❑x No If yes, you must attach a copy of the approval letter from the appropriate Wildlife Resource Commission Office. Trout information may be found at this link: http://www.saw.usace.army.miI/Missions/Regulatory-Permit- Program/Agency-Coordination/Trout.aspx Page 3 of 20 PCN Form Version 4.3- April 20, 2022 B. Applicant Information 1a. Who is the primary contact? Marty Kocot PE Landworks Engineering 1 b. Primary Contact Email: mkocot@landworksengineering.com 1 c. Primary Contact Phone: (###)###-#### 828.230.7958 1 d. Who is applying for the permit/certification? (check all that apply) ® Owner ❑ Applicant (other than owner) 1 e. Is there an agent/consultant for this project? ® Yes ❑ No 2. Landowner Information 2a. Name(s) on Recorded Deed: Kompo Family Company, LLC 2b. Deed Book and Page No.: 3945/618 2c. Contact Person (for corporations): Carr Swicegood 2d. Address Street Address: 418 McDowell Street Address line 2: Click to enter. City: Asheville State/ Province/ Region: NC Postal/ Zip Code: 28803 Country: Click to enter. 2e. Telephone Number: (###)###-#### 828-779-9020 2f. Fax Number: (###)###-#### Click to enter 2g. Email Address: carrswice@gmail.com 3. Applicant Information (if different from owner) 3a. Name: Click to enter. 3b. Business Name (if applicable): Click to enter. 3c. Address: Street Address: Click to enter. Address line 2: Click to enter. City: Click to enter. State/ Province/ Region: Click to enter. Postal/ Zip Code: Click to enter. Country Click to enter. 3d. Telephone Number: (###)###-#### Click to enter. 3e Fax Number: (###)###-#### Click to enter. 3f. Email Address: Click to enter. Page 4 of 20 PCN Form Version 4.3- April 20, 2022 4. Agent/ Consultant (if applicable) 4a. Name: Marty Kocot, PE 4b. Business Name: Landworks Engineering, PLLC 4c. Address: Street Address: PO NBox 1922 Address line 2: Click to enter. City: Asheville State/ Province/ Region: NC Postal/ Zip Code: 28802 Country: USA 4d. Telephone Number: (###)###-#### 828-230-7958 4e Fax Number: (###)###-#### Click to entr 4f. Email Address: mkocot@landworksengineering.com Agent Authorization Letter: Attach a completed/signed agent authorization form or letter. A sample form may be found at this link: https://www.saw.usace.army. mil/Missions/Reg ulatory-Permit-Program/Permits/2017-Nationwide-Permits/Pre- construction-Notification/ Page 5 of 20 PCN Form Version 4.3- April 20, 2022 C. Project Information and Prior Project History 1. Project Information 1 a. Name of project: * 3122 Hendersonville Road Commercial Site 1 b. Subdivision name (if appropriate): Click to enter. 1c. Nearest municipality/town: * Fletcher 2. Project Identification 2a. Property identification number (tax PIN or parcel ID): 9653-63-7344 2b. Property size (in acres): 4.94 2c. Project Address: Street Address: 3122 Hendersonville Road Address line 2: Click to enter. City: Fletcher State/ Province/ Region: NC Postal/ Zip Code: 28732 Country: USA 2d. Site coordinates in decimal degrees (using 4-6 digits after the decimal point): * Latitude (DD.DDDDDD): * 35.4405 Longitude (-DD.DDDDDD): *--82.5041 3. Surface Waters 3a. Name of nearest body of water to proposed project: * Cane Creek 3b. Water Resources Classification of nearest receiving Class C water: * The Surface Water Classification map may be found at this link: httr)s:Hncdenr.maps.arcqis.com/apes/webappviewer/index.html?id=6el 25ad7628f494694e259c80dd64265 French Broad 3c. In what river basin(s) is your project located? * Choose additional (if needed) 3d. Please provide the 12-digit HUC in which the project is 06010105 located: The Find Your HUC map may be found at this link: https:Hncdenr.maps.arcqis.com/apps/Publiclnformation/index.html?appid=ad3a85aOc6d644aOb97cdO69db238ac3 Page 6 of 20 PCN Form Version 4.3- April 20, 2022 4. Project Description and History 4a. Describe the existing conditions on the site and the general land use in the vicinity of the project at the time of this application: Former commercial site discharge from Baldwin Circle (R-2213) through existing NCDOT 36 inch RCP culvert. Intermittent flow during storm events. 4b. Have Corps permits or DWR certifications been obtained for this ❑ Yes ❑ No ❑x Unknown project (including all prior phases) in the past? If yes, please give the DWR Certification number and/or Corps [Click to enter.] Action ID (ex. SAW-0000-00000): IClick to enter.] Attach any pertinent project history documentation 4b2. Is any portion of the work already complete? ❑ Yes ❑x No If yes, describe the completed work. Click to enter te> 4c. List of other certifications or approvals/denials received from other federal, state or local agencies for work described in this application not related to the 404 or 401. ('UnL 4n nn+nr 4c 4d. Attach an 8'Y2 x 11" excerpt from the most recent version of the USGS topographic map indicating the location of the project site. 4e. Attach an 8'Y2 x 11" excerpt from the most recent version of the published County NRCS Soil Survey map depicting the project site. 4f. List the total estimated acreage of all existing wetlands on the 0 acres property: 4g. List the total estimated linear feet of all existing streams (intermittent 165 linear feet and perennial) on the property: 4g1. List the total estimated acreage of all existing open waters on the 0 acres property: 4h. Explain the purpose of the proposed project: 45 ft. +/- culvert extension to provide site grading and driveway access to Baldwin Circle per NCDOT Driveway requirements. 4i. Describe the overall project in detail, including the type of equipment to be used: Install a inlet and extend the culvert approximately 45 feet to the property line utilizing typical construction equipment such as a trackhoe. 4j. Attach project drawings/site diagrams/depictions of impact areas for the proposed project. 4k. Will this activity involve dredging in wetlands or waters? ® Yes ❑ No If yes, describe the type of dredging, the composition of the dredged material, and the locations of disposal area. Just excavation and installation of suitable bedding material for the culvert installation. Excavated material to be disposed of on site. Page 7 of 20 PCN Form Version 4.3- April 20, 2022 5. Jurisdictional Determinations 5a. Have the wetlands or streams been delineated on the property or in ❑ Yes ❑x No ❑ Unknown proposed impact areas? Comments: The stream channel is visible observable. 5b. If the Corps made a jurisdictional determination, ❑ Preliminary ❑ Approved ❑ Emailed concurrence what type of determination was made? ❑ Not Verified ❑ Unknown ❑ n/a Corps AID number (ex. SAW-0000-00000): ^lick to nnta- Name (if known): Click to enter. 5c. If 5a is yes, who delineated the jurisdictional Agency/Consultant Company: Click to enter. areas? Other: Click to enter. 5d. List the dates of the Corps jurisdictional determination or State determination if a determination was made by either agency. 'link to PntPr 5d1. Attach jurisdictional determinations. 6. Future Project Plans 6a. Is this a phased project? ® Yes ❑ No 6b. If yes, explain. Mass grading of the site but buildout of individual commercial buildings may be phased. Are any other NWP(s), regional general permit(s), or individual permit(s) used, or intended to be used, to authorize any part of the proposed project or related activity? This includes other separate and distant crossings for linear projects that require Department of the Army authorization but don't require pre -construction notification. Potential MSD Sewer extensions to serve the site. 7. Addresses of adjoining property owners, lessees, etc. whose property adjoins the waterbody (if more than can be entered here, please attach a supplemental list) Ruby F. Hendrick, 65 Baldwin Circle, Fletcher, NC 28732 PIN 9653-63-7600 8. Scheduling of activity: December 2022 Page 8 of 20 PCN Form Version 4.3- April 20, 2022 D. Proposed Impacts Inventory Impacts Summary ❑ Wetlands ❑x Streams - tributaries 1 a. Where are the impacts associated with your project ❑x Buffers ❑ Open Waters (check all that apply): ❑ Pond Construction 2. Wetland Impacts If there are wetland impacts proposed on the site, complete this table for each wetland area impacted. 2a. Site # 2a1. Impact Reason/Type 2b. Impact Duration 2c. Wetland Type 2d. Wetland Name 2e. Forested ? 2f. Jurisdiction Type 2g. Impact Area (ac) W1 Choose one emp/ Perm Choose onE ,lick to enter Y/I\ ;hoose one Click to enter W2 Choose one Temp/ Perm Choose one Click to enter Y/N Choose one Click to enter W3 Choose one Temp/ Perm Choose one Click to enter Y/N Choose one Click to enter W4 Choose one Temp/ Perm Choose one Click to enter Y/N Choose one Click to enter W5 Choose one Temp/ Perm Choose one Click to enter Y/N Choose one Click to enter W6 Choose one Temp/ Perm Choose one Click to enter Y/N Choose one Click to enter W7 Choose one -emp/ Perm Choose onE Click to enter Y/N choose one Click to enter W8 Choose one Temp/ Perm Choose one Click to enter Y/N Choose one Click to enter W9 Choose one Temp/ Perm Choose one Click to enter Y/N Choose one Click to enter W10 Choose one Temp/ Perm Choose one Click to enter Y/N Choose one Click to enter W11 Choose one Temp/ Perm Choose one Click to enter Y/N Choose one Click to enter W12 Choose one Temp/ Perm Choose one Click to enter Y/N Choose one Click to enter W13 Choose one Temp/ Perm Choose one Click to enter Y/N Choose one Click to enter W14 Choose one Temp/ Perm Choose one Click to enter Y/N Choose one Click to enter W15 Choose one Temp/ Perm Choose one Click to enter Y/N Choose one Click to enter 2g1. Total temporary wetland impacts Click to enter. ac 2g2. Total permanent wetland impacts Click to enter. ac 2g3. Total wetland impacts Click to enter. ac 2h. Type(s) of material being discharged and the amount of each type in cubic yards: Click to enter text. 2i. Comments: Click to enter text. Page 9 of 20 PCN Form Version 4.3- April 20, 2022 3. Stream Impacts If there are perennial or intermittent stream/ tributary impacts (including temporary impacts) proposed on the site, complete this table for all stream/ tributary sites impacted. ** All Perennial or Intermittent streams must be verified by DWR or delegated local government Site # 3a Impact Reason 3b. Impact Duration 3c. Impact Type 3d. Stream Name 3e. Stream Type 3f. Jurisdiction Type 3g. Stream Width (avg ft) 3h. Impact length (linear ft) S1 Culvert Ext. Permanent Excavation Un-named Trib to Cane Creek Intermittent Both 3 45 S2 Click to enter Temp/ Perm Choose one Click to enter Per/Int Choose one Click to enter Click to enter S3 Click to enter Temp/ Perm Choose one Click to enter Per/Int Choose one Click to enter Click to enter S4 Click to enter Temp/ Perm Choose one Click to enter Per/Int Choose one Click to enter Click to enter S5 Click to enter Temp/ Perm Choose one Click to enter Per/Int Choose one Click to enter Click to enter S6 Click to enter Temp/ Perm Choose one Click to enter Per/Int Choose one Click to enter Click to enter S7 Click to enter Temp/ Perm Choose one Click to enter Per/Int Choose one Click to enter Click to enter S8 Click to enter Temp/ Perm Choose one Click to enter Per/Int Choose one Click to enter Click to enter S9 Click to enter Temp/ Perm Choose one Click to enter Per/Int Choose one Click to enter Click to enter S10 Click to enter Temp/ Perm Choose one Click to enter Per/Int Choose one Click to enter Click to enter S11 Click to enter Temp/ Perm Choose one Click to enter Per/Int Choose one Click to enter Click to enter S12 Click to enter Temp/ Perm Choose one Click to enter Per/Int Choose one Click to enter Click to enter S13 Click to enter Temp/ Perm Choose one Click to enter Per/Int Choose one Click to enter Click to enter S14 Click to enter Temp/ Perm Choose one Click to enter Per/Int Choose one Click to enter Click to enter S15 Click to enter Temp/ Perm Choose one Click to enter Per/Int Choose one Click to enter Click to enter S16 Click to enter Temp/ Perm Choose one Click to enter Per/Int Choose one Click to enter Click to enter S17 Click to enter Temp/ Perm Choose one Click to enter Per/Int Choose one Click to enter Click to enter S18 Click to enter Temp/ Perm Choose one Click to enter Per/Int Choose one Click to enter Click to enter S19 Click to enter Temp/ Perm Choose one Click to enter Per/Int Choose one Click to enter Click to enter S20 Click to enter Temp/ Perm Choose one Click to enter Per/Int Choose one Click to enter Click to enter 3i1. Total jurisdictional ditch impact: Click to enter. linear ft 3i2. Total permanent stream impacts: Click to enter. linear ft M. Total temporary stream impacts: Click to enter. linear ft 34. Total stream and ditch impacts: 45 linear ft 3j. Comments: lick to enter. Page 10 of 20 PCN Form Version 4.3- April 20, 2022 4. Open Water Impacts If there are proposed impacts to lakes, ponds, estuaries, tributaries, sounds, the Atlantic Ocean, or any other open water of the U.S., individually list all open water impacts in the table below. 4a. Site #* 4a1. Impact Reason 4b. Impact Duration* 4c. Waterbody Name* 4d. Activity Type* 4e. Waterbody Type* 4f. Impact area (ac)* 01 Click to enter. Temp/ Perm Click to enter. Choose one :hoose one Click to enter. 02 Click to enter. Temp/ Perm Click to enter Choose one -hoose one Click to enter. 03 Click to enter. Temp/ Perm Click to enter. Choose one Choose one Click to enter. 04 Click to enter. Temp/ Perm Click to enter. Choose one Choose one Click to enter. 05 Click to enter. Temp/ Perm Click to enter. Choose one Choose one Click to enter. 4g. Total temporary open water impacts Click to enter. ac 4g. Total permanent open water impacts Click to enter. ac 4g. Total open water impacts Click to enter. ac 4h. Comments: Click to enter. 5. Pond or Lake Construction If pond or lake construction is proposed, complete the table below. (*This does NOT include offline stormwater management ponds.) 5a. 5b. 5c. 5d. 5e. Pond ID Proposed use or Wetland Impacts (ac) Stream Impacts (ft) Upland # purpose of pond Impacts (ac) Flooded Filled Excavated Flooded Filled Excavated P1 Choose one Click to Click to Click to Click to Click tc Click to Click to enter. enter. enter. enter. enter. enter. entF P2 Choose one Click to Click to Click to Click to Click to Click to Click to enter. enter. enter. enter. enter. enter. entF P3 Choose one Click to Click to Click to Click to Click to Click to Click to enter. enter. enter. enter. enter. enter. enter. 5f. Total Click to Click to Click to Click to Click to Click to Click enter. enter. enter. enter. enter. enter. ente 5g. Comments: Click to enter. 5h. Is a dam high hazard permit required? ❑ Yes ❑ No If yes, permit ID no.: Click to enter. 5i. Expected pond surface area (acres): Click to enter. 5j. Size of pond watershed (acres): Click to enter. 5k. Method of construction: Click to enter. Page 11 of 20 PCN Form Version 4.3- April 20, 2022 6. Buffer Impacts (DWR requirement) If project will impact a protected riparian buffer, then complete the chart below. Individually list all buffer impacts. 6a. Project is in which protected basin(s)? (Check all that apply.) ❑ Neuse ❑ Tar -Pamlico ❑ Catawba ❑ Jordan ❑ Goose Creek ❑ Randleman ❑ Other: Click to ente Site #* 6b. Impact Type* 6c. Impact Duration* 6d. Stream Name* 6e. Buffer Mitigation Required?* 6f. Zone 1 Impact* (sq ft) 6g. Zone 2 Impact* (sq ft) 131 Choose one Temp/ Perm Click to enter. Y/N Click to enter. Click to enter B2 Choose one Temp/ Perm Click to enter. Y/N Click to enter. Click to enter B3 Choose one Temp/ Perm Click to enter. Y/N Click to enter. Click to enter B4 Choose one Temp/ Perm Click to enter. Y/N Click to enter. Click to enter B5 Choose one Temp/ Perm Click to enter. Y/N Click to enter Click to enter. B6 Choose one Temp/ Perm Click to enter. Y/N Click to enter Click to enter. B7 Choose one Temp/ Perm Click to enter. Y/N Click to enter Click to enter. B8 Choose one Temp/ Perm Click to enter. Y/N Click to enter Click to enter. B9 Choose one Temp/ Perm Click to enter. Y/N Click to enter Click to enter. B10 Choose one Temp/ Perm Click to enter. Y/N Click to enter Click to enter. 1311 Choose one Temp/ Perm Click to enter. Y/N Click to enter Click to enter. B12 Choose one Temp/ Perm Click to enter. Y/N Click to enter Click to enter. B13 Choose one Temp/ Perm Click to enter. Y/N Click to enter Click to enter. B14 Choose one Temp/ Perm Click to enter. Y/N Click to enter Click to enter. B15 Choose one Temp/ Perm Click to enter. Y/N Click to enter Click to enter. B16 Choose one Temp/ Perm Click to enter. Y/N Click to enter Click to enter. B17 Choose one Temp/ Perm Click to enter. Y/N Click to enter. Click to enter. B18 Choose one Temp/ Perm Click to enter. Y/N Click to enter Click to enter. B19 Choose one Temp/ Perm Click to enter. Y/N Click to enter Click to enter. B20 Choose one Temp/ Perm Click to enter. Y/N Click to enter. Click to enter. 6h. Total temporary impacts: Zone 1: Click to enter. sq ft Zone 2: Click to enter. sq ft 6h. Total permanent impacts: Zone 1: Click to enter sq ft Zone 2: Click to enter. sq ft 6h. Total combined buffer impacts: Zone 1: Click to enter. sq ft Zone 2: Click to enter. sq ft 6i. Comments: UICK to enter. Please attach supporting documentation (impact maps, plan sheets, etc.) for the proposed project. Page 12 of 20 PCN Form Version 4.3- April 20, 2022 E. Impact Justification and Mitigation 1. Avoidance and Minimization 1a. Specifically describe measures taken to avoid or minimize the proposed impacts through project design: Collect and treat the runoff from the first inch of rainfall per Henderson County. 1 b. Specifically describe measures taken to avoid or minimize proposed impacts through construction techniques: Stormwater Quality and Stormwater Quantity Post Development Treatment Required 2. Compensatory Mitigation for Impacts to Waters of the U.S., Waters of the State, or Riparian Buffers 2a. If compensatory mitigation is required, by whom is it required? ❑ DWR ❑ Corps (check all that apply) 2b. If yes, which mitigation option(s) will be used for this ❑ Mitigation Bank project? (check all that apply) ❑ In Lieu Fee Program ❑ Permittee Responsible Mitigation 3. Complete if using a Mitigation Bank (Must satisfy NC General Statute143-214.11 (d1).) 3a. Name of mitigation bank: Click to enter. 3b. Credits purchased/requested: Type: Choose one Quantity Click to enter. Type: Choose one Quantity Click to enter. Type: Choose one Quantity Click to enter. Attach receipt and/or approval letter. 3c. Comments: Click to enter. 4. Complete if Using an In Lieu Fee Program 4a. Attach approval letter from in lieu fee program. 4b. Stream mitigation requested: Click to enter. linear feet 4c. If using stream mitigation, what is the stream temperature: Choose one NC Stream Temperature Classification Maps can be found under the Mitigation Concepts tab on the Wilmington District's RIBITS website: (Please use the filter and select Wilmington district) https://ribits.usace.army.miI/ribits apex/f?p=107:27:2734709611497::NO:RP:P27 BUTTON KEY:O 4d. Buffer mitigation requested (DWR only): Click to enter. square feet 4e. Riparian wetland mitigation requested: Click to enter. acres 4f. Non -riparian wetland mitigation requested: Click to enter. acres 4g. Coastal (tidal) wetland mitigation requested: Click to enter. acres 4h. Comments: lick to enter. Page 13 of 20 PCN Form Version 4.3- April 20, 2022 5. Complete if Providing a Permittee Responsible Mitigation Plan 5a. If proposing a permittee responsible mitigation plan, provide a description of the proposed mitigation plan, including mitigation credits generated. �lirk to nntar 5b. Attach mitigation plan/documentation. 6. Buffer Mitigation (State Regulated Riparian Buffer Rules) — DWR requirement 6a. Will the project result in an impact within a protected riparian buffer ❑ Yes ❑ No that requires buffer mitigation? If yes, please complete this entire section — please contact DWR for more information. 6b. If yes, identify the square feet of impact to each zone of the riparian buffer that requires mitigation. Calculate the amount of mitigation required in the table below. 6c. 6d. 6e. Zone Reason for impact Total impact Multiplier Required mitigation (square feet) (square feet) Zone 1 Click to enter. Click to enter. Choose one Click to enter. Zone 2 Click to enter. Click to enter. Choose one Click to enter. 6f. Total buffer mitigation required Click to enter. 6g. If buffer mitigation is required, is payment to a mitigation bank or ❑ Yes ❑ No NC Division of Mitigation Services proposed? 6h. If yes, attach the acceptance letter from the mitigation bank or NC Division of Mitigation Services. 6i. Comments: Click to enter. Page 14 of 20 PCN Form Version 4.3- April 20, 2022 F. Stormwater Management and Diffuse Flow Plan (DWR requirement) 1. Diffuse Flow Plan 1 a. Does the project include or is it adjacent to protected riparian buffers ❑ Yes ❑x No identified within one of the NC Riparian Buffer Protection Rules? 1 b. All buffer impacts and high ground impacts require diffuse flow or other form of stormwater treatment. If the project is subject to a state implemented riparian buffer protection program, include a plan that fully documents how diffuse/dispersed flow will be maintained. All Stormwater Control Measures (SCM) must be designed in accordance with the NC Stormwater Design Manual (https://deg.nc..qov/about/divisions/energv-mineral-land-resources/energv-mineral-land-permit- guidance/stormwater-bmp-manual). Associated supplement forms and other documentation must be provided. ❑ Level Spreader What Type of SCM are you 0 Vegetated Conveyance (lower seasonal high water table- SHWT) providing? ❑ Wetland Swale (higher SHWT) (Check all that apply) ❑ Other SCM that removes minimum 30% nitrogen 0 Proposed project will not create concentrated stormwater flow through the buffer For a list of options to meet the diffuse flow requirements, click here. Attach diffuse flow documentation. 2. Stormwater Management Plan 2a. Is this an NCDOT project subject to compliance with NCDOT's Individual NPDES permit NCS000250? * El Yes El No 2b. Does this project meet the requirements for low density projects as defined in 15A NCAC 02H .1003(2)? * ❑ Yes 0 No To look up low density requirements, click here: http://reports.oah. state. nc.us/ncac/title%2015a%20-%20environmental%20guality/chapter%2002%20- %20environmental%20management/subchapter%20h/15a%20ncac%2002h%20.1003.pdf 2c. Does this project have a stormwater management plan (SMP) 0 Yes ElNo reviewed and approved under a state stormwater program or state - approved local government stormwater program? * ❑ n/a — project disturbs < 1 acre Note: Projects that have vested rights, exemptions, or grandfathering from state or locally implemented stormwater programs or projects that satisfy state or locally -implemented stormwater programs through use of community in -lieu programs should answer "no" to this question. 2d. Which of the following stormwater management program(s) apply? 0 Local Government (Check all that apply.)* 0 State If you have local government approval, please include the SMP on their overall impact map. Local Government Stormwater Programs * 0 Phase II ❑ USMP ❑ NSW ❑ Water Supply Page 15 of 20 PCN Form Version 4.3- April 20, 2022 Please identify which local government stormwater program you are using. Henderson County State Stormwater Programs * 0 Phase II ❑ HQW or ORW ❑ Coastal Counties ❑ Other Comments: Click to enter. Page 16 of 20 PCN Form Version 4.3- April 20, 2022 G. Supplementary Information 1. Environmental Documentation 1a. Does the project involve an expenditure of public (federal/state/local) ❑ Yes ❑x No funds or the use of public (federal/state) land? 1 b. If you answered "yes" to the above, does the project require preparation of an environmental document pursuant to the requirements of the National or State (North Carolina) Environmental El Yes El No Policy Act (NEPA/SEPA)? 1 c. If you answered "yes" to the above, has the document review been finalized by the State Clearing House? (If so, attach a copy of the ❑ Yes ❑ No NEPA or SEPA final approval letter.) Comments: Click to enter. 2. Violations (DWR Requirement) 2a. Is the site in violation of DWR Water Quality Certification Rules (15A NCAC 2H .0500), Isolated Wetland Rules (15A NCAC 2H .1300), Federally Non -Jurisdictional Wetlands /Classified Surface Waters ❑ Yes ❑x No (15A NCAC 2H. 1400) DWR Surface Water or Wetland Standards or Riparian Buffer Rules (15A NCAC 2B .0200)? 2b. If you answered "yes" to the above question, provide an explanation of the violation(s): AICK to enter. 3. Cumulative Impacts (DWR Requirement) 3a. Will this project (based on past and reasonably anticipated future impacts) result in additional development, which could impact nearby ❑ Yes ❑x No downstream water quality? 3b. If you answered "no", provide a short narrative description: 45 ft. Culvert extension to the Property line 3c. If yes, provide a qualitative or quantitative cumulative impact analysis in accordance with the most recent DWR policy. (Attach .pdf) 4. Sewage Disposal (DWR Requirement) 4a. Is sewage disposal required by DWR for this project? 1 ® Yes ❑ No ❑ N/A 4b. If yes, describe in detail the treatment methods and dispositions (non -discharge or discharge) of wastewater generated from the proposed project. If the wastewater will be treated at a treatment plant, list the capacity available at that plant. Public Metropolitan Sewage District Gravity Sewer Extension Page 17 of 20 PCN Form Version 4.3- April 20, 2022 5. Endangered Species and Designated Critical Habitat (Corps Requirement) 5a. Will this project occur in or near an area with federally protected ❑ Yes ❑x No species or habitat? (IPAC weblink: https://www.fws.gov/ipac/ ffws.govl) 5b. Have you checked with the USFWS concerning Endangered Species ❑ Yes ❑x No Act impacts? 5c. If yes, indicate the USFWS Field Office you have contacted. Choose one 5d. Is another federal agency involved? ® Yes ❑ No ❑ Unknown If yes, which federal agency? USACE 5e. Is this a DOT project located within Divisions 1-8? ❑ Yes ❑x No 5f. Will you cut any trees in order to conduct the work in waters of the U.S.? * ® Yes ❑ No 5g. Does this project involve bridge maintenance or removal? * ❑ Yes ❑x No 5g1. If yes, have you inspected the bridge for signs of bat use such as staining, guano, bats, etc.? Representative photos of signs of bat use ❑ Yes ❑ No can be found in the NLEB SLOPES, Appendix F, pages 3-7. Representative photos of signs of bat use can be found in the NLEB SLOPES, Appendix F, pages 3-7. Link to NLEB SLOPES document: http://saw-reg.usace.army.mil/NLEB/1-30-17-signed NLEB-SLOPES&apps.pdf If you answered yes to 5g1, did you discover any signs of bat use? * ❑ Yes ❑ No ❑ Unknown If yes, please show the location of the bridge on the permit drawings/ project plans 5h. Does this project involve the construction/ installation of a wind turbine(s)? ❑ Yes ❑x No If yes, please show the location of the wind turbine(s) on the permit drawings/ project plans (attach .pdf) 5i. Does this project involve blasting and /or other percussive activities that will be conducted by machines, such as jackhammers, ❑ Yes ❑x No mechanized pile drivers, etc.? If yes, please provide details to include type of percussive activity, purpose, duration, and specific location of this activity on the property (attach .pdf) 5j. What data sources did you use to determine whether your site would impact Endangered Species or Designated Critical Habitat? fws website Attach consultation documentation. 6. Essential Fish Habitat (Corps Requirement) 6a. Will this project occur in or near an area designated as an Essential Fish Habitat? ❑ Yes ❑x No Is there submerged aquatic vegetation (SAV) around the project vicinity? El Yes ❑x No El Unknown Will this project affect submerged aquatic vegetation? ❑ Yes ❑x No ❑ Unknown Page 18 of 20 PCN Form Version 4.3- April 20, 2022 Explain: Click to enter 6b. What data source(s) did you use to determine whether your site would impact Essential Fish Habitat? fws website 7. Historic or Prehistoric Cultural Resources (Corps Requirement) Link to the State Historic Preservation Office Historic Properties Map (does not include archaeological data): http://,qis.ncdcr.gov/hpoweb/ 7a. Will this project occur in or near an area that the state, federal or tribal governments have designated as having historic or cultural preservation status (e.g., National Historic Trust designation or ❑ Yes ❑x No properties significant in North Carolina history and archaeology)? 7b. What data source(s) did you use to determine whether your site would impact historic or archeological resources? Click to enter. 7c. Attach historic or prehistoric documentation. 8. Flood Zone Designation (Corps Requirement) Link to the FEMA Floodplain Maps: https://msc.fema.gov/portal/search 8a. Will this project occur in a FEMA-designated 100-year floodplain? ❑ Yes ❑x No 8b. If yes, explain how the project meets FEMA requirements. Click to enter. 8c. What source(s) did you use to make the floodplain determination? Henderson County and FEMA mapping H. Miscellaneous Comments: Click to ent— Attach pertinent documentation or attachments not previously requested Page 19 of 20 PCN Form Version 4.3- April 20, 2022 I. Signature * ❑x By checking the box and signing below, I, as the project proponent, certify to the following: • The project proponent hereby certifies that all information contained herein is true, accurate, and complete, to the best of my knowledge and belief; • The project proponent hereby requests that the certifying authority review and take action on this CWA 401 certification request within the applicable reasonable period of time; • The project proponent hereby agrees that submission of this PCN form is a "transaction" subject to Chapter 66, Article 40 of the NC General Statutes (the "Uniform Electronic Transactions Act"); • The project proponent hereby agrees to conduct this transaction by electronic means pursuant to Chapter 66, Article 40 of the NC General Statutes (the "Uniform Electronic Transactions Act"); • The project proponent hereby understands that an electronic signature has the same legal effect and can be enforced in the same way as a written signature; AND • As the project proponent, I intend to electronically sign and submit the PCN/online form. Full Name: Marty Kocot, PE Landworks Engineering, PLLC Signature: Marty Kocot Date: 11 /7/2022 Page 20 of 20 PCN Form Version 4.3- April 20, 2022 Permission for Agent and/or Attorney to act on behalf of Owner(s) Date: October 25, 2022 Henderson County site Development 240 Second Avenue East Hendersonville, NC 28792 Dear Henderson County Office : As you may know, I am acting as Agent / Attorney for Kompo Famil Company, LLC to apply for all permits pertaining to development and construction associated with property located at 3122 Hendersonville Road Fletcher, NC but more legally known at Property Identification Number (PIN) 9653-63-7344 documented at the Henderson County Courthouse Land Records Office located at 85 Grove Street, Hendersonville, NC 28792, I hereby give my / our permission to Long Shoals Partners, LLC to submit any plans or apply for permits required for this project, I / We are also giving permission for any land disturbing activity to take place on our property without our presence, but understand it is our ultimate responsibility if any damage is caused during construction to this property or any other property. Kompo Family Company, LLC Signed Land Owner of Record (Spell out exactly as on land records) I, 1� l(016, , a Notary Public for the State of ,�1 t�A , County of 4 /j�,�', )rj-J , do hereby certify that �'A" �i, i��dT�6'"G ? S personaii a eared before me this o7S" day of QGT" 202,aand acknowledge the due execution of the forgoing permission form. Witness my hand and official seal, JILL At EK COMM481on 05#dp Expire$ Jen"rY22,�9 Sanded TtV, tNot�y 2423 ins^L ( ) ( / Permission for Agent and/or Attorney to act on behalf of Owner(s) Date: October 25, 2022 Henderson County Site Development 240 Second Avenue East Hendersonville, NC 28792 Dear Henderson County Office : As you may know, I am acting as Agent / Attorney for Kompo Family Company, LLC to apply for all permits pertaining to development and construction associated with property located at 3122 Hendersonville Road, Fletcher, NC but more legally known at Property Identification Number (PIN) 9653-63-7344 documented at the Henderson County Courthouse Land Records Office located at 85 Grove Street, Hendersonville, NC 28792. Martin Kocot, PE I hereby give my / our permission to Landworks Engineering, PLLC to submit any plans or apply for permits required for this project. I / We are also giving permission for any land disturbing activity to take place on our property without our presence, but understand it is our ultimate responsibility if any damage is caused during construction to this property or any other property. Signed by prope Kompo Family Company, LLC Signed Land Owner of Record (Spell out exactly as on land records) .W -j---- f L /" �6di •Kam- a Notary Public for the State of r1-0 iZ 4 IM County of do hereby certify that jq11..`/ t�i'"t�['.s persona�lY aP�ear:d before me this a2 5— day of +`` C rQ aeQ 209 Pand acknowledge the due execution of the forgoing permission form. Witness my hand and official seal, 4ILLM. INERIIE * # G4mmis�doa # � 28 2i2S Aa QFFifl��s n n