HomeMy WebLinkAbout20150200 Ver 1_CAMA Application_20150219NCDENR North Carolina Department of Environment and Natural Resources Pat McCrory Governor February 12, 2015 MEMORANDUM: TO: FROM: SUBJECT: Applicant: Donald R. van der Vaart Secretary 201 50200 Karen Higgins Division of Water Resources Daniel Govoni Major Permits Processing Coordinator CAMA/DREDGE & FILL Permit Application Re Clyde B. Case III Project Location: Carteret County, at 233 Deep Bay Drive, along the Bogue Sound, in Newport. Proposed Project: Proposes a pier extension to a private residential pier, platform, boatlifts, slip addition and jet -ski lift to an existing 1 -slip docking facility. Please indicate below your agency's position or viewpoint on the proposed project and return this form by March 4, 2015 If you have any questions regarding the proposed project, please contact Heather Styron, Permit officer at (252) 808 -2808. Ext. 216. When appropriate, in -depth comments with supporting data is requested. REPLY: This agency has no objection to the project as proposed This agency has no comment on the proposed project. This agency approves of the project only if the recommended changes are incorporated. See attached. This agency objects to the project for reasons described in the attached comments SIGNED DATE _ 400 Commerce Avenue, Morehead City, North Carolina 28557 Phone 252- 808 -28081 FAX 252 -247 -33301 Internet, www nccoastaimanagement net An Equal Opportunity / Affirmative Action Employer DIVISION OF COASTAL MANAGEMENT FIELID INVESTIGATION REPORT 1. APPLICANT'S NAME Clyde B. Case III 2. LOCATION OF PROJECT SITE. 233 Deep Bay Drive along Bogue Sound, in Newport, Carteret County. Photo Index - 2006: 41 -5046 grids I &J (22) 2000: 41 -517 grids P &Q (22) State Plane Coordinates - X: 2634650 Y: 362158 Longitude: 34 °43'35.51 Latitude: 76 °53'15.56 3. INVESTIGATION TYPE: CAMA 4. INVESTIGATIVE PROCEDURE: Dates of Site Visit — 2/4/15 Was Applicant Present — No Photos Taken — Yes 5. PROCESSING PROCEDURE: Application Received - Officially Submitted 1/21/15 Complete — 1/21/15 Office - MHC 6 SITE (DESCRIPTION: (A) Local Land Use Plan — Carteret County- Certified 12/22/2010 Land Classification from LUP — Limited Transition/Conservation (B) AEC(s) Involved- EW, PTA (C) Water Dependent: Yes (D) Intended Use Private (E) Wastewater Treatment. Existing — Onsite Septic System Planned - None (F) Type of Structures Existing — House, driveway, pool, keystone retaining wall Planned- pier extension, boatlifts, het -ski lift, platform (G) Estimated Annual Rate of Erosion N/A Source — N/A 7. HABITAT DESCRIPTION. DREDGED FILLED OTHER (A) Open water (over SAV) N/A N/A 2,620ft2 Shaded 2,620ft2 Inc. (D) Total Area Disturbed- 2,620 ft2 (E) Primary Nursery Area: No (F) Water Classification: HQW /SA Open Yes 8. Project Summary. The proposed project is for a pier extension to an existing private residential pier, platform, boatlifts, slip addition and jet -ski lift to an existing 1 -slip docking facility along Bogue Sound Field Investigation Report Clyde B Case III 233 Deep Bay Drive Page 2 of 4 9 Narrative Description The Clyde Case project is located at 233 Deep Bay Drive within Newport, Carteret County. The site is found by following highway 24 east past the Gales Creek Bridge. It is approximately 3,623' ( 69 miles) east of the Gales Creek Bridge. You will turn south onto the entrance road of Deep Bay subdivision (Deep Bay Drive), which is the next road east of the Ted and Jewel Ivey property. The Ivey Property is distinguished by a black rod iron type fence with stone columns. Turn right onto Deep Bay Drive once you pass this area (stone columns for the Ivey Property) The Case property is located at the end of Deep Bay Drive and along the North Side of Bogue Sound. The residential property is .522 acres (22738.32sf) in its entirety and 10' above nhw. Bogue Sound runs along the south side of the property. The upland vegetation mainly consists of lawn grasses, shrubs, and oak trees. There is a 45' x 125'section (total combined wetland area) of 404 jurisdictional transitional wetlands and coastal wetlands along the 125' of shoreline on Bogue Sound which consists of Spartina alternaflora (smooth cordgrass), Spartma patens (salt meadow cordgrass and Juncus romerianus (black needlerush). The waters of Bogue Sound have approximately 2.5'lunar tidal amplitude. The Division of Water Quality classifies this area as HQW /SA Waters. This area of Bogue Sound is not designated as a Primary Nursery Area and is open to the taking of shellfish. The Carteret County Land Use Plan classifies this area as Limited Transition with Conservation within the AECs. Although the ICW is located approximately 1,402' from the proposed pier there is a historic navigation channel north of the ICW that is utilized within this area This channel would be located approximately 483' south from the proposed development. Water depths within this project location are -2 O'nlw /mlw with connecting water depths of -2 7' plus nlw /mlw. The bottom substrate is sand. Bogue Sound is approximately 11,545' wide at this location. 10) Proposed Development: The applicant wishes to add a pier extension, relocate an existing boatlift, add abet -ski lift, add a new slip area with boatlift and a covered platform to the existing 1 -slip private residential docking facility in order to avoid SAV habitat and obtain deeper water. The water depths over SAV habitat and a sandy shoaled SAV area < -1' nlw /mlw. The applicant is proposing to construct a 4 5' x 404' pier (from the edge of marsh), a 16' x 29' partially covered (18' x 20' covered area) platform, two boatlifts (includes relocated boatlift) and a 5' x 8' single pole swing het -ski lift stored over the platform. The distance of all portions of the proposed docking facility would be a maximum of 578' from the waterward edge of marsh. In order to achieve the necessary depths to extend beyond the shallow bottom SAV habitat, the pier would need to exceed 400' from the waterward edge of marsh Field observations by DCM staff verified that the water depths from 400' to 578' would maintain the required rate of l' of fall and would reach deeper water depths Field Investigation Report Clyde B. Case III 233 Deep Bay Drive Page 3 of 4 (> 2' nlw) over SAV habitat. The pier would continue south over SAV habitat and open water for 404'. Due to SAV habitat and shallow water depths within this area, the applicants are proposing a height of 6.5' above the SAV substrate and a pilings span of 10' wide within the SAV area. The SAV habitat appears to end approximately 560' from the waterward edge of marsh The pier would intersect a 16' x 29' T -head platform (which includes an 18' x 20' roofed area). There would be a 5' x 8' single -pole swinging het -ski lift located along the east side of the proposed platform. The het -ski lift would be stored over the proposed platform when not in use. There would also be two 13' x 13' boatlifts located on the east and west side of the proposed platform. This includes the relocated boatlift from the existing pier. The most waterward portion of the boatlifts and platform would not exceed a maximum distance of 577' from the waterward edge of marsh. All parts of the docking facility would be landward of the historical channel (approximately 483' landward) and a distance of 24' from the western riparian access line and 25' from the eastern riparian access line There would be a total of two slips (one existing and one new). The water depths within the proposed slip areas are an average of -2.0' nlw /mlw with connecting water depths of -2.9' plus nlw /mlw The pier to the west along the same shoreline is approximately 2000' away and extends into Bogue Sound approximately 577' The adjacent neighbor to the west (Ivey) was also permitted for a docking facility that extended a total length of 470' from the waterward edge of marsh. The longest pier to the east is approximately 1,430' away and extends a maximum of 420' into Bogue Sound. The proposed docking facility (577' from the waterward edge of marsh) would not exceed the existing pier head length to the west and would not encroach within any traditional navigation routes within the area. The applicants proposed to extend a maximum of 591' from the edge of marsh, however, the SAV shoal within the applicant's riparian area ends approximately 560' and the water depths at 577' are -2' nlw /mlw or greater, therefore the additional 14' proposed by the applicant would not be necessary. This would also allow the proposed pier to remain within the existing pier head length to the west. 11 Anticipated Impacts: The proposed dock extension (includes platforms and boatlifts) would shade and incorporate 2,620ft2 of shallow- bottom SAV habitat The development would provide a total of two slips The placement of the het -ski lift would not be considered a permanent slip because it would be stored over the platform when not in use. The proposed placement of the pier, platform and boatlifts would reduce incidental prop scarring and prop dredging of the existing SAV habitat, because of the deeper water depths ( >2' nlw) within the proposed pier location and the shorter distance that the applicants would need to traverse in order to reach the deeper water This proposal as designed has the potential to help preserve SAV habitat and shoal area closer inland. The increase in suspended sediment and turbidity levels from the pier placement would be temporary, and occur while the pier Field Investigation Report Clyde B. Case III 233 Deep Bay Drive Page 4 of 4 placement is taking place. Turbidity should be minimal given the sandy bottom composition and open water. The location of the proposed docking facility should not be a hindrance to navigation as the proposed development would be located approximately 483' landward (north) of the historic navigation channel and would remain within the established pier head length to the west. There would be a total of 2 slips once the project is completed. Name: Heather M. Styron Date: 2/11/15 Office: Morehead City h ? , Kathy B. Vinson, AIC P Comprehensive Land Use Planning and Development Assistance P.O. Box 827 Morehead City, NC 28557 January 21, 2015 Ms. Heather Styron NC Division of Coastal Management 400 Commerce Avenue Morehead City, NC 28557 Re: Mayor Permit Application Clyde B Case, III 233 Deep Bay Drive Newport, North Carolina Dear Heather. Office 252.354.4916 Fax 252.247.5875 Enclosed are the major CAMA permit application and one copy of project plans prepared on behalf of Clyde Case for improvements to his property located at 233 Deep Bay Drive, Newport, North Carolina Mr. Case proposes to extend an existing pier, relocate an existing boatlift, and install an additional boatlift and single -pole jet -ski lift. Mr Case's check #2521 in the amount of $250.00 for the permit application fee is also enclosed. The adjacent riparian neighbors have been notified of the project plans by certified mail. Green card return receipts will be submitted to you as soon as they are returned by the Post Office. I will provide the additional required large- format copies once your review is complete. Thank you for your assistance with this project Please call me at 252- 240 -9297 if you have questions or need additional information. I look forward to working with you on this project Sincerely, Kathy B. mson, AICP Enclosures h II- ", � , yj" -,' 4 "4'l rs ad y 233 Deep ay "!'JC' January 21, 2015 Prepared by: Coastal Planning Services, Inc. P.O. Box 827 Morehead City, north Carolina 28557 Telephone 252 -240 -9297 v .�v „ rqr � Clyde B. "Casey" Case, 111 Major CAMA permit Application January 21, 2015 Contents Application Documents DCM MP —1 Application DCM MP —4 Structures Project Narrative Introduction Site Description Project Description Construction Methods Authorized Agent Letter Property Deed Notification to Adjacent Riparian Property Owners Project Plans Sheet 1 of 2 Sheet 2 of 2 (supplement) P - E''/r_ (last revised 12/27/06) �, North Carolina DIVISION OF COASTAL MANAGEMENT 9. Primary Applicant/ Landowner Information Business Name Business Name Project Name (if applicable) Coastal Planning Services, Inc N/A N/A Agent/ Contractor 1 First Name MI Applicant 1 First Name MI Last Name Vinson Agent/ Contractor 2 First Name Clyde B Case, III Applicant 2 First Name MI Last Name City State N/A 827 Morehead City NC If additional applicants, please attach an additional page(s) with names listed Phone No 1 Mailing Address PO Box City State 252 US Hwy 70 West N/A Havelock Contractor # NC ZIP Country Phone No Street Address (if different from above) FAX No 28532 USA 252 - 259 - 1098 ext N/A N/A - - Street Address (if different from above) City State ZIP 233 Deep Bay Drive Newport NC 28570 - Email Casey @themilitaryclub com 2. Agent/Contractor Information Business Name Coastal Planning Services, Inc Agent/ Contractor 1 First Name MI Last Name Kathy B Vinson Agent/ Contractor 2 First Name MI Last Name N/A Mailing Address PO Box City State 827 Morehead City NC ZIP Phone No 1 Phone No 2 28557 252 - 240 - 9297 ext N/A 252 - 354 - 4916 ext N/A FAX No Contractor # 252 247 5875 N/A Street Address (if different from above) City State ZIP N/A - Email kbvinson @ec rr corn <Form continues on back> a _t. 252-808-2808 ,. 888- 41RC0A T Form DCM MP -1 (Page 2 of 5) APPLICATION for Major Development Permit 3. Project Location County (can be multiple) Street Address State Rd # Carteret 233 Deep Bay Drive N/A Subdivision Name City State Zip Deep Bay Newport NC 28570- Phone No Lot No (s) (if many, attach additional page with list) 252 - 259 -1098 ext N/A 2, a In which NC river basin is the project located b Name of body of water nearest to proposed project White Oak Bogue Sound c Is the water body identified in (b) above, natural or manmade? d Name the closest major water body to the proposed project site ®Natural ❑Manmade ❑Unknown Bogue Sound e Is proposed work within city limits or planning jurisdiction? f If applicable, list the planning jurisdiction or city limit the proposed ❑Yes ®No work falls within Carteret County 4. Site Description a Total length of shoreline on the tract (ft ) b Size of entire tract (sq ft ) 125 22,738 32 c Size of individual lot(s) d Approximate elevation of tract above NHW (normal high water) or 22,738 32, 1 1 NWL (normal water level) (If many lot sizes, please attach additional page with a list) +/- 10 feet ®NHW or ❑NWL e Vegetation on tract Trees, grass, landscape vegetation, coastal wetlands, 404 wetlands f Man -made features and uses now on tract Single -family residence, residential swimming pool, retaining wall, dock with boatlift g Identify and describe the existing land uses adjacent to the proposed project site Residential h How does local government zone the tract? i Is the proposed project consistent with the applicable zoning? R -20 (Attach zoning compliance certificate, if applicable) ®Yes ❑No ❑NA j Is the proposed activity part of an urban waterfront redevelopment proposal? ❑Yes ®No k Hasa professional archaeological assessment been done for the tract? If yes, attach a copy ❑Yes ®No ❑NA If yes, by whom? N/A I Is the proposed project located in a National Registered Historic District or does it involve a ❑Yes ®No ❑NA National Register listed or eligible property? iC.ar. ia.e.4:n�esc nn mnwf mannl m (i) Are there wetlands on the (n) Are there coastal wetlands on the site? (m) If yes to either (i) or (n) above, has a delineation been conducted? (Attach documentation, if available) ®Yes ❑No ®Yes []No ®Yes ❑No ­1 Form DCM MP -1 (Page 3 of 5) n Describe existing wastewater treatment facilities Individual septic system o Describe existing drinking water supply source West Carteret Water Corporation p Describe existing storm water management or treatment systems None APPLICATION for Mayor Development Permit 5. Activities and Impacts a Will the project be for commercial, public, or private use? ❑Commercial ❑Public/Government ®Private /Community b Give a brief description of purpose, use, and daily operations of the project when complete The docking facility will provide water /boating access for owners of the property and their guests c Describe the proposed construction methodology, types of construction equipment to be used during construction, the number of each type of equipment and where it is to be stored One barge with pile- driving equipment will be used for construction of the dock It will be stored in deep water d List all development activities you propose Pier extension with platform, single -pole let ski lift, and a total of two boat lifts (one new, another to be relocated from existing platform), e Are the proposed activities maintenance of an existing project, new work, or both? New f What is the approximate total disturbed land area resulting from the proposed project? none ❑Sq Ft or ❑Acres g Will the proposed project encroach on any public easement, public accessway or other area ®Yes ❑No ❑NA that the public has established use of? h Describe location and type of existing and proposed discharges to waters of the state Sheet flow runoff to Bogue Sound i Will wastewater or stormwater be discharged into a wetland? ❑Yes ®No ❑NA If yes, will this discharged water be of the same salinity as the receiving water? []Yes ❑No [DNA j Is there any mitigation proposed? ❑Yes ®No ❑NA If yes, attach a mitigation proposal <Form continues on back> 6. Additional Information In addition to this completed application form, (MP -1) the following items below, if applicable, must be submitted in order for the application package to be complete Items (a) — (f) are always applicable to any major development application Please consult the application instruction booklet on how to properly prepare the required items below a A project narrative b An accurate, dated work plat (including plan view and cross - sectional drawings) drawn to scale Please give the present status of the proposed project Is any portion already complete? If previously authorized work, clearly indicate on maps, plats, drawings to distinguish between work completed and proposed c A site or location map that is sufficiently detailed to guide agency personnel unfamiliar with the area to the site 252 -808 -2808 ,. 1- 88S- 4RCOAS3 _, e9a4r�v -sir casti�aa�ar� �as�e W.s�e: Form DCM MP -1 (Page 4 of 5) APPLICATION for Major Development Permit d A copy of the deed (with state application only) or other instrument under which the applicant claims title to the affected properties e The appropriate application fee Check or money order made payable to DENR f A list of the names and complete addresses of the adjacent waterfront (riparian) landowners and signed return receipts as proof that such owners have received a copy of the application and plats by certified mad Such landowners must be advised that they have 30 days in which to submit comments on the proposed project to the Division of Coastal Management Name Elmer T Sprinkle, III Phone No 252 -499 -9089 Address 243 Deep Bay Drive, Newport, NC 28570 Name Bruce J Downey, Jr Phone No Address 206 East Seagull Way, Hubert, nc 28539 Name Phone No Address g A list of previous state or federal permits issued for work on the project tract Include permit numbers, permittee, and issuing dates None known h Signed consultant or agent authorization form, if applicable i Wetland delineation, if necessary I A signed AEC hazard notice for projects in oceanfront and inlet areas (Must be signed by property owner) k A statement of compliance with the N C Environmental Policy Act (N C G S 113A 1 -10), if necessary If the project involves expenditure of public funds or use of public lands, attach a statement documenting compliance with the North Carolina Environmental Policy Act 7. Certification and Permission to Enter on Land I understand that any permit issued in response to this application will allow only the development described in the application The project will be subject to the conditions and restrictions contained in the permit I certify that I am authorized to grant, and do in fact grant permission to representatives of state and federal review agencies to enter on the aforementioned lands in connection with evaluating information related to this permit application and follow -up monitoring of the project I further certify that the information provided in this application is truthful to the best of my knowledge Date _January 21, 2015 Print Name Kathy B Vinson, Agent Signature 'PIN, Please Indicate application attachments pertaining to your proposed project ❑DCM MP -2 Excavation and Fill Information ❑DCM MP -5 Bridges and Culverts ❑DCM MP -3 Upland Development ®DCM MP -4 Structures Information a �S�S SPJ 1 -838 4RCOAST rn,- ,r, cas,�,_-lxn a r.ag err, ent.n ��I Form DCM MP-1 (Page 5 of 5) APPLICATION for, Major Development Permit 252 - 806 -2808 . I - 8 8 RE - 4 R C 0 -4 S T - . -Ty 1w vv = r c c c a la t F J rn a pra n g a rn -- n t . n e t TX- i M, 4w C r r' , r- - 11i �S WTI �1 did (Construction ioen w1tthi n llaubUlle Trust Areas) Attach this form to Joint Application for CAMA Major Permit, Form DCM MP -1 Be sure to complete all other sections of the Joint Application that relate to this proposed project. Please include all supplemental information '. DOCKING FACILITYIMARINA CHARACTERISTICS ❑This section not applicable a (i) Is the docking facilely /manna b (i) Will the facility be open to the general public? ❑Commercial ❑Public/Government ®Private /Community ❑Yes ®No c (i) Dock(s) and /or pier(s) d (i) Are Finger Piers included? ❑Yes ®No (ii) Number one If yes (ni) Length 404' (extension) (u) Number (iv) Width 4 5' (extension) (iii) Length (v) Floating []Yes ®No (iv) Width (v) Floating ❑Yes [--]No e (i) Are Platforms included? ®Yes ❑No f (i) Are Boatlifts included? ®Yes ❑No If yes If yes (ii) Number one new platform (ii) Number two (one existing to be relocated and one (iii) Length 16' additional boatlift), plus one single -pole )et ski lift (iv) Width 29' (iii) Length 13' (v) Floating ❑Yes ®No (iv) Width 13' Note Roofed areas are calculated from dnpbne dimensions Jet ski lift measures 5'x 8' g (i) Number of slips proposed h Check all the types of services to be provided 1 new slip, for a total of 2 slips ❑ Full service, including travel lift and /or rail, repair or (it) Number of slips existing maintenance service ❑ Dockage, fuel, and marine supplies 1 ® Dockage ( "wet slips ") only, number of slips 2 ❑ Dry storage, number of boats ❑ Boat ramp(s), number of boat ramps ❑ Other, please describe i Check the proposed type of siting I Describe the typical boats to be served (e g , open runabout, ❑ Land cut and access channel charter boats, sad boats, mixed types) []open water, dredging for basin and /or channel open runabout ®Open water, no dredging required []Other, please describe k Typical boat length 23' - 25' 1 (1) Will the facility be open to the general public? ''EC VF-L) m (i) Will the facility have tie pilings [--]Yes ®No AM ❑Yes ®No (n) If yes number of tie pilings N/A 2, DOCKING FACILITY /MARINA OPERATIONS [:1 This section not applicable 252 - 803 -2308 oa 1- 836,RCOAST feWsad. 12/27106 FOR-M, MR P_4 ( r��� ��� a� Paige 2 ott 4) a Check each of the following sanitary facilities that will be included in the proposed project Office Toilets IC y �✓❑I Toilets for patrons, Number , Location ❑ Showers ❑ Boatholding tank pumpout, Give type and location b Describe treatment type and disposal location for all sanitary wastewater None C Describe the disposal of solid waste, fish offal and trash Waste receptacles located on high ground d How will overboard discharge of sewage from boats be controlled? None e (i) Give the location and number of "No Sewage Discharge" signs proposed None (u) Give the location and number of " Pumpout Available" signs proposed None f Describe the special design, if applicable, for containing industrial type pollutants, such as paint, sandblasting waste and petroleum products N/A g Where will residue from vessel maintenance be disposed of? N/A h Give the number of channel markers and "No Wake" signs proposed None i Give the location of fuel - handling facilities, and describe the safety measures planned to protect area water quality None j What will be the marina policy on overnight and live- aboard dockage? N/A k Describe design measures that promote boat basin flushing? N/A I If this project is an expansion of an existing marina, what types of services are currently provided? Not an existing marina E-!VID m Is the marina/docking facility proposed within a primary or secondary nursery area? ❑Yes ®No a :IS5 n Is the marina /docking facility proposed within or adjacent to any shellfish harvesting areas �.� ;vlu�, ; t_Y, ❑Yes ®No o Is the marina/docking facility proposed within or adjacent to coastal wetlands /marsh (CW), submerged aquatic vegetation (SAV), shell bottom (SB), or other wetlands (WL)? If any boxes are checked, provide the number of square feet affected ®CW none for new section, approx 64 sf shaded for exlstmq pier section ®SAV _approximately 464 sf shaded for new pier section, approx 1,033 sf shaded for existing section ❑SB [OWL none for new section, approx 31 sf shaded for existing pier section ❑None 252 -808 -28618 sa 1- 8884RCOAS-T 9evised. 12127106 F�Irnn Dchl cif` P -fit (st'rucAmess, paqe 3 of ) p Is the proposed marina /docking facility located within or within close proximity to any shellfish leases? []Yes ®No If yes, give the name and address of the leaseholder(s), and give the proximity to the lease N/A 3. BOATHOUSE (including covered lifts) ® This section not applicable a (i) Is the boathouse structure(s) ❑Commercial ❑Public/Government ❑Private /Community (u) Number (in) Length (iv) Width Note. Roofed areas are calculated from dnphne dimensions 4. GROIN (e.g, wood, sheetprle, etc If a rock groin, use MP -2, Excavation and Fill) ®This section not applicable a (r) Number (n) Length (m) Width �5. BREAKWATER (e g, wood, sheetpile, etc) E] This section not applicable a Length b Average distance from NHW, NWL, or wetlands c Maximum distance beyond NHW, NWL or wetlands 6. MOORING PILINGS and BUOYS ®This section not applicable a Is the structure(s) b Number ❑Commercial ❑Public/Government ❑Pnvate /Community c Distance to be placed beyond shoreline d Description of buoy (color, inscription, size, anchor, etc) Note This should be measured from marsh edge, if present e Arc of the swing 7. GENERAL a Proximity of structure(s) to adjacent riparian property lines b Proximity of structure(s) to adjacent docking facilities 24' to the west, 25' to the east 237' to the west, 239' to the east Note For buoy or mooring piling, use arc of swing including length of vessel c Width of water body d Water depth at waterward end of structure at NLW or NWL +/- 13,000 feet -2 0 NLW /MLW e (r) Will navigational aids be required as a result of the project? ❑Yes ®No ❑NA (n) If yes, explain what type and how they will be implemented N/A 6. OTHER ®This section not applicable 25P-8138-2808 r, , TeAlsed'e 12/27/0+ a Give complete description January 21, 2015 Date Project Name Clyde B Case, III Applicant Name % Appl cant Sign ure 252 -808 -2808 ee 1- 888- 4RCOAS"t revised: 12/27/06 Clyde B. Case, III Carteret County Project Narrative Introduction Clyde Case is the owner of a single - family residential property located adjacent Bogue Sound at 233 Deep Bay Drive in Carteret County. He proposes to extend an existing pier located at his home and construct an additional platform at the waterward end of the extension. He also proposes to relocate an existing boatlift to the new platform, install an additional boatlift (for a total of two boatlifts), and install a single -pole jet -ski lift. Site Description The project site is Lot Number 2 of the Deep Bay Subdivision. The subdivision is located on Highway 24 in western Carteret County, just east of the intersection with Hibbs Road. The project site includes a single- family residence and swimming pool, with landscaping consisting of trees, grass, and shrubs. The shoreline along Bogue Sound measures 125 linear feet along Normal High Water (NHW) and is bordered by a fringe of coastal wetlands measuring approximately 20' to 30' in width. A narrow area of 404 wetlands 10' to 20' in width adjoins the coastal wetlands. An existing retaining wall is located just landward of the 404 wetlands NHW and coastal wetland lines were recently delineated by staff of the Division of Coastal Management and are depicted on project plans, as surveyed by Charles A. Rawls and Associates, PA. Federal (404) wetlands on the site are also shown on project plans. Submerged aquatic vegetation (SAVs) is observed in shallow waters adjacent the shoreline. Deep water ( -2' NLW /MLW or greater) is found approximately 570' offshore measuring from the waterward edge of coastal wetlands. An historic channel used by local residents to access deep water is visible on aerial photos of the area. The location and orientation of the historic channel were used to determine the riparian corridor for the Case project site and adjacent properties. The Atlantic Intracoastal Waterway (ICW) is located approximately 880' beyond the edge of the deep water historic channel. Clyde B. Case, III Major CAMA Permit Application January 21, 2015 J+ ` Page 1 The waters of Bogue Sound at the project site are classified as SA HQW by the Environmental Management Commission and are open to the harvesting of shellfish. Bogue Sound is approximately 13,000 feet wide at this location. There are no known shellfish leases adjacent to or within close proximity of the project. Single- family residential lots are located adjacent the Case property. Elmer "Skip" and Allyson Sprinkle own the parcel to the west. The lot to the east is owned by Bruce Downey. Both adjacent parcels are developed and contain single - family residences. The Sprinkles have submitted a major CAMA permit application for improvements to their property, including construction of a two -slip pier and a retaining wall with fill. There is no pier located on the Downey property. The project area is within the Carteret County planning jurisdiction and is zoned R -20 Residences in the project area are served by individual septic systems, with drinking water provided by West Carteret Water Corporation. Project Description Mr Case proposes to build an extension an existing pier located at his property with a new platform at the waterward end of the extension. He also plans to relocate an existing boat lift to the new platform and install an additional boat lift and single -pole jet -ski lift. The existing pier extends 190' from the top of the existing retaining wall. The existing pier measures 155' from the waterward edge of the coastal wetlands, and terminates with a fixed platform measuring 16' x 25'. A boat lift is currently located adjacent the existing platform. The owner proposes to extend the pier an additional 404', measured from the existing platform. A new platform measuring 16' x 29' is proposed for location at the waterward end of the pier extension. The finished pier will extend 590' into Bogue Sound, measured from the waterward edge of coastal wetlands. The proposed width of the new portion of the pier is 4.5', with minimum water depths of -2.0' NLW /MLW at the waterward end A partially roofed t -head platform measuring 16' x 29' will be located at the waterward end of the dock. The dimensions of the platform roof are 18' x 20'. < C1,1VcU - -, -,N '51 i JwI "Ir, r "-,v Clyde B Case, III Major CAMA Permit Application January 21, 2015 Page 2 An existing 13'x 13' boatlift located at the current platform will be relocated to the waterward end of the dock. An additional 13'x 13' boatlift will also be installed at the new platform. A single -pole jet- ski lift measuring 5' x 8' is proposed for storing a personal watercraft over the platform. This area of Bogue Sound is characterized by shallow water, shoals, and SAVs, while pier length has traditionally been controlled by the length of existing piers that typically end in less than -2' NLW /MLW. By constructing longer piers, boat traffic through shallow shoal /SAV areas is avoided, thus minimizing or avoiding impacts to SAVs. A major permit ( #20 -14) was issued in 2014 to neighbors Ted and Jewel Ivey for construction of a pier extending to -2' NLW /MLW. (The Ivey property is located two lots west of the Case project.) The recently permitted Ivey pier exceeds the previous pier head line along this shoreline, yet avoids boat traffic through SAVs. Consistent with the permitted Ivey pier, the proposed Case pier is located at the point requiring the shortest distance along his shoreline to reach -2' NLW /MHW. The proposed Case pier will terminate beyond SAVs, as shown on project plans. The length and location of the proposed Case pier is consistent with the general navigational route for boats using this area of Bogue Sound. It does not extend significantly beyond the recently permitted Ivey pier nor the proposed Sprinkle pier (directly adjacent the Case project). Compared to the old pier head line, the proposed pier lengths reduce impacts to resources while allowing boating access to highground property. The proposed Case pier extends approximately 97 feet waterward of the permitted Ivey pier. It is approximately 55 feet waterward of the proposed Sprinkle pier. The proposed Case pier extends farther than the recently permitted and proposed piers to reach -2.0' NLW /MLW; however, note should be made that the edge of the Intracoastal Waterway measured from the Case site is about 17' farther from the historical channel than the proposed Sprinkle pier and about 45' farther than the permitted Ivey pier. Consequently there should be no impediments to navigation from the proposed Case pier, given the width of Bogue Sound at this point, distances to both the historical and ICW channels, and the widening space between the two navigational channels. 'Air =; Clyde B Case, III Major CAMA Permit Application January 21, 2015 Page 3 Along the shoreline of the Case property, water depths 400' from the waterward extent of coastal wetlands measure -.1' at NLW /MLW. Low water depths increase to -2.0' or greater at about 570' from the edge of marsh. As such, the proposed location and length of the Sprinkle dock complies with CAMA standards for increased water depths for piers exceeding 400'. The portion of the pier located waterward of NHW will be elevated a minimum of 6.5' above any substrate with SAVs, as shown on Sheet 2 of project plans. The pilings supporting the pier will be at least 10' apart, other than terminal instances, in order to lessen shading impacts to the vegetation and substrate. The proposed dock will not encroach into the federal channel setback, as designated by the US Army Corps of Engineers. At its closest point, the waterward end of the Case dock will be approximately 880' landward of the edge of the Intracoastal Waterway channel. Bogue Sound is about 13,000' wide at this point; therefore, the proposed pier length is consistent with the one - quarter width rule for piers. As previously noted, the proposed length of the pier will not create any impediments to navigation. The proposed Case dock will be located 239' on the east and 237' on the west from existing adjacent piers. It will be 82' from the proposed Sprinkle pier, located immediately west of the Case property. The Case dock will be located 25' from the adjacent riparian property line on the east and 24' from the riparian property line on the west. Construction Methods Conventional marine construction methodology will be employed. A barge with pile- driving equipment will be used for construction of the docking facility. The barge will be stored in deep water. Clyde B. Case, III Major CAMA Permit Application January 21, 2015 Page 4 NOTES This plan document Is for CAMA permitting purposes Owner Wor Contractor responsible to Insure all project construction Is consistent with owner's Intended uses Owner Wor contractor responsibility for project compliance with all applicable codes, ordinances, manufacturer recommendations and regulations Including building codes, setbacks, et cetera' Contractor responsibility to inspect site and Identify field conditions and related project cost Implications thereof Provide ramp waterward of existing platform to elevate proposed pier addition to 6 5 ft minimum above any substrate w /SAV Pilings supporting newly constructed pier shall be 10 ft apart minimum +1 Tie proposed ramp to To Proposed Platform existing grade Existing Pier E Propcsed Ramp Begin Ramp to Elev Proposed Remove existing steps %%%��� / at Elev = 4 75 it, Level Existing Maintain 1/12 sloe P Pier to 6 5 ft above SAV Substrate r Proposed Pier / Platform to M E P / / Existing— g m 1I w�i 0(NLW) Grade 0 ° m tO = Construction w/ P T Lumber, HDG or Better Fasteners & Appropriate For Use & Location - w — D Existing J s All construction subject to structural design -5 Piles -t- m Walkway selected manufacturer specifications & ° Timber Piles applicable Building Codes & standards 'a U U Pier Section 1' =10' CAMA Process Planning and Permit Facilitation by- COASTAL PLANNING SERVICES, INC. Kathy B. Vinson, AICP Comprehensive Land Use Planning and Development Assistance P O Sox 827 Office 252 354 4916 Morehead City, NC 28557 Fax 252 247 5875 epcpgeaeee�srta 11 ' �AF?0 ,/ y A y m W9 4 s9 o i LEGEND �klll =Coastal Wetlands M E P = Maximum Extent Practicable == Undisturbed Subgrade Permit Drawing For i)CNN iReview P8OY FOR COI�1S'PRi.DCTBOA7 fiYdultiple .9pprovals & Perrnits Reciuired N N C o E @ C C N v CO U m a a,., CL U 0 t O �MCJ w Lu oN cl� C LL N o X w X X W Q. L 0, f~ N V a z ai rt7 0 > O V d N Is W 0 CL m n U Nz m a 1 -0 2 J p d Q U u U z 0 W a U Um w w Z C o a o a) C: c v o � o C N O Qt U co c,, w a z o to d N U) Q, af _U C E,, Ox U N (nLL W _ U) W ru N in Q i W c z (L) o U J N Lt_ cn o :J V ! C -0 Q N `nn w ms X "z Q 0 3: W z u O � O a- V U v. ATLANTIC INTRACOASTAL WATERWAY vice T r COLE NOTES: This plan document is for CAMA permitting purposes. Owner Wor Contractor responsible to Insure all project construction is consistent with owner's Intended uses. Owner Wor contractor responsibility for project compliance with all applicable codes, ordinances, manufacturer recommendations and regulations Including building codes, setbacks, etcetera. Contractor responsibility to Inspect site and identify field conditions and related project cost implications thereof New construction extending waterward of NNW shall be elevated 6.5 ft. minimum above any substrate w1SAV. Pilings supporting newly constructed pier shall be 10 ft. apart minimum. / Existing Adjacent Pier ELL.A A. RAYMOND DI3. 378, PG. 254 Existing Adjacent Pier -�i VERNON JACKSON GARNER JR. TRUST s 1 D8. 1144, PG. 238 / " -0.t r • w ,, ` w i • Existing Retaining Wall N/F ELMER T. SPRINKLE DS. 1426, PG. 109 '4V r 0.14 ,. -0.06 x + -0.28 Survey 1 Base Map provided by: CHARLES A. RA & ASSOCIATES, PA FIRM# C - 338' 9117 HAMMOCK BEACH RD, P.O. BOX 1 f26 SWANSBOR0, NC 28564 (910)326-1408, (910) 326-1400 (Fax) NOT FOR CONVEYANCES OR RECORDING LEGEND: = 404 We,,1fands �= Coastal "Wetlands , 0.51 = MLW I r LW Depth 0 =Slip Nur nber Proposed 5' x 8' Single -Pole Jet Ski Lift (pole size per -- x -1.9 Existing Lift (13'x 13' / -0.4 -0,75 �' To Be Relocated To } ,/ 0 6 ,,� x 0.00 x _10 / / - Outer most edge of pier extends 55 feet waterward of ; New Platform . ® -o adjacent proposed Sprinkle pier and 97 feet , / / ® ' ` j J' ,,--f 40 x -1.1 � ® waterward of permitted Ivey pier #20 -14. Note that { . °,�°' x -0.22 %'2/ -0.16 -0.14 / �,- x -1.9 the edge of Intracostal Waterway is 17 feet farther OOV, ,.� �- from Historical Channel relative to proposed Sprinkle 1 �* "( x -0.7 /x -1.0 ® v ® / / x-0.49 ^> �- pier and 45 feet farther relative to permitted Ivey pier. .��7►, " °s '" °, � / 0.6 �,, sue° o / x -0.03 Sedp�e -0.26 -0.25 Q�oG Q 26 x -0.07 r -0.25 x -0.22 / \ x ® � ' A5 / Submerged ,.- . i ,� li�0lftl1l``�, x/ -0.o7® Aquatic !- / ® Vegetation Extent per i pies -0.1 -0.2 -0. Surveyor ,,t &w \14 x °°°°' Existing Platform ••. { •err -rte '" 1G$ ,,.-� IV x 25' .000 CD t' /x -0.1 .. • ' •' ` ®; / <=O.-3 e i 0 1 5 0 2 010. NHW 1 MHW / s .•,:: : :;� . (per DCM} Shoreline i Length =12,5' / 7:� \� i ea o 25 so ,ad IN FEET PRQJLCT.- ;;`14 '046 All construction soject to structural design, Pf0 osed Dock & Boat Lifts Seal ®Ct selected manufac`!jrer specifications & DRA BY: ! JN� f JRF applicable Building Codes & standards: