HomeMy WebLinkAboutNCC205093_NOT Closeout Documents_20230116ROY COOPER
py°
Governor
ELIZABETH S. BISER
Secretary
BRIAN WRENN
Director
NORTH CAROLINA
Environmental Quality
Dear Sir or Madam:
Attached is a copy of the inspection report which was prepared following an on -site inspection of the
subject site. This report is intended to provide you with information concerning the status of the site
as it relates to compliance with the North Carolina Sedimentation Pollution Control Act on 1973.
Please review this report carefully as it may contain corrective actiers needed or comments which will
assist you in meeting the required performance standards of the Act.
It is our desire that any and all possible problems be discussed and resolved at the earlies possible
time. To facilitate this effort, please contact the named inspector at the address shown on the
inspection report if you have any questions.
Sincerely
Land Quality Section
Mooresville Regional Office
North Carolina Depamnent of Environmental Quality Division of Energy, NGneral and Land Resources
Mooresville Regional Office 610 East Center Avenue, Suite 301 Mooresville, � orth Carolina 28t I5
704-663-1699
North Carolina Department of Environmental Quality
Land Resources: 610 East Center Avenue, Suite 301, Mooresville, NC 28115 (704) 663-1699
County: Iredell Project: Statesville Middle School Upgrades 2020 River basin: Yadkin-PeeDee
Person financially responsible: lredell Statesville Schools - Rob Jackson, Director of Construction Project #: IREDE-2020-015
Address: 350 Old Murdock Road, Troutman, NC 28166
1. Project Location: 321 Clegg Street, Statesville
Pictures: No
2. Weather and soil conditions: Rainy, Wet Workable Soils
3. Is site currently under notice of violation? No
4. Is the site in compliance with S.P.C.A. and rules? Yes
5. Violations:
Initial inspection: No
If no, check violations below:
6. Is the site in compliance with NPDES Permit NCG010000 Construction Stormwater requirements?
Describe:
7. Has sedimentation damage occurred since last inspection? No If Yes, where? (check all that apply)
Degree of damage:
8. Contact made with (name): No One Onsite Title:
Inspection report: Sent Report Date given/sent: December 09, 2022
9. Corrective action needed:
10. Comments: Overall the site has sufficient permanent ground cover to restrain erosion, however there are
some bare areas that need to be stabilized, No additional self -monitoring or self -inspections
are required. Project is in compliance and released under the SPCA. Termination of coverage
under the NPDES General Stormwater Permit for Construction Activities (NCGO 1) must be
requested by the permittee via a Notice of Termination (NOT) unless permit approval date
was prior to April 2019.
The NOT is available at: https://edoes.deq.nc.gov/Forms/NCGOI-Termination. Please note
that this correspondence must be uploaded as part of completing the NOT process.
Yes
Reported by: Jeffrey Chandler Others present:
Date of inspection: December 06, 2022 Time arriving on site: 9:45 AM Time leaving site: 10:00 AM
cc: