HomeMy WebLinkAboutSite Inspection 1.13.23 Ruth Bypass Non-CompliantWetland Inspection Report
Project Num: 20200362 Version: 2 Status: Issued
Project Name: NCDOT -Improvements to US 221 - Rutherfordton Project Type: Road
Coun • ass (R-2233BB BA) me ce/repair/improveme
h • Ruthero ns Region: sheviF
Location: NCDOT - Improvements to US 221 - Rutherfordton Bypass (R-2233BB BA)
Latitude: +350 22' 43"
SW Plan Location:
Site Owner Name: NC DOT Division 13
Inspection Date: 1/13/2023
Reason for Inspection: Routine
Inspection Type: Site Inspection (DOT)
Longitude: -810 56' 60"
Inspection Contact Person: Title: Phone:
On -Site Representative(s):
Primary Inspector: Robert K Mitchell
Secondary Inspector(s):
Facility Compliance Status: ❑ Compliant 0 Not Compliant
Program Areas: 401 (includes isolated/non-404)
Question Areas:
Permit (401 WQC)
Inspection Summary:
Phone:
Site inspection was conducted on January 13, 2023 by Kevin Mitchell with the Asheville Regional Office. Dave
McHenry (NCWRC), Ross Stroup, Taylor Ivie, and Jesse Martinez were present during the inspection. Other
representatives from Wright Brothers were also present during portions of the inspection. The following are items that
require attention:
- 779+00 LT (Above JS) - Remove sediment from inside stormwater pipe outlet above JS.
- 797+50 LT (Site 4) - Sediment was observed in the stream. Sediment needs to be removed from the stream and
stabilized on site. Additional measures are planned to prevent future sediment loss.
- 797+50 RT (Site 4) - Recommend cover on slope above JS/basin at culvert inlet.
- 830+00 RT (Site 6) - A small amount of sediment was observed in the stream below the SDO on the left bank
descending of the cuvlert outlet. Sediment needs to be reomoved. Rip rap still needs to be installed below the baffles
inside the culvert.
Ensure that project is meeting NPDES stabilization requirements.
page: I
Site Number: 20200362 Owner: Bryan, Roger D
Inspection Date: 1/13/2023 Inspection Type: Site Inspection (DOT) Reason for Visit: Routine
Permit (401 WOO
Does the impact(s) match what was approved in the 401 WQC or non 404 permit?
Are the culverts and/or filled areas installed properly?
Is the site compliant with additional conditions of the 401 WQC or non 404 permit?
Comment: Sediment was observed in the stream at Site 4 below the outlet.
Yes No NA NE
•
❑
❑
❑
•
❑
❑
❑
❑
■
❑
❑
page: 2