Loading...
HomeMy WebLinkAboutNC0000396_Extension of Deadline 2004_20041124 • } oNAT Michael F.Easley OG �' Governor r ©�� William G.Ross,Jr.,Secretary NCDENR North Carolina Department of Environment and Natural Resources Alan W.Klimek,P.E.,Director Division of Water Quality November 24, 2004 Mr. William S. Orser Group President, Energy Supply Progress Energy Carolinas P.O. Box 1551 Raleigh, North Carolina 27602 Subject: Extension of deadline for Submitting Information to Comply with the Phase II 316 (b) Rule Dear Mr. Orser: The Division of Water Quality has reviewed your request to extend the deadline for submitting information required by the Phase II Rule, 40 CFR Part 125 Subpart J until January 7, 2008 for the following facilities: 1) NC0000396 Asheville Steam Electric Plant 2) NC0007064 Brunswick Nuclear Plant 3) NC0003433 Cape Fear Steam Electric Plant 4) NC0039586 Harris Nuclear Plant 5) NC0003425 Roxboro Steam Electric Plant 6) NC0001422 Sutton Steam Electric Plant After considering complexity of the issue and reviewing options allowed by the rule, the Division grants your request. The Division encourages you to follow the schedule outlined in your letter and continue consultation with our staff to achieve compliance with the requirements of the Phase II 316 (b) rule. If you have any questions concerning this issue, please contact Sergei Chernikov at telephone number (919) 733-5083, extension 594. Sincerely, 6014,i, A tom an Klimek, P.E. cc. Central Files NPDES Permit File EPA, Region IV N.C.Division of Water Quality/NPDES Unit Phone:(919)733-5083 1617 Mail Service Center,Raleigh,NC 27699-1617 fax:(919)733-0719 Internet:h2o.enr.state.nc.us DENR Customer Service Center:1 800 623-7748 • ?weir-� wig - Ate 31e✓,7 e �' o/' re : 31k)(L) Progress Energy Carolinas, Inc. 316(b) Facilities in North Carolina Facility NPDES Permit Application PIC/ Water Proposed Date for Submittal of Permit No. Expiration Due Date CDS Body , Application Information or Date Required Comprehensive Demonstration Study Asheville Steam NC0000396 12/31/05 07/04/05 To be Lake No later than January 7,2008 Electric Plant determined Brunswick NC0007064 11/30/06 06/01/06 Yes Estuary No later than January 7,2008 Nuclear Plant Cape Fear NC0003433 07/31/06 02/01/06 Yes River No later than January 7,2008 Steam Electric Plant Harris Nuclear NC0039586 07/31/06 02/01/06 No Lake No later than January 7,2008 b Plant Roxboro Steam NC0003425 03/31/07 10/02/06 Yes Lake No later than January 7,2008 Electric Plant Sutton Steam NC0001422 12/31/06 07/04/06 No Tidal No later than January 7,2008 b Electric Plant River a Possible that it can be demonstrated that facility is currently in compliance b Closed-cycle cooling system, CDS not required, necessary information may be submitted with reissuance application