Loading...
HomeMy WebLinkAboutNCC203845_NOT Closeout Documents_20230117North Carolina Department of Environmental Quality Land Resources: 1628 Mail Service Center, Raleigh, NC 27699 (919) 791-4200 County: Chatham Project: NC 751 Phase 2A 12" Steel Natural Gas River basin: Cape Fear Person financially responsible: Public Service Company of North Carolina, Project #: CHATH-2021-004 Incorporated - M. Shaun Randall, Vice President - Gas Operations Address: P.O. Box 1398, Gastonia, NC 28053-1398 1. Project Location: NC 751, New Hill -Olive Chapel, Apex Pictures: No 2. Weather and soil conditions: sunny, dry, workable Initial inspection: Yes 3. Is site currently under notice of violation? No 4. Is the site in compliance with S.P.C.A. and rules? Yes If no, check violations below: 5. Violations: 6. Is the site in compliance with NPDES Permit NCGO10000 Construction Stormwater requirements? Describe: 7. Has sedimentation damage occurred since last inspection? No If Yes, where? (check all that apply) Degree of damage: 8. Contact made with (name): no one on site Title: Inspection report: Sent Report Date given/sent: November 21, 2022 9. Corrective action needed: Yes 10. Comments: Permanent ground cover sufficient to restrain erosion has been established. No additional self -monitoring or self -inspections are required. Project is in compliance and released under the SPCA. Termination of coverage under the NPDES General Stormwater Permit for Construction Activities (NCGO1) must be requested by the permittee via a Notice of Termination (NOT). The NOT is available at: https://edocs.deq.nc.gov/Fonns/NCGOI-Termination. Please note that this correspondence must be uploaded as part of completing the NOT process. Reported by: Kimberly Summers Others present: C. Amaya, M. Frazier Date of inspection: November 15, 2022 Time arriving on site: 10:00 AM Time leaving site: 10:40 AM cc: