Loading...
HomeMy WebLinkAbout#5066-final INSPECTION REPORT ROUTING SHEET To be attached to all inspection reports in-house only. Laboratory Cert. #: 5066 Laboratory Name: Progress Energy Carolinas – H. F. Lee Steam Electric Plant Inspection Type: Field Maintenance Inspector Name(s): Todd Crawford Inspection Date: June 10, 2010 Date Report Completed: June 18, 2010 Date Forwarded to Reviewer: June 21, 2010 Reviewed by: Jason Smith Date Review Completed: June 28, 2010 Cover Letter to use: Insp. Initial _ Insp. Reg. X Insp. No Finding Insp. CP Unit Supervisor: Dana Satterwhite Date Received: June 28, 2010 Date Forwarded to Alberta: July 1, 2010 Date Mailed: July 2, 2010 _____________________________________________________________________ On-Site Inspection Report LABORATORY NAME: Progress Energy Carolinas – H. F. Lee Steam Electric Plant NPDES PERMIT #: NC0003417 ADDRESS: 1677 Old Smithfield Rd Goldsboro, NC 27530 CERTIFICATE #: 5066 DATE OF INSPECTION: June 10, 2010 TYPE OF INSPECTION: Field Maintenance AUDITOR(S): Todd Crawford LOCAL PERSON(S) CONTACTED: Tommy Hare and Ricky Miller I. INTRODUCTION: This laboratory was inspected to verify its compliance with the requirements of 15A NCAC 2H .0800 for the analysis of environmental samples. II. GENERAL COMMENTS: The facility has all the equipment necessary to perform the analyses. Technical Assistance documents for all certified parameters were provided at the time of the inspection. III. FINDINGS, REQUIREMENTS, COMMENTS AND RECOMMENDATIONS: Documentation Comment: Several instances of improper error corrections were observed. The Quality Assurance Policies for Field Laboratories document states: All documentation errors must be corrected by drawing a single line through the error so that the original entry remains legible. Entries shall not be obliterated by erasures or markings. Wite-Out®, correction tape or similar products designed to obliterate documentation are not to be used. Write the correction adjacent to the error. The correction must be initialed by the responsible individual and the date of change documented. All data and log entries must be written in indelible ink. Pencil entries are not acceptable. This policy was discussed with all analysts at the time of the inspection and each stated that proper corrections would be made in the future. No further response is necessary for this finding. Comment: The benchsheet used for the documentation of the temperature used for regulatory reporting did not include the units of measure. North Carolina Administrative Code 15A NCAC 2H .0805 (g) (1) states: Data pertinent to each analysis must be maintained for five years. Certified data must consist of date collected, time collected, samples site, sample collector, and sample analysis time. The field benchsheets must provide a space for the signature of the analyst, and proper units of measure for all analyses. A revised benchsheet which includes units of measure was sent to the auditor prior the completion of this report. No further response is necessary for this finding. Page 2 #5066 Progress Energy Carolinas – H. F. Lee Steam Electric Plant IV. PAPER TRAIL INVESTIGATION: The paper trail consisted of comparing field testing records and contract lab reports to Discharge Monitoring Reports (DMRs) submitted to the North Carolina Division of Water Quality. Data were reviewed for January, February and March, 2010. No transcription errors were detected. The facility appears to be doing a good job of accurately transcribing data. V. CONCLUSIONS: All findings noted during the inspection were adequately addressed prior to the completion of this report. The inspector would like to thank the staff for its assistance during the inspection and data review process. No response is required. Report prepared by: Todd Crawford Date: June 16, 2010 Report reviewed by: Jason Smith Date: June 28, 2010