Loading...
HomeMy WebLinkAboutNCG140418_Compliance Report_20230120ROY COOPER Governor ELIZABETH S. BISER .5erretary DOUGLAS R. ANSEL Interim Director Thomas Concrete of Carolina Inc. Attn; Justin Harley 507 old Montague Ln. Raleigh, North Carolina 27605 NORTH CAROLINA Environmental Quality January 20, 2023 Subject: COMPLIANCE EVALUATION INSPECTION Thomas Concrete of Carolina Inc. knightdale Facility, Certificate of Coverage-NCG140418 NPDES Stormwater General Permit-NCG140000 Wake County Mr. Hartley: On January 19, 2023 a site inspection was conducted for the Thomas Concrete of Carolina, Inc. facility located at the 507 Old Montague Ln_, Wake County, North Carolina. A copy of the Compliance Inspection Report is enclosed for your review. The site visit and file review revealed that the subject facility is covered by NPDES Stormwater General Permit-NCG140000, Certificate of Coverage-NCG140418. Permit coverage authorizes the discharge of stormwater from the facility to receiving waters designated as Milburnie Creek, a Class C;NSW waterbody in the Neuse River Basin. As a result of the inspection, the facility was found to be not in compliance with the conditions of the NCG140000 permit. Please refer to the enclosed Compliance Inspection Report for additional comments and observations made during the inspection. Please be advised that violations of the NPDES Stormwater General Permit are subject to a civil penalty assessment of up to $25,000 per day for each violation. If you or your staff has any questions, comments, or needs assistance with understanding any aspect of your permit, please contact me at (919) 791-4200 or by e-mail at Thad.vaientineamcdenr.gov. Sincerely, Thad Valentine Environmental Senior Specialist �:i� North Cdrolina Departmem of Environmental Quality ? Division of Energy. Mineral and Land Resources D___ Raleigh Regional Office .1628 tail Service Center 13800 Barrett Drive I Raleigh. North Carolina 27609 C. XA Inn ww"w*IE-*WWWWft" doo�' 919.791.4200 North Carolina Department of Environmental Quality I Division of Energy. Mineral and Land Resources Raleigh Regional Office 1628 Mail Service Center 13800 Barrett Drive I Raleigh, North Carolina 27609 n�ai rv'r r:. 6w�mrwdum� �` 919.791.4200 Compliance Inspection Report Permit: NCG140418 Effective: 07/01/22 Expiration: 06/30/27 Owner: Thomas Concrete of Carolina Inc SOC: Effective: Expiration: Facility: Knightdale Batch Plant County: Wake 507 Old Montague Ln Region: Raleigh Knightdale NC 27545 Contact Person: Justin Hartley Title: Phone: 919-832-0451 Directions to Facility: System Classifications: SWNC, Primary ORC: Secondary ORC(s): On -Site Representative(s): Related Permits: Inspection Date: 01/1912023 Entry Time 09:30AM Primary Inspector: Thaddeus W Valentine Secondary Inspector(s): Certification: Phone: Exit Time: 11:40AM Phone: Reason for Inspection: Routine Inspection Type: Compliance Evaluation Permit Inspection Type: Ready Mix Concrete Stormwater/Wastewater Discharge COC Facility Status: ❑ Compliant Not Compliant Question Areas: Storm Water (See attachment summary) Page 1 of 3 Permit: NCG140418 Owner - Facility: Thomas Concrete of Caro ina Inc Inspection Date: 01/19/2023 Inspection Type : Compliance Evaluation Reason for Visit: Rout ne Inspection Summary: In order to maintain the stormwater pollution prevention plan (SP3)it is important to update the plan annually. The plan appears to have only been updated in 2018 and again in 2022. Be sure to update the spill log at least yearly if there are no spills by noting no spills for the year. Train all personnel and the actions to take if there is a spill at the facility. Also be sure that personnel responsible for spill response are aware of what quantity is reportable to DEQ. There is a low area on the SW side of the facility that drains stormwater. The inspection report from 2015 noted the low area and equested that a berm or other means be taken to raise that area. Raise the grade in that area or designate that as an outfall area and request a permit update for your permit to include analytical sampling. The material drying area along the West side of the facility has a section of the retaining wall missing on the South side that is discharging stormwater that needs to be replaced. Replace that section of the wall or include that area as an outfall area and begin to sample that outfall The preventive maintenance and good housekeeping section of the SP3 does not cover all the major pollution sources on site and should be updated. The conex trailer stores drums of chemicals or oils and was open at the time of the inspection. That storage container should remain closed when not in use and it should be included in the semiannual site inspection. The fuel despenser beside the diesel AST should be included in the preventive maintenance and good housekeeping portion of the SP3 as a major pollution source. That area should also be included in the semiannual site inspection report to be inspected at least semiannually. Please make the changes to the plan to insure compliance with the permit Page 2 of 3 Permit: NCG140418 Owner - Facility: Thomas Concrete of Carolina Inc Inspection Date: 01/19/2023 Inspection Type : Compliance Evaluation Reason for Visit: Rout-ne Stormwater Pollution Prevention Plan Yes No NA NE Does the site have a Stormwater Pollution Prevention Plan? 0 ❑ ❑ ❑ # Does the Plan include a General Location (USGS) map? 0 ❑ ❑ ❑ # Does the Plan include a "Narrative Description of Practices"? 0 ❑ ❑ ❑ # Does the Plan include a detailed site map including outfall locations and drainage areas? 0 ❑ ❑ ❑ # Does the Plan include a list of significant spills occurring during the past 3 years? ❑ 0 ❑ ❑ # Has the facility evaluated feasible alternatives to current practices? N ❑ ❑ ❑ # Does the facility provide all necessary secondary containment? 0 ❑ ❑ ❑ # Does the Plan include a BMP summary? N ❑ ❑ ❑ # Does the Plan include a Spill Prevention and Response Plan (SPRP)? 0 ❑ ❑ ❑ # Does the Plan include a Preventative Maintenance and Good Housekeeping Plan? N ❑ ❑ ❑ # Does the facility provide and document Employee Training? ❑ N ❑ ❑ # Does the Plan include a list of Responsible Party(s)? M ❑ ❑ ❑ # Is the Plan reviewed and updated annually? E ❑ ❑ ❑ # Does the Plan include a Stormwater Facility Inspection Program? E ❑ ❑ ❑ Has the Stormwater Pollution Prevention Plan been implemented? 0 ❑ ❑ ❑ Comment: Records were available but updates are needed in some areas and parts of the plan need additional information Qualitative Monitoring Yes No NA NE Has the facility conducted its Qualitative Monitoring? N ❑ ❑ ❑ Comment: provided Permit and Outfalls Yes No NA NE # Is a copy of the Permit and the Certificate of Coverage available at the site? 0000 # Were all outfalls observed during the inspection? 0000 # If the facility has representative outfall status, is it properly documented by the Division? 0000 # Has the facility evaluated all illicit (non stormwater) discharges? ❑ 110 ❑ Comment: Page 3 of 3