Loading...
HomeMy WebLinkAboutNCC230172_ESC Approval Submitted_20230120Iredell County Planning & Development Erosion Control Section 349 North Center Street P.O. Box 788 Statesville, NC 28687 Date: January 121h 2023 LETTER OF APPROVAL WITH MODIFICATIONS David Hughes Logan Farms Development Partners, LLC P.O. Box 3965 Mooresville, NC 28117 RE: Project Name: Logan Farms Subdivision Acres Approved: 38 Project ID: MVLLE-2023-003 Project Location: PIN 4667772479.000 Submitted By: WK Dickson & Co., Inc. Date Received: July 12`h 2022 Plan Type:Transfer of Financial Responsible Ownership Dear Mr. Hughes: This office has reviewed the subject erosion and sedimentation control plan. We find the plan to be acceptable with modifications and herby issue this Letter of Approval with Modifications. Modifications must be received in this office no later than two weeks prior to the project start date. Failure to submit modified plans can result in a violation and fine under the Iredell County Land Development Code. The Modifications required for Approval are listed on the attached page. The Certificate of Approval issued by Iredell County must be posted at the job site. This plan approval shall expire three (3) years following the date of this approval as is required by Title 15A NCAC 4B.0129 and Appendix H of the Iredell County Land Development Code. Title 15A NCAC 413 0118(a) and Appendix H of the Iredell County Land Development Code requires that a copy of the approved erosion control plan be on file at the job site. Any amendments and/or revisions to the approved plan must be reviewed and approved prior to implementation in order for the site to remain in compliance. Failure to submit plans for approval may result in administrative actions and/or penalties as indicated in the Iredell County Land Development Code. Also, this letter gives notice as required by G.S. 113A-61.1(a) and Appendix H of the Iredell County Land Development Code, of our right of periodic inspection to insure compliance with the approved plan. Iredell County's Sedimentation Pollution Control Program is performance -oriented, requiring protection of existing natural resources and adjoining properties. If, following the Letter of Approval with Modifications Logan Farms Subdivision January 12'h 2023 Page 2 of 3 commencement of this project, it is determined that the erosion and sedimentation control plan is inadequate to meet the requirements of the Iredell County Land Development Code and the Sedimentation Pollution Control Act of 1973, (North Carolina General Statute I I3A-51 through 66), this office may require revisions to the plan and implementation of the revisions to insure compliance with the Act and Code. Acceptance and approval of this plan is conditioned upon your compliance with Federal and State water quality laws, regulations, and rules. In addition, local city or county ordinances or rules may also apply to this land -disturbing activity. This approval does not supersede any other permit or approval. It is the responsibility of the applicant to obtain all other required permits or approvals. As of May 1, 2019, all new construction activities are required to complete and submit an electronic Notice of Intent (NOI) form requesting a Certificate of Coverage (COC) under the NCGO10000 Construction Stormwater General Permit. This form MUST be submitted prior to the commencement of any land disturbing activity on the above named project. The NOI form may be accessed at deq.nc.gov/NCGO1. Please direct questions about the NOI form to Annette Lucas at Annette.lucas@ncdenr.gov or Paul Clark at Paul.cIark@ncdenr.gov. After you submit a complete and correct NOI Form, a COC will be emailed to you within three business days. Initially, DEMLR will not charge a fee for coverage under the NCGO1 permit. However, on or after May 1, 2019, a $100 fee will be charged annually. This fee is to be sent to the DEMLR Stormwater Central Office staff in Raleigh. Please note that this approval is based in part on the accuracy of the information provided in the Financial Responsibility Form, which you provided. You are requested to file an amended form if there is any change in the information included on the form. In addition, it is required that this office to be notified of the proposed starting date for this project. Failure to notify this office of the starting date may result in a Notice of Violation and civil penalty. Please notify us when you plan to have a preconstruction conference. Your cooperation is appreciated. Sincerely, Jonathan Williams, CESSWI, CZO Erosion Control Coordinator Enclosures: Modifications Fact Sheet on the New NCGO 1 Permit Letter of Approval with Modifications Logan Farms Subdivision January 12'h 2023 Page 3 of 3 MODIFICATIONS REQUIRED FOR APPROVAL Project Name: Logan Farms Subdivision Project ID: MVLLE-2023-003 County: Iredell Reviewed by: Jonathan Williams Original Approval: August 3d 2022 Required changes are designated as "RC" under legal authority from NC General Statutes Chapter 113A Article 4 and the Iredell County Land Development Code. Suggested changes are designated as "SC" for improvement of the plan. 1. Reduce Phase I disturbed acreage from 20.24 acres to under 20 acres to meet to meet State High Quality Water Zone regulation allowing no more than 20 acres to be disturbed at one time. —RC 2. Add note to the Erosion Control Notes that this site drains to a North Carolina designated High Quality Water Zone (Back Creek) and that no more than 20 acres may be disturbed at any time throughout the duration of the project. —RC 3. Delineate on the erosion control plans a limits of disturbance for stream crossing work that will require 401/404 permits prior to this area being disturbed. Ensure stream crossing is protected when work is not active. —RC 4. Notate in the Construction Sequence that a copy of 401/404 permits will be presented to Iredell County Erosion Control prior to stream crossing disturbance. —RC 5. Ensure Phase 3 is adequately protected on the immediate downslopes to keep sediment from eroding into stabilized Phase I & 2 areas. —RC G. Provide a standard lot development detail for Phase 3. —RC 7. Delineate stockpile locations and protect on the immediate downslope with silt fence. Stockpiles must be located 50 feet from basins and diversions and accounted for as part of the 20 acre max disturbance. —RC 8. Adjust Basin 1 skimmer orifice size to I inch in order to dewater the required volume during all phases in as close to 3 days' time possible. --RC 9. Adjust Basin 3 skimmer orifice size to 1.75 inches in Phases 1 & 2 and 2.25 inches in Phase 3 in order to dewater the required volume in as close to 3 days' time possible. —RC 10. Adjust Basin 4 skimmer orifice size to 1.25 inches in order to dewater the required volume in as close to 3 days' time possible. —RC 11. Ensure clean water bypass channels are protected until complete and stabilized. —RC