Loading...
HomeMy WebLinkAboutNC0020389_Correspondence_20001204MAYOR DON H. JOHNSON COMMISSIONER FREDRICK D. NELSON, JR. RAY G. SMITH JACK R. LITTLETON KENNITH M. DUPREE LINDELL NORDAN M. SCOTT BARNES TOWN OF BENSON November 27, 2000 Mr. Kerr T. Stevens, Director Division of Water Quality 1633 Mail Service Center Raleigh, NC 27699-1633 Re: P.O. BOX 69 303 EAST CHURCH STREET NORTH CAROLINA 27504 (919) 894-3553 FAX (919) 894-1283 Issuance of NPDES, Permit NC0020389 Benson WWTP Johnston County Dear Mr. Stevens: TOWN MANAGER KEITH R. LANGDON TOWN CLERK CAROLYN A. NORDAN, CMC TAX COLLECTOR ROSALIE G. WEST TOWN ATTORNEY DONALD A. PARKER DENRANATER QUALITY UA NCH POINT SOURCE BRA In regards to your letter dated October 9, 2000, the Town of Benson would like to submit the following information in reference to the changes that were made in regards to the issuance of NPDES Permit NC #0020389. • Wastewater Management Plans is in the process of being prepared with the assistance of the Wooten Company and will be submitted within the 180 days of the effective date of the permit as allowed by your letter. • Town of Benson purchased and installed on November 21, 2000 effluent flow meters. The Town of Benson will start recording effluent flow meter reading in the December 2000 report. • The Town of Benson purchased and installed two Staff Gauged on November 20, 2000. The r, level of the lagoon will be recorded daily on our daily log beginning November 27, 2000. • The reconfiguration/modification to incorporate biological nutrient removal project is virtually complete. The increase amounts of nitrogen being removed from the WWTP will be reflected in our December 2000 monthly report, when we start monitoring nitrogen on a weekly basis instead of monthly. In your letter you stated we were currently rated Class III, it is our understanding we have been a Class IV since 1990. v'/rkls f(ii-AAa UiID � U6fJC-1e EGT CLAS9 T C:\My Documents \Old_docs \ KEITH \kerr stevens-wq-11-2000.doc • The Town of Benson has already contacted the Division of Technical Assistance Certifications Unit. They visited our plant on July 25, 2000. They have made several recommendations to enhance the treatment process and the performance of our facilities. These suggestions have been reviewed with our engineer and plant operator and have been implemented or are being considered at this time. • The Town of Benson will allocate appropriate resources in the future to insure that the WasteWater Treatment Plant maintenance requirements are met. • The Town of Benson will comply with the additional monitor requirement of conductivity of copper, zinc and silver. These samples will be sent to a commercial certified lab, however when the Town of Benson staff is certified to monitor conductivity samples these samples will be done in-house. The Town of Benson staff remains ready to assist NCDENR or any of your department to assure you that the Benson Waste Water Treatment Plant is complying with all state requirements to assure that quality water is being discharged to the public steams and water of North Carolina. Should you have any question please contact my office at (919) 894-7404. Sincerely, Keith R. Langdon Manager P. S. Again the Town of Benson extends an open invitation to you and your staff to visit our plant to view the improvements that have been made since your last visit on April 2000. cc: Raleigh Regional Office, Water Quality Technical Assistance and Certification Unit NPDES Files C:\My Documents \Old_ docs\KEITH\kerr stevens-wq-11-2000.doc Re: Benson Subject: Re: Benson Date: Mon, 20 Nov 2000 16:29:17 -0500 From: ken <ken@ncmail.net> To: Susan Wilson <susan.a.wilson@ncmail.net> Susan, It's okay with us. Susan Wilson wrote: > Ken, > I think you were copied on the letter Benson submitted requesting a > little time to install continuous flow effluent meter. It appears they > want until the end of November to install, calibrate, etc. I'm ok with > starting them with that requirement on Jan 1. Is that Ok with ya'll? > If so - I can call them or drop them a short letter (probably drop them > a short letter just for the record). e, - ' (fit TN I.icikic e)N )l (72_ C't l 7t6g-- 4 k- ic- �, o d= ,kr1-0 (Al ptu = D,i opiik€F Momi7-0241 5 cor'JC( y� ctiuce,, 1,1 Likcoopu. 1 of 1 11/21/00 10:05 AM NPDe et Mayor Don H. Johnson Town Manager Keith R. Langdon Town Clerk Carolyn Nordan Superintendent John D. Alt Sr. TOWN of BENSON Water/Wastewater System Wastewater Treatment Facility 11/9/00 Mr. err T. Stevens, Director No Carolina Division of Water Quality 1 • 7 Mail Service Center eigh, North Carolina 27699 - 1617 John D. Alt Sr. Superintendent Benson Wastewater Treatment Facility 770 Hannah Creek Road Four Oaks, NC. 27524 Re: NPDES Permit # NC 0020389 Benson Wastewater Treatment Plant Johnston County Dear Mr. Stevens: Mayor Pro Tem Jack R. Littleton Commissioners Fredrick D. Nelson Ray G. Smith Scott Barnes Kenneth M. Dupree Lindell Nordan 4101/ of OF �,� ��b ir,E We have reviewed the above referenced permit and there is one condition which we must ask be either modified, or not enforced immediately. That condition is the one requiring the use of a continuous effluent flow meter for reporting plant flow's. The Town ordered an Isco model #4210 flow meter on September 24, 2000 and the meter was delivered on October 31st, 2000. At this time it is still necessary to modify the 4 foot effluent discharge opening in the post aeration chamber wall with an aluminum 2 foot rectangular weir with side contractions to provide greater accuracy and also an aluminum stand to mount the meter on. Both have been ordered from a local machine shop and will be ready for pick up on November 14th at which time we will begin installation of all components. Accordingly, we do not expect to have the meter installed, setup and calibrated by the vendor and running until at least November 27th 2000, if we do not encounter any major problems. The requirement for continuous effluent flow monitoring has not been in our previous permits and we do not see it as unreasonable to allow a small amount of time to install the equipment needed to comply with the new conditions before enforcing those conditions. Please let us know if there will be any difficulty with allowing this request We do have continuous flow metering on the plant influent and will continue to use that metering for reporting until such time as the effluent flow metering becomes operational. 770 Hannah Creek Road Four Oaks, North Carolina 27524 (919) 894-2373 Fax (919) 894-5808 P i iu 1,1an►6,7D0?"1, i,A3, Ct 4E 15 huceADy tntSvicceJ (i PO s � his . Ptk. If you should have any questions concerning this request please feel free to call me at (919) 894-2373 or Mr. Keith Langdon at (919) 894-1606 Sincerely, 69-(41' V, QQ,Qii� 4, . John D. Alt Sr. Supt. Benson Wastewater Treatment Facility cc: Keith Langdon Benson Town Manager Ms. Susan Wilson. Division of Water Quality Mr. Ken Schuster. Regional Water Quality Supervisor