HomeMy WebLinkAboutNC0024112_Authorization to Construct_20060208Michael F. Easley, Governor
William G. Ross Jr., Secretary
North Carolina Department of Environment and Natural Resources
Alan W. Klimek, P.E. Director
Division of Water Quality
February 8, 200/4(e_ /I efer OA neit'/ le)
The Honorable Joe G. Bennett, Mayor
City of Thomasville
Post Office Box 368
Thomasville, North Carolina 27361-0368
SUBJECT: Authorization to Construct
A to C No. 024112A02
City of Thomasville
Hamby Creek WWTF Improvements
Davidson County
Project No. CS370619-02
Dear Mayor Bennett:
A letter of request for Authorization to Construct was received on January 13, 2006, by
the Division, and final plans and specifications per negotiations with contractor for the subject
project have been reviewed and found to be satisfactory. Authorization is hereby granted for the
construction of modifications to the existing 4 MGD Hamby Creek Wastewater Treatment Plant,
with discharge of treated wastewater into Hamby Creek in the Yadkin -Pee Dee River Basin.
This authorization results in an increase in design and permitted capacity to 6 MGD, and
is awarded for the construction of the following specific modifications:
New influent filter screening equipment, new solids classifier grit removal system, new
oxidation ditch waste treatment system for biological nutrient removal, new final
clarifiers, new effluent filters, new UV disinfection system, new effluent metering
station, new post aeration system, new D.A.F. sludge thickening system, new
submersible pump return sludge pumping stations, new anaerobic digester covers, mixing
and heating equipment, new emergency power generating system, new medium voltage
distribution system, upgraded chemical storage and feed facilities, a new laboratory and
administration building addition (960 sq. foot), new controls, instrumentation and
SCADA system, and all associated site work, piping and appurtenances pursuant to the
application received on January 13, 2006, and in conformity with the project plan,
specifications, and other supporting data subsequently filed and approved by the
Department of Environment and Natural Resources.
This Authorization to Construct is issued in accordance with Part III, Paragraph A of
NPDES Permit No. NC0024112 issued June 27, 2005 and shall be subject to revocation unless
the wastewater treatment facilities are constructed in accordance with the conditions and
limitations specified in Permit No. NC0024112. None Carolina
)atura!!i
North Carolina Division of Water Quality 1617 Mail Service Center Raleigh, NC 27699-1617 Phone (919) 733-7015 Customer Service
Internet h2o.enr.state.nc.us 512 N. Salisbury St. Raleigh, NC 27604 FAX (919) 733-2496 1-877-623-6748
An Equal Opportunity/Affirmative Action Employer — 50% Recycled/10% Post Consumer Paper
The Honorable Joe G. Bennett, Mayor
February 8, 2006
Page 2
The sludge generated from these treatment facilities must be disposed of in accordance
with G.S. 143-215.1 and in a manner approved by the North Carolina Division of Water Quality.
In the event that the facilities fail to perform satisfactorily, including the creation of
nuisance conditions, the Permittee shall take immediate corrective action, including those as may
be required by this Division, such as the construction of additional or replacement wastewater
treatment or disposal facilities.
The Winston-Salem Regional Office, telephone number (336) 771-4600, shall be notified
at least forty-eight (48) hours in advance of operation of the installed facilities so that an on site
inspection can be made. Such notification to the regional supervisor shall be made during the
normal office hours from 8:00 a.m. until 5:00 p.m. on Monday through Friday, excluding State
Holidays.
Upon completion of construction and prior to operation of this permitted facility, a
certification must be received from a professional engineer certifying that the permitted facility
has been installed in accordance with the NPDES Permit, this Authorization to Construct and the
approved plans and specifications. Mail the Certification to Cecil G. Madden, Jr., P.E.,
Construction Grants & Loans, DWQ / DENR, 1633 Mail Service Center, Raleigh, NC 27699-
1633.
Upon classification of the facility by the Certification Commission, the Permittee shall
employ a certified wastewater treatment plant operator to be in responsible charge (ORC) of the
wastewater treatment facilities. The operator must hold a certificate of the type and grade at
least equivalent to or greater than the classification assigned to the wastewater treatment
facilities by the Certification Commission.
The Permittee must also employ a certified back-up operator of the appropriate type and
grade to comply with the conditions of T15A:8G.0202. The ORC of the facility must visit each
Class I facility at least weekly and each Class II, III and IV facility at least daily, excluding
weekends and holidays, must properly manage the facility, must document daily operation and
maintenance of the facility, and must comply with all other conditions of T15A:8G.0202.
A copy of the approved plans and specifications shall be maintained on file by the
Permittee for the life of the facility.
During the construction of the proposed additions/modifications, the permittee shall
continue to properly maintain and operate the existing wastewater treatment facilities at all times,
and in such a manner, as necessary to comply with the effluent limits specified in the NPDES
Permit.
You are reminded that it is mandatory for the project to be constructed in accordance
with the North Carolina Sedimentation Pollution Control Act, and, when applicable, the North
Carolina Dam Safety Act. In addition, the specifications must clearly state what the contractor's
responsibilities shall be in complying with these Acts.
The Honorable Joe G. Bennett, Mayor
February 8, 2006
Page 3
Failure to abide by the requirements contained in this Authorization to Construct may
subject the Permittee to an enforcement action by the Division of Water Quality in accordance
with North Carolina General Statute 143-215.6A to 143-215.6C.
The issuance of this Authorization to Construct does not preclude the Permittee from
complying with any and all statutes, rules, regulations, or ordinances which may be imposed by
other government agencies (local, state, and federal) which have jurisdiction.
One (1) set of approved plans and specifications is being forwarded to you. If you have
any questions or need additional information, please contact Cecil G. Madden, Jr., P.E. at
telephone number (919) 715-6203.
Sincerely,
an W. Klimek, P.E.
ID:cgm
cc: Mr. Don Garbrick, P.E., Pease Associates, Charlotte
Davidson County Health Department
DWQ Winston-Salem Regional Office, Surface Water Protection
Technical Assistance and Certification Unit
Daniel Blaisdell, P.E.
Point Source Branch, NPDES Program
Cecil G. Madden, Jr., P.E.
Ishwar Devkota, P.E.
SRF