Loading...
HomeMy WebLinkAbout20070183 Ver 1_Monitoring Plans_20020219 (2)Section VII. Avoidance and Minimization Crossing C2 Culvert replacement was used to bring culvert invert nearer to existing stream invert. Relocated stream channel follows foot of embankment (toe of slope) in order to tie back in to the existing stream channel at the earliest possible point. Crossing C7 Culvert replacement was used to bring culvert invert nearer to existing stream invert. Use of plunge pool to dissipate energy to existing incised stream channel. Relocated stream channel follows toe of slope to allow efficient tie-in to existing stream channel. Crossing C8 Impacts to this crossing were avoided. - Crossing C9 Culvert replacement was used to bring culvert invert nearer to existing stream invert. Use of plunge pool to dissipate energy to existing incised stream channel. Relocated stream channel follows toe of slope to allow efficient tie-in to existing stream channel. New pipe was placed to minimize cut/fill impacts to wetland. Crossing C10 Impacts to this cros:;ing were avoided. Crossing C11 Impacts to this crossing were avoided. Crossing C12 Culvert was extended instead of being replaced, allowing work on only one side of the rail bed. No stream relocation was necessary. Excavation is proposed only for footprint of new track. Crossing C13 Culvert was extended instead of being replaced, allowing work on only one side of the rail bed. Stream relocation is necessary, but will follow toe of slope to minimize length of stream relocation. Excavation or fill is proposed only for footprint of new track. Crossing C16 Culvert replacement was used to bring culvert invert nearer to existing stream invert. Relocated stream c~~annel follows foot of embankment (toe of slope) in order to tie back in to the existing stream channel at the closest possible point. Crossing C17 Impacts to this crossing were avoided. Crossing C18 Culvert replacement was used to bring culvert invert nearer to existing stream invert. Use of plunge pool to dissipate energy to existing incised stream channel. Relocated stream channel follows toe of slope to allow efficient tie-in to existing stream channel. New pipe was placed to minimize cut/fill impacts to wetland. Crossing C19 North Carolina Department of Transportation Cox to Hoskins Siding Improvements Rail Division Section VII. Avoidance and Minimization Existing above-grade pipes to be filled. Culvert was extended instead of being replaced, allowing work on only one side of the rail bed. No stream relocation was necessary. Crossing C20 Culvert replacement was used to bring culvert invert nearer to existing stream invert. Use of plunge pool to dissipate energy to existing incised stream channel. Relocated stream channel follows toe of slope to allow efficient tie-in to existing stream channel. New pipe was placed to minimize cut/fill impacts to wetland. Crossing C22 Culvert replacement was used to bring culvert invert nearer to existing stream invert. Use of plunge pool to dissipate energy to existing incised stream channel. Relocated stream channel follows toe of slope to allow efficient tie-in to existing stream channel. New pipe was placed to minimize cut/fill impacts to wetland. North Carolina Department of Transportation Cox to Hoskins Siding Improvements Rail Division