Loading...
HomeMy WebLinkAbout20070183 Ver 1_EEP Acceptance Letters_20061218r o~ O ~~5.! > lAq,~ FNS ~ S9M.~, T~~Fk ~Q~6 ~Y~, -.~C(~ S$~l~l k k s PROGRAM December 18, 2006 Mr. Todd Tugwell U. S. Army Corps of Engineers Raleigh Regulatory Field Office 6508 Falls of the Neuse Road, Suite 120 Raleigh, North Carolina 27615 Dear Mr. Tugwell: Subject: EEP Mitigation Acceptance Letter: NCDOT Rail Division Improvements -Cox to Hoskins Siding; Cape Fear River Basin (Cataloging Units 03030002 and 03030003); Central Piedmont (CP) Eco-Region The purpose of this letter is to notify you that the Ecosystem Enhancement Program (EEP) will provide the compensatory stream mitigation for the unavoidable impact associated with the above referenced project. As indicated in the NCDOT's mitigation request dated December 13, 2006, compensatory stream mitigation from EEP is required for approximately 472 feet of stream impacts located in the following cataloging units: Cape Fear 03030002 132 feet Cape Fear 03030003 340 feet Mitigation for this project will be provided in accordance with Section X of the Memorandum of Agreement between the N. C. Department of Environment and Natural Resources, the N. C. Department of Transportation, and the U. S. Army Corps of Engineers signed on July 22, 2003. EEP commits to implement sufficient compensatory stream mitigation up to 264 stream credits in Cape Fear 03030002 and 480 stream credits in Cape Fear 03030003 to offset the impacts associated with this project by the end of the MOA year in which this project is permitted. If the impacts change from the above listed amount, then this mitigation strategy letter will no longer be valid and a new mitigation strategy letter will be required from EEP. . ~.. _ - , N~ ENR North Carolina Ecosystem Enhancement Program, 1652 Mail Service Center, Raleigh, NC 27649-1652 / 419-115-0476 / www.nceep.net If you have any questions or need additional information, please contact Ms. Beth Harmon at 919-715-1929. Sincerely, ~ `~ ~ ~ ~~ i Wilharii D. Gilmore, P.E. EEP Director cc: Mr. John Hennessy, Division of Water Quality, Wetland/401 Unit Mr. Marc Hamel, NCDOT Rail Division Mr. Gregory J. Thorpe, Ph.D., NCDOT-PDEA Ms. Linda Fitzpatrick, NCDOT-PDEA Ms. Elizabeth Scherrer, EcoScience File: NCDOT Rail Division -Cox to Hoskins Siding Improvements December 18, 2006 Mr. Marc Hamel Rail Project Development Engineer Rail Division Environment and Planning Branch North Carolina Department of Transportation 1553 Mail Service Center Raleigh, North Carolina 27699-1553 Dear Mr. Hamel: Subject: EEP Mitigation Acceptance Letter: NCDOT Rail Division Improvements -Cox to Hoskins Siding, Guilford County The purpose of this letter is to notify you that the Ecosystem Enhancement Program (EEP) will provide the compensatory stream mitigation for the subject project. Based on the information supplied by you in a mitigation request dated December 13, 2006, the impacts are located in the following cataloging units of the Cape Fear River Basin in the Central Piedmont (CP) Eco-Region: Cape Fear 03030002: 132 feet Cape Fear 03030003: 340 feet Mitigation for this project will be provided in accordance with the Memorandum of Agreement between the N. C. Department of Environment and Natural Resources, the N. C. Department of Transportation, and the U. S. Army Corps of Engineers signed on July 22, 2003. EEP will commit to implementing sufficient compensatory stream mitigation to offset the impacts associated with this project by the end of the MOA year in which this project is permitted. If the above referenced impacts amounts are revised, then this mitigation acceptance letter will no longer be valid and a new mitigation acceptance letter will be required from EEP. ~. _ ~~~ North Carolina Ecosystem EnhancemenC Program,16~2 Mai! Service Center, Raleigh, NC 27699-1652 / ~9i9-115-04 b~ENR nceep.net ,~ „ ~, If you have any questions or need additional information, please contact Ms. Beth Harmon at 919-715-1929. Sincerely, i W htam D. Gilmore, P.E. EEP Director cc: Mr. Todd Tugwell, USACE -Raleigh Mr. John Hennessy, Division of Water Quality, Wetlands/401 Unit Ms. Elizabeth Scherrer, EcoScience Mr. Gregory J. Thorpe, Ph.D., NCDOT-PDEA Ms. Linda Fitzpatrick, NCDOT-PDEA File: NCDOT Rail Division -Cox to Hoskins Siding Improvements