Loading...
HomeMy WebLinkAbout20190875 Ver 2_More Info Received_20230118Moore, Andrew W From: Tyson Kurtz <tkurtz@enviroscienceinc.com> Sent: Wednesday, January 18, 2023 2:32 PM To: Moore, Andrew W Cc: Davis, Brooke A CIV SAW Subject: RE: [External] SAW-2019-00485 Haywood Estates Attachments: Pg 4 Stream Impact Table PCN Form.pdf; Revised Figure 5.0-5.2_01.17.2023.pdf; Watershed Permit Signed 11.22.22.pdf; Grading, Drainage and EC Plans 1-12-23 (signed).pdf; Pages from 2022.11.16 R-2588B_Plan Sheets.pdf CAUTION: External email. Do not click links or open attachments unless you verify. Send all suspicious email as an attachment to Report Spam. Andrew and Brooke, The water line crossing the central stream (Impact S1 — UT to Mill Pond Creek) was moved downstream, closer to Hwy 191 per request from the City of Hendersonville. Revised Figures 5.0-5.2 are attached. Impact Site S1 was changed from 23 LF / 0.003 Ac to 27 LF / 0.003 Ac due to the streams alignment at the new crossing location. Page 4 from the PCN is also attached with the updated impact quantities for S1. Please see the responses to DWR's questions below: 1. Please copy the Division on your response to the Corps questions below. [15A NCAC 02.0506(b)(1)] a. NC DWR was copied on the Corps response and the Corps will be copied on this response. 2. Please provide a map that shows building envelopes for all lots with streams or wetlands as well as all stormwater control measures. [15A NCAC 02H .0502] a. The email dated December 14, 2022 sent in response to the USACE's request for additional information addressed the building envelope component. The attached grading, drainage, and erosion control plans show the location of all proposed stormwater control measures. The project also holds a watershed (stormwater permit) from Henderson County for low -density development stormwater management (see attached). 3. It appears stream impact S1 could be avoided by connecting the water line along the southern access road directly to the water main along Haywood Road. Please revise the plans to avoid this impact or explain why it cannot be practically avoided. [15A NCAC 02H .0506(b)(2)] a. Avoidance of Impact S1 is not practicable for several reasons: i. The existing water line that comes across Hwy 191 (running parallel with Haywood Park Drive — the existing road inside the project site) was bored beneath Haywood Rd and tied into an existing water main several years ago. Since then, an expansion of Hwy 191 has occurred which has placed the existing water main in the Hwy-191 travel lane. This would require an open cut of the road and because of the road's average daily traffic, a road closure is not advisable by NCDOT. ii. The existing water main is under -sized and is getting relocated in NCDOT project R-2588B. This relocation is anticipated to occur in the next 12-24 months. Due to this relocation, the City of Hendersonville will not allow us to tie onto the existing line at the intersection of the second/proposed access road, as suggested. iii. As a request of the City of Hendersonville, the proposed water line has been relocated closer to Hwy 191. This proposed utility area is parallel and consistent with the utility easement i proposed by NCDOT in project R-2588B. This temporary impact is occurring almost directly adjacent to where NCDOT is proposing to realign a portion of the existing reference stream. The applicant believes these responses and attachments provides the requested information for this project. Feel free to let me know if you have any additional questions or troubles with the attached files (-12 MB total). Thank you, Tyson Kurtz Biologist 0: 828-698-9800 ext. 302 I C: 610-310-8744 From: Moore, Andrew W <andrew.w.moore@ncdenr.gov> Sent: Wednesday, December 07, 2022 4:01 PM To: Tyson Kurtz <tkurtz@enviroscienceinc.com> Cc: Davis, Brooke A CIV SAW <Brooke.A.Davis@usace.army.mil> Subject: RE: [External] SAW-2019-00485 Haywood Estates Tyson, On November 28, 2022, the Division of Water Resources (Division) received your application requesting a 401 Water Quality Certification from the Division for the subject project. The Division has determined that your application is incomplete and cannot be processed. The application is on -hold until all of the following information is received: 1. Please copy the Division on your response to the Corps questions below. [15A NCAC 02 .0506(b)(1)] 2. Please provide a map that shows building envelopes for all lots with streams or wetlands as well as all stormwater control measures. [15A NCAC 02H .0502] 3. It appears stream impact S1 could be avoided by connecting the water line along the southern access road directly to the water main along Haywood Road. Please revise the plans to avoid this impact or explain why it cannot be practically avoided. [15A NCAC 02H .0506(b)(2)] Pursuant to Title 15A NCAC 02H .0502(e), the applicant shall furnish all of the above requested information for the proper consideration of the application. Please provide your response by January 6, 2023. If all of the requested information is not received, the Division will be unable to approve the application and it will be denied as incomplete. The denial of this project will necessitate reapplication to the Division for approval, including a complete application package and appropriate fee. Feel free to contact me if you have any questions. Andrew W Moore, P.G. Environmental Specialist 11, Division of Water Resources North Carolina Department of Environmental Quality Office: (828) 296-4684 Andrew.W.Moore@ncdenr.gov 2 NORTH CAROLINA - \ Department of Environmental Quality Email correspondence to and from this address is subject to the North Carolina Public Records Law and may be disclosed to third parties. From: Davis, Brooke A CIV SAW <Brooke.A.Davis@usace.army.mil> Sent: Wednesday, November 30, 2022 2:50 PM To: Tyson Kurtz <tkurtz@enviroscienceinc.com> Cc: Moore, Andrew W <andrew.w.moore@ncdenr.gov> Subject: [External] SAW-2019-00485 Haywood Estates CAUTION: External email. Do not click links or open attachments unless you verify. Send all suspicious email as an attachment to Report Spam. Hi Tyson, I am going through the submittal and have the following questions/comments: 1. It appears that no avoidance and minimization measures have been taken into account with regard to the wetlands onsite. You stated that the development design has not changed since the original submittal; however, the onsite wetlands have. Please advise. 2. Please explain why the access roads cannot be shifted to avoid some of the wetland areas. 3. This design does not show the layout for the residences. Will the wetlands along the western portion of the property be protected from impacts? If so, how? If not, please include those impacts in this submittal. FYI -I am just waiting on our HQ folks to respond about the AJD, then I will get it out to you. Let me know if you have any questions. Thanks, Brooke Brooke Davis Regulatory Specialist USACE Wilmington District -Asheville Regulatory Field Office 151 Patton Avenue, Room 208 Asheville, NC 28801-5006 828-271-7980, ext. 4232 brooke.a.davis@usace.army.mil THIS MESSAGE IS INTENDED ONLY FOR THE PERSONAL AND CONFIDENTIAL USE OF THE INDIVIDUAL OR ENTITY TO WHOM IT IS ADDRESSED AND MAY CONTAIN INFORMATION THAT IS PRIVILEGED, CONFIDENTIAL, AND EXEMPT FROM DISCLOSURE UNDER APPLICABLE LAW. If the reader of this message is not the intended recipient, or the employee or agent responsible for delivering the message to the intended recipient, you are hereby notified that you have received this message in error and that any review, dissemination, distribution, or copying of this communication is strictly prohibited. 3 DocuSign Envelope ID: A0150924-C70B-4BB9-838F-BDE6456F3181 SHEET INDEX SHEET NO. DESCRIPTION C-300-301 C-302-305 GRADING, DRAINAGE AND EROSION CONTROL PLAN GRADING, DRAINAGE AND EROSION CONTROL DETAILS GRADING, DRAINAGE AND EROSION CONTROL PLANS for HAYWOOD PARK SUBDIVISION HENDERSONVILLE HENDERSON COUNTY NORTH CAROLINA S RUGBY RD HAYWOOD KNOLLS DR N RUGBY RD VICINITY MAP N TS HAYWOOD PARK DR SITE HWY 191 DEVELOPMENT BLOCK PROJECT: HAYWOOD PARK ADDRESS: 3676 HAYWOOD ROAD HENDERSONVILLE, NC 28792 OWNER: HAYWOOD PARK, LLC 3872 NW 126 AVE CORAL SPRINGS, FL 33065 DEVELOPER: LUIS GRAEF 4880 N HIATUS RD SUNRISE FL 33351 PIN #s: 9650-06-9662 9650-16-1443 9650-16-3229 9650-16-4056 9650-16-4528 9650-16-5805 9650-17-5207 DB: 3904 PG: 526 ENGINEER: JARED L. DERIDDER, P.E. WGLA ENGINEERING, PLLC 724 5TH AVENUE WEST HENDERSONVILLE NC 28739 828-687-7177 SURVEYOR: ASSOCIATED LAND SURVEYORS, P.C. PO BOX 578, HORSE SHOE, NC 28742 828-890-3507 ZONING: HENDERSON COUNTY — R2 SETBACKS: FRONT: 15' SIDE: 10' REAR: 10' TOTAL PROJECT AREA: 20.39 ACRES ± PROPOSED LOTS : 20 ALLOWABLE DENSITY: 1 UNIT / ACRE PROPOSED DENSITY: 0.98 UNITS / ACRE PROPOSED OPEN SPACE: 2.08 ACRES ± PROPOSED ROADWAYS: 771 LF PROPOSED WATER SYSTEM: PUBLIC — CITY OF HENDERSONVILLE PROPOSED SEWER SYSTEM PUBLIC — BUNCOMBE COUNTY MSD WGLA Engineering WGLA ENGINEERING, PLLC 724 5th AVENUE WEST HENDERSONVILLE, NC 28739 (828) 687-7177 WGLA.COM NC LICENSE P-1342 HAYWOO D PARK SUBDIVISION HENDERSONVILLE HENDERSON COUNTY NORTH CAROLINA \()��� FE .°43° /'% o Q 9�07 ' 0 SEAL = i 041349 i = ''/,, L. DERV \\\\\\ 10/31/2022 REVISIONS DATE DESCRIPTION . -.,,,Iro, Know what's below. CaII before you dig. PROJECT NUMBER: 22130 DATE: 10-31-22 DRAWN BY: JRC CHECKED BY: JLD COVER SCALE: AS NOTED DocuSign Envelope ID: DFD0970E-102C-4683-A9E7-E156752FEC7B EXISTING 60' PUBLIC RIGHT OF WAY HAYWOOD KNOLLS DRIVE EXISTING 100' PUBLIC RIGHT OF WAY z NC 191 HAYWOOD ROAD EXISTING CITY OF HENDERSONVILLE WATER MAIN (TYP) 1 CONSERVING CAROLINA PIN: 9650-05-9838 DB: 28 PG: 552 TIE TO AND EXTEND EXISTING 24" HDPE STORMWATER PIPE PROPOSED ROCK PIPE INLET PROTECTION (TYP) NOTES: 1 PROPOSED REINFORCED TABILIZED/OUTLET #1 PROPOSED REINFORCED STABILIZED OUTLET #5 EXISTING WETLAND (TYP) LOT:16 1.42 AC PROPOSED GRAVITY SEWER MAIN (TYP) PROPOSED REINFORCED 1 STABILIZED OUTLET #2 1 1 PROPOSED REINFORCED STABILIZED OUTLET #8 PROPOSED \ -- REINFORCED STABILIZED OUTLET #7 LOT:10 1.01 AC PROPOSED REINFORCED STABILIZED OUTLET #3 1 PROPOSED REINFORCED STABILIZED OUTLET #4 LOT:11 0.53 AC PROPOSED REINFORCED STABILIZED OUTLET #6 PROPOSED PRIVATE ROAD (TYP) 1.) MEASURES BEYOND THOSE SHOWN ON THE PLANS SHOULD BE APPROVED BY THE OWNER. 2.) CONTRACTOR SHALL OBTAIN A COPY OF THE APPROVED SEDIMENTATION AND EROSION CONTROL PERMIT AND FOLLOW ALL DIRECTIVES. CONTRACTOR SHALL READ AND UNDERSTAND THE NPDES REQUIREMENTS OF THE PERMIT INCLUDING BUT NOT LIMITED TO: - PLACEMENT OF RAIN GAUGE ON THE SITE - INSPECTION OF ALL EROSION CONTROL MEASURES FOLLOWING SPECIFIED RAINFALL EVENTS OR WEEKLY. - UPKEEP OF INSPECTION LOG FOR REVIEW UPON REQUEST BY NCDENR, LOCAL EROSION CONTROL AUTHORITY, OWNER OR ENGINEER. 3.) CONTRACTOR SHALL MAINTAIN ALL EROSION CONTROL MEASURES THROUGHOUT THE LIFE OF THE PROJECT. 4.) THE CONTRACTOR SHALL BE RESPONSIBLE FOR ALL FIELD STAKING NECESSARY FOR THE CONSTRUCTION OF THE PROJECT. THE ENGINEER WILL PROVIDE THE CONTRACTOR WITH AN ELECTRONIC COPY OF THE DESIGN FOR STAKING PURPOSES. HOWEVER ALL ELECTRONIC INFORMATION SHOULD BE COORDINATED WITH THE PLANS. 5.) CONTRACTOR SHALL REMOVE ALL EROSION CONTROL MEASURES AT COMPLETION OF PROJECT, AFTER SITE HAS STABILIZED AND RESTORE TO FINAL GRADE. 6.) ALL STORM DRAINAGE INLETS SHALL HAVE GRAVEL INLET PROTECTION INSTALLED AROUND THEM AS SOON AS THEY ARE INSTALLED. 7.) CONTRACTOR SHALL ENSURE NO SILT ENTERS INTO THE EXISTING STREETS. IF SILT OR DEBRIS ENTERS THE EXISTING STREETS, THEN THE CONTRACTOR MUST IMMEDIATELY REMOVE THE SILT OR DEBRIS AT THE CONTRACTORS EXPENSE. LOT:17 0.88 AC TIE TO AND EXTEND EXISTING 15" HDPE STORMWATER PIPE / EXISTING 45' R/W (HAYWOO[ PRIVATE - PARK DR) LOT:12 0.50 AC PROPOSED RIP RAP OUTLET PROTECTION (TYP) EXISTING PROPERTY BOUNDARY (TYP) _a -EXIS-T1N STREAM (TYP) LOT:13 0.86 AC PROPOSED ASPHALT (TYP) WS-IV EXISTING STREAM BUFFER 30' FROM TOP OF BANK (TYP) PROPOSED REINFORCED STABILIZED OUTLET #9 8.) SURVEY INFORMATION PROVIDED BY: ,/ \ ASSOCIATED LAND SURVEYORS 6475 BREVARD ROAD ETOWAH, NC 28729 (828) 890-3507 9.) UTILITIES MAY BE EXISTING THAT ARE NOT DEPICTED ON THIS PLAN. CONTRACTOR SHALL LOCATE AND FIELD VERIFY ALL EXISTING UTILITIES WITHIN PROJECT AREA. 10.) NO PERSON MAY INITIATE LAND -DISTURBING ACTIVITY BEFORE NOTIFYING THE AGENCY (HENDERSON COUNTY SOIL EROSION AT PHONE NUMBER (828) 694-6251) THAT ISSUED THE EROSION AND SEDIMENTATION PLAN APPROVAL OF THE DATE THAT LAND DISTURBING ACTIVITY WILL BEGIN 11.) A PRE -CONSTRUCTION MEETING IS REQUIRED PRIOR TO LAND DISTURBING ACTIVITY BEGINNING. CONTACT HENDERSON COUNTY SOIL EROSION AT (828) 694-6521. 12.) ANY BORROW OR WASTE SITE USED SHALL BE PROPERLY PERMITTED. 13.) WHENEVER THE SOIL EROSION AND SEDIMENTATION CONTROL ADMINISTRATOR DETERMINES THAT SIGNIFICANT EROSION AND SEDIMENTATION IS OCCURRING AS A RESULT OF LAND -DISTURBING ACTIVITY, DESPITE APPLICATION AND MAINTENANCE OF PROTECTIVE PRACTICES, THE PERSON CONDUCTING THE LAND DISTURBING ACTIVITY WILL BE REQUIRED TO AND SHALL TAKE ADDITIONAL PROTECTIVE ACTION. 14.) NO SLOPES SHALL BE CONSTRUCTED STEEPER THAN A 2:1 AND SLOPES STEEPER THAN A 4:1 SHALL BE SEEDED AND MATTED WITH NORTH AMERICAN GREEN SC-150 OR APPROVED EQUAL. LOT:14 0.82 AC ATCH LINE LOT:15 0.95 AC PROPOSED SWALE #1 PROPOSED SHARED DRIVEWAY FOR THE BENEFIT OF LOTS 14 AND 15. -PROPOSED STORMWATER PIPE (TYP) - PROPOSED SWALE #2 PROPOSED SWALE #3 PROPOSED WATER MAIN (TYP) HENDERSON COUNTY BOARD OF PUBLIC SCHOOLS PIN: 9650-26-2638 DB: 824 PG: 213 GENERAL STORMWATER NOTES: 1.) ALL STORMWATER PIPES SHALL BE HDPE WITH SMOOTH INTERIOR WALL, WITH BELL AND SPIGOT ENDS AND SOIL TIGHT JOINTS, UNLESS OTHERWISE NOTED ON PLANS. 2.) CONTRACTOR TO ENSURE THAT ALL EXISTING AND PROPOSED STORM DRAINAGE STRUCTURES, PIPES AND GRADES WILL PROVIDE POSITIVE DRAINAGE PRIOR TO INSTALLATION. STORMWATER PIPE TABLE PIPE SIZE LENGTH SLOPE MATERIAL A 18 31.54 0.86% HDPE B 15 35.79 1.59% HDPE C 15 116.65 3.49% HDPE D 15 106.81 0.50% HDPE E 24 89.78 0.50% HDPE F 24 35.92 2.21% HDPE STORMWATER STRUCTURE TABLE STRUCTURE DETAILS 1 PIPE A INV = 2106.000 2 PIPE A INV = 2105.730 3 PIPE B INV = 2112.700 4 PIPE B INV = 2112.130 5 PIPE C INV = 2110.410 6 PIPE C INV = 2106.340 7 PIPE D INV = 2102.610 8 PIPE D INV = 2102.080 9 PIPE E INV = 2102.080 10 PIPE E INV = 2101.630 11 PIPE F INV = 2090.940 12 PIPE F INV = 2090.148 + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + CONSTRUCTION SEQUENCE 1. OBTAIN PLAN APPROVAL AND APPLICABLE PERMITS 2. HOLD MANDATORY PRE CONSTRUCTION CONFERENCE. 3. INSTALL RAIN GAUGE. 4. INSTALL PERMIT BOX (INSPECTION REPORTS AND PERMITS TO BE PLACED IN BOX) 5. INSTALL EROSION CONTROL MEASURE AS SHOWN ON APPROVED PLANS. 6. CLEAR AND GRUB AREA FOR STORM DRAINAGE INSTALLATION. 7. CONSTRUCT STORM DRAINAGE SYSTEM. 8. INSTALL ROCK PIPE INLET PROTECTION AROUND EACH CATCH BASIN AND PIPE INLET. 9. FINE GRADE SITE. 10. AFTER SITE IS FINE GRADED, PERMANENT VEGETATION SHALL BE INSTALLED WITHIN 15 WORKING DAYS OR 90 CALENDAR (WHICHEVER IS SHORTER) DAYS ON ALL DISTURBED AREAS AND REMOVE TEMPORARY EROSION CONTROL DEVICES ONCE SITE HAS STABILIZED & APPROVAL HAS BEEN GRANTED BY THE APPROPRIATE AGENCIES. NOTE: CONTRACTOR TO NOTIFY HENDERSON COUNTY EROSION CONTROL OFFICE 24 HOURS PRIOR TO BEGINNING LAND DISTURBANCE. DISTURBED AREA 5.43 AC ± LEGEND EXISTING 2' CONTOURS PROPOSED 2' CONTOURS EXISTING PROPERTY BOUNDARY EXISTING WETLANDS EXISTING STREAM PROPOSED STORMWATER PIPE EXISTING STORMWATER PIPE PROPOSED RIP RAP OUTLET PROTECTION PROPOSED ROCK PIPE INLET PROTECTION PROPOSED SWALE PROPOSED SLOPE MATTING PROPOSED LIMITS OF DISTURBANCE PROPOSED REINFORCED STABILIZED OUTLET PROPOSED SILT FENCE GRAPHIC SCALE ( IN FEET ) 160 320 WGLA Engineering WGLA ENGINEERING, PLLC 724 5th AVENUE WEST HENDERSONVILLE, NC 28739 (828) 687-7177 WGLA.COM NC LICENSE P-1342 HAYWOO D PARK SUBDIVISION HENDERSONVILLE HENDERSON COUNTY NORTH CAROLINA DocuSigned by: �un,ecc. Le,Ridden, ���1111i11,,,, 7,R,, �4F@452eRp/,,, (§`"OFESs/ °�//. SEAL i 1- --1. 1 041349 = 104/ ''/,,� L. DE- �,.\ \ '0, 111111���\ 1/12/2023 REVISIONS DATE DESCRIPTION 12-19-22 REVISION 3 1-12-23 REVISION 6 -..........kliVi- Know what's below. Cali before you dig. PROJECT NUMBER: 22130 DATE: 10-31-22 DRAWN BY: JRC CHECKED BY: JLD GRADING, DRAINAGE AND EROSION CONTROL PLAN 0-300 SCALE: 1 "=40' DocuSign Envelope ID: A0150924-C70B-4BB9-838F-BDE6456F3181 10/31/2022 4,14,52 PM, 00 Grading Drainage ood Crossing F:\USERS\Jared\ i 4- ♦s I FROSTY A SINCLAIR TRUSTEE; FROST A SINCLAIR REVOCABLE TRUST PIN: 9650-06-9940 DB: 1431 PG: 204 EXISTING PRIVATE 45' RIGHT—OF—WAY HAYWOOD PARK DR PROPOSED GRAVITY • SEWER MAIN (TYP) LOT: 7 0.64 AC gg OS all MB Illy ss IS / •- gg� EXISTING CITY OF HENDERSONVILLE WATER MAIN (TYP) cn 0) 0) m PHILIP M RASMUSSEN II PRISCILLA A RASMUSSEN PIN: 9650-16-1982 DB: 1370 PG: 471 PROPOSED ROCK PIPE INLET PROTECTION (TYP) dS dS LOT: 8 0.64 AC PROPOSED REINFORCED STABILIZED OUTLET #10 0. ••- _0 •• 0.•• EXISTING WTLAN D (TYP) dS • 2106x MARSHA A ODOM PIN: 9650-07-9059 DB: 1032 PG: 81 MALINDA H. VERA CRUZ VALEN W. VERA CRUZ PIN: 9650-17-1258 DB: 3581 PG: 72 EXISTING 50' GAS — LINE EASEMENT PER DB 400 PG 373 LOT:18 1.02 AC 2110 Ms 4 wry G STREAM BUFFER OM TOIi OF BANK (TYP) / 0 MATCH LINE maw SEE SHEET C-300 PROPOSED STORMWATER PIPE W/ ROCK PIPE INLET PROTECTION (TYP) EXISTING STREAM (TYP) LOT:19 0.92 AC PROPOSED WATER MAIN (TYP) PROPOSED ASPHALT (TYP 10 I�� RUDD W ORR MARGARET W CHASE PIN: 9650-17-3407 DB: 3339 PG: 327 EXISTING 2' CONTOURS (TYP) -- 5 PROPOSED SWALE #4 PROPOSED REINFORCED STABILIZED OUTLET #11 EXISTING PROPERTY BOUNDARY (TYP) PROPOSED SHARED DRIVEWAY FOR THE BENEFIT OF LOTS 19 AND 20 STORMWATER PIPE TABLE PIPE SIZE LENGTH SLOPE MATERIAL A 18 31.54 0.86% HDPE B 15 35.79 1.59% HDPE C 15 116.65 3.49% HDPE D 15 106.81 0.50% HDPE E 24 89.78 0.50% HDPE F 30 35.92 2.21% HDPE STORMWATER STRUCTURE TABLE STRUCTURE DETAILS 1 PIPE A INV = 2106.000 2 PIPE A INV = 2105.730 3 PIPE B INV = 2112.700 4 PIPE B INV = 2112.130 5 PIPE C INV = 2110.410 6 PIPE C INV = 2106.340 7 PIPE D INV = 2102.610 8 PIPE D INV = 2102.080 9 PIPE E INV = 2102.080 10 PIPE E INV = 2101.630 11 PIPE F INV = 2090.940 12 PIPE F INV = 2090.148 RONALD E BUSH JOYCE R BUSH PIN: 9650-17-4702 DB: 534 PG: 389 LOT: 20 1.13 AC \— HENDERSON COUNTY BOARD OF PUBLIC SCHOOLS PIN: 9650-26-2638 DB: 824 PG: 213 I O 1+.+.+.+.+++++ ......***+++++ 80 RSO DISTURBED AREA 5.43 AC ± LEGEND EXISTING 2' CONTOURS PROPOSED 2' CONTOURS EXISTING PROPERTY BOUNDARY EXISTING WETLANDS EXISTING STREAM PROPOSED STORMWATER PIPE EXISTING STORMWATER PIPE PROPOSED PROPOSED PROPOSED PROPOSED PROPOSED PROPOSED RIP RAP OUTLET PROTECTION ROCK PIPE INLET PROTECTION SWALE SLOPE MATTING LIMITS OF DISTURBANCE REINFORCED STABILIZED OUTLET GRAPHIC SCALE 0 40 80 160 320 ( IN FEET ) WGLA Engineering WGLA ENGINEERING, PLLC 724 5th AVENUE WEST HENDERSONVILLE, NC 28739 (828) 687-7177 WGLA.COM NC LICENSE P-1342 HAYWOO D PARK SUBDIVISION HENDERSONVILLE HENDERSON COUNTY NORTH CAROLINA 3 un tt LeRi dden, SEAL = 0 041349 g = ,,, p ;0G I NE 0�)��\ ''"/ 9 L. DE\ \,.\ `. 10/31/2022 REVISIONS DATE DESCRIPTION INSIV. Know what's below. Cali before you dig. PROJECT NUMBER: 22130 DATE: 10-31-22 DRAWN BY: JRC CHECKED BY: JLD GRADING, DRAINAGE AND EROSION CONTROL PLAN 0-301 SCALE: 1 "=40' DocuSign Envelope ID: DFD0970E-102C-4683-A9E7-E156752FEC7B 6.06 TEMPORARY GRAVEL CONSTRUCTION ENTRANCE/EXIT Sediment Fence (Silt Fence) GENERAL CONSTRUCTION NOTES 1. All work and construction activities on the project site shall comply with all applicable OSHA regulations and requirements. It is the Contractors responsibility to maintain a safe work site. 2. The Engineer and Owner reserve the right to modify project work items including grading) as deemed necessary for the uccessful completion of the project. The Contractor may suggest adjustments to grading or other work items to be approved- by he Engineer or Owner. 3. The Contractor shall comply with the Geotechnical Report for the placement of fill and compaction requirements. If no report is available, the following minimum standards shall apply: Placement of fill: A. Place the material in successive horizontal layers not exceeding 8" for the full width of the cross section. B. Fill shall be placed only when it is within 3% of its optimum moisture content as determined by a Standard Proctor ASTM D 698. C. Each layer of fill shall be spread evenly and shall be compacted to its specified density as determined by Standard Proctor ASTM D 698 before new layers are placed and compacted. D. Sloped ground surfaces steeper than one vertical to four horizontal, on which fill is to be placed, shall be stepped or benched such that fill material will bond to the existing surfaces. E. Embankment slopes shall be constructed by filling one (1) foot beyond the proposed finished slope surface for each lift. Compaction equipment shall work to the edge of each lift. After the entire fill is placed and compact- ed, the outside foot of the slope shall be trimmed to the design slope with a dozer. Unless indicated on the drawings, no fill slopes shall be steeper than 2 horizontal to 1 vertical. Compaction: A. Structural Fill Under Buildings and Within 10' of Building Perimeter: 100% of Standard Proctor the entire depth of fill. B. Under Walks, Drives, Pads, and Paved Areas: 95% of Standard Proctor except 100% of Standard Proctor in the upper 2'. C. Under Lawns and Planting Areas Beyond 10' from Building: 95% of Standard Proctor D. Backfill in Trenches: Comply with compaction requirements for the area through which the trench runs. 4. All erosion control devices such as silt fences, diversions, sediment traps, etc. shall be maintained in workable conditions for the life of the project and, shall be removed at the completion of the project only with the engineer s approval. See the NPDES requirements on this plan sheet for more detail. If during the life of the project a stprm causes poll erosion which changes the finished grades or creates gullies and washed areas , these shall be repaired by the Contractor at no extra cost. The Contractor shall adhere to the approved erosion control plan and take any additional measures necessary to prevent sediment from leaving the site. 5. Disposable Materials: A. Clearing and grubbing wastes shall be removed from the site and properly disposed of by the contractor at their expense, unless otherwise specified. B. Solid wastes to be removed such as sidewalks, curbs,pavement,etc. maybe placed in specified disposal areas if permitted by the apropriate agencies and approved by the Owner. This material shall be spread and mixed with dirt eliminating all voids. This material shall have a minimum cover of 2. The Contractor shall maintain specified compaction requirements in these areas. When disposal sites are not provided, the Contractor shall remove this waste from the site and properly dispose of it at their expense. C. Abandoned utilities such as culverts, water pipe, hydrants, casting, pipe appurtenances, utility poles, etc. shall be the property of the specified utility agency or company having jurisdiction. Before the Contractor can remove, destroy, salvage, re -use, sell or store for their own use any abandoned utility, they must present to the owner written permission from the utility involved. D. Unless otherwise noted on the plans, burning will not be allowed on this project. Should burning be allowed by the owner, it is the Contractor's responsibility to obtain all necessary permits (at their expense) and follow all applicable rules and regulations. 6. Unless otherwise specified, all base, paving, curbing and other concrete work shall conform to the local municipality or NCDOT specifications for construction. All water and sewer construction shall conform to the local utility requirements and/or the NCDENR minimum standards. 7. In the event excessive ground water or springs are encountered within the limits of construction, the Contractor shall install necessary underdrains and stone as directed by the Engineer. All work shall be paid based upon the unit prices unless otherwise specified. 8. The Contractor is responsible for the coordination of adjustment of all utility surface accesses (including manhole covers, valve boxes, etc.) whether he performs the work or the utility company performs the work. 9. The Contractor shall control all "dust" by periodic watering and shall provide access at all times for property owners within the project and for emergency vehicles. All open ditches and hazardous areas shall be clearly marked in accordance with OSHA regulations. 10. All areas of exposed soil shall be seeded, fertilized and mulched according to the specifications. The finished surface shall be to crade and smooth, free of all rocks larger than 3", equipment tracks, cirt clods, bumps, ridges, an11 gouges prior to seedinc. The surface shall be loosened to a depth of 1' +/- to accept seed. The Contractor shall not proceed with seeding operations without first obtaining the Engineer's approval of ,the graded su,Uface. All seeding .shall be performed by a mechanical hydro -seeder . The Engineer prior to seeding must approve hand seeding on any area. 11. Graded slopes and fills shall be protected with rolled erosion control product if completed outside of optimum germination season when unfavorable weather conditions prevent establishment of vegetative ground cover. Definition A graveled area or pad located at points where vehicles enter and leave a con- struction site. Purpose To provide a buffer area where vehicles can drop their mud and sediment to avoid transporting it onto public roads, to control erosion from surface runoff, and to help control dust. Conditions Where Wherever traffic will be leaving a construction site and moving directly onto a Practice Applies public road or other paved off -site area. Construction plans should limit traffic to properly constructed entrances. Design. Criteria Aggregate Size -Use 2-3 inch washed stone. Dimensions of gravel pad - Thickness: 6 inches minimum Width: 12-ft minimum or full width at all points of the vehicular entrance and exit area, whichever is greater Length: 50-ft minimum Location -Locate construction entrances and exists to limit sediment from leaving the site and to provide for maximum utility by all construction vehicles (Figure 6.06a). Avoid steep grades and entrances at curves in public roads. so, 6" min GEOTEXTILE FABRIC 2-3" BENEATH STONE coarse aggregate Figure 6.06a Gravel entrance/exit keeps sediment from leaving the construction site (modified from Va SWCC). MAINTENANCE: MAINTAIN THE GRAVEL PAD IN A CONDITION TO PREVENT MUD OR SEDIMENT FROM LEAVING THE CONSTRUCTION SITE. THIS MAY REQUIRE PERIODIC TOP DRESSING WITH 2 INCH STONE. AFTER EACH RAINFALL, INSPECT ANY STRUCTURE USED TO TRAP SEDIMENT AND CLEAN IT OUT AS NECESSARY. IMMEDIATELY REMOVE ALL OBJECTIONABLE MATERIALS SPILLED, WASHED, OR 6.06.1 Any outlet where storm flow bypass occurs must be stabilized against Reinforced, erosion. Stabilized Outlets Set outlet elevation so that water depth cannot exceed 1.5 ft at the lowest point along the fenceline. Set fabric height at 1 ft maximum between support posts spaced no more than 3 ft apart. Install a horizontal brace between the support posts to serve as an overflow and to support top of fabric. Provide a riprap splash pad. Excavate foundation for the splash pad a minimum 5 ft wide, 1 ft deep, and 5 ft long on level grade. The finished surface of the riprap should blend with surrounding area, allowing no overfall. The area around the pad must be stable. 4' max. 5min. Place posts 8' max at low points 1i,11 ii I I1o++,91 ' 3N1 Perspective of reinforced stabilized outlet for sediment fence. Construction Dig a trench approximate 8 inches deep and 4 inches wide, or a V-trench, in the line of the fence. TRACKED ONTO PUBLIC ROADWAYS. Drive posts securely, at lest 18 inches into the ground, on the down slope side of the trench. Space posts a maximum of without support wire. Adjust spacing to place posts at low points along the fence line. fasten support wire fence to upslope side of posts, extending 6 inches into the trench. Attach continuous length of fabric to upslope side of fence posts. Avoid joints, particularly at low points in the fence line. Where joints are necessary, fasten fabric securely to support posts and overlap to the next post. No. 57 Washed Stone Vpe pit Support wire Filter fabric 5 dAVIVeViiM II III II IIGI I1. I �II II1EIf� : (�:'' g s = J1L.. '!�i i all - - e vurmu II II I � II-11 II II II u� 9116" wire below ground 01.11 Post 18' deep min. wfw ee I=Irgui HI II 8 Rip Rap on Level grape liter Fabric 14" 1-11 1111 •.'. fo IIQII'�I--TII �I, 'Wm* II. /II--11*11-11 1 V-trench with grav Detail of sediment fence Installation Place the bottom 1 ft of fabric in 8-inch deep trench lapping toward the upslope side. Backfill with compacted earth or gravel as shown in Figure 6.62d. To reduce maintenance, excavate a shallow sediment storage area on upslope side of fence where sedimentation is expected. Provide good access to deposition areas for cleanout and maintenance. Allow for safe bypass of storm flow to prevent overtopping failure of fence. DO NOT install sediment fence across intermittent or permanent streams, channels, or any location where concentrated flow is anticipated. MAINTENANCE: INSPECT SEDIMENT FENCES A T LEAST ONCE A WEEK AND AFTER EACH RAINFALL. MAKE ANY REQUIRED REPAIRS IMMEDIATELY.SHOULD THE FABRIC OF A SEDIMENT FENCE COLLAPSE, TEAR, DECOMPOSE OR BECOME INEFFECTIVE, REPLACE IT PROMPTLY.REMOVE SEDIMENT DEPOSIT AS NECESSARY TO PROVIDE ADEQUATE STORAGE VOLUME FOR THE NEXT RAIN AND TO REDUCE PRESSURE ON THE FENCE. TAKE CARE TO AVOID UNDERMINING THE FENCE DURING CLEANOUT. REMOVE ALL FENCING MATERIALS AND UNSTABLE SEDIMENT DEPOSITS AND BRING THE AREA TO GRADE AND STABILIZE IT AFTER THE CONTRIBUTING DRAINAGE AREA HAS BEEN PROPERLY STABILIZED. ULTRAVIOLET RESISTANT (BLACK) MIRIFI FARBIC OR EQUIVALENT SECURED TO WIRE WITH PLASTIC OR WIRE TIES AT 12" ON CENTER MAXIMUM SEDIMENT STORAGE ELEVATION: 9" REMOVE SEDIMENT WHEN THIS LEVEL IS REACHED OR AS DIRECTED BY THE CONSTRUCTION INSPECTOR NATURAL GRADE (SHEET FLOW ONLY) 14 GAUGE 6"X6" (MAX OPENING) WELDED WIRE HOOKED ONTO PREFORMED CHANNELS ON METAL POSTS 4" WIDE X 8" DEEP TRENCH UP SLOPE OF SILT FENCE. CARRY 12"-18" OR FABRIC AND WIRE INTO TRENCH, COVER WITH SOIL AND TAMP BACKFILL MATERIALS 1. USE A SYNTHETIC FILTER FABRIC OF AT LEAST 95% BY WEIGHT OF POLYOLEFINS OR POLYESTER, WHICH IS CERTIFIED BY THE MANUFACTURER OR SUPPLIER AS CONFORMING TO THE REQUIREMENTS IN ASTM D 6461, WHICH IS SHOWN IN PART IN TABLE 6.62B. 2. ENSURE THAT POSTS FOR SEDIMENT FENCES ARE 1.25 LB/LINEAR FT MINIMUM STEEL WITH A MINIMUM LENGTH OF 5 FEET. MAKE SURE THAT STEEL POSTS HAVE PROJECTIONS TO FACILITATE FASTENING THE FABRIC. 3. FOR REINFORCEMENT OF STANDARD STRENGTH FILTER FABRIC, USE WIRE FENCE WITH A MINIMUM 14 GAUGE AND A MAXIMUM MESH SPACING OF 6 INCHES. TEMPORARY SILT FENCE MATERIAL PROPERTY REQUIREMENTS 6.62b TEST MATERIAL UNITS SUPPORTED SILT FENCE UN -SUPPORTED SILT FENCE (1) TYPE OF VALUE GRAB STRENGTH ASTM D 4632 N (LBS) MACHINE DIRECTION 400 550 MARV (90) (90) X-MACHINE DIRECTION 400 450 MARV (90) (90) PERMITTIVITY (2) ASTM D 4491 sec-1 0.05 0.05 MARV APPARENT OPENING SIZE (2) ASTM D 4751 MM 0.60 0.60 MAX ARV (3) (US SIEVE #) (30) (30) ULTRAVIOLET STABILITY ASTM D 4355 % RETAINED STRENGTH 70% AFTER 500H OF EXPOSURE 70% AFTER 500H OF EXPOSURE TYPICAL (1) SILT FENCE SUPPORT SHAI I. CONSIST OF 14 GAGE STEEL WIRE WITH A MESH SPACING OF 150 MM (6 INCHFS). OR PREFABRICATED POVI MER MESH OF EQUIVALENT STRENGTH. (2) THESE DEFAUI T VALUES ARE BASED ON EMPIRICAL EVIDENCE WITH A VARIETY OF SEDIMENT. FOR ENVIRONMENTAI I.V SENSITIVE AREAS, A REVIEW OF PREVIOUS EXPERIENCE AND/OR SITE OR REGIONALLY SPECIFIC GEOTEXTILE TESTS IN ACCORDANCE WITH TEST METHOD D 5141 SHOULD RE PERFORMED BY THE AGENCY TO CONFIRM SUITABILITY OF THESE REQUIREMENTS. (3) AS MEASURED IN ACCORDANCE WITH TEST METHOD D 4632. CONSTRUCTION 1. CONSTRUCT THE SEDIMENT BARRIER OF STANDARD STRENGTH OR EXTRA STRENGTH SYNTHETIC FILTER FABRICS. 2. ENSURE THAT THE HEIGHT OF THE SEDIMENT FENCE DOES NOT EXCEED 24 INCHES ABOVE THE GROUND SURFACE. 3. CONSTRUCT THE FILTER FABRIC FROM A CONTINUOUS ROLL CUT TO THE LENGTH OF THE BARRIER TO AVOID JOINTS. WHEN JOINTS ARE NECESSARY, SECURELY FASTEN THE FILTER CLOTH ONLY AT A SUPPORT POST WITH 4 FEET MINIMUM OVERLAP TO THE NEXT POST. 4. SUPPORT STANDARD STRENGTH FILTER FABRIC BY WIRE MESH FASTENED SECURELY TO THE UPSLOPE SIDE OF THE POSTS. EXTEND THE WIRE MESH SUPPORT TO THE BOTTOM OF THE TRENCH. FASTEN THE WIRE REINFORCEMENT, THEN FABRIC ON THE UPSLOPE SIDE OF THE FENCE POST. WIRE OR PLASTIC ZIP TIES SHOULD HAVE MINIMUM 50 POUND TENSILE STRENGTH. 5. WHEN A WIRE MESH SUPPORT FENCE IS USED, SPACE POSTS A MAXIMUM OF 8 FEET APART. SUPPORT POSTS SHOULD BE DRIVEN SECURELY INTO THE GROUND A MINIMUM OF 24 INCHES. 6. EXTRA STRENGTH FILTER FABRIC WITH 6 FEET POST SPACING DOES NOT REQUIRE WIRE MESH SUPPORT FENCE. SECURELY FASTEN THE FILTER FABRIC DIRECTLY TO POSTS. WIRE OR PLASTIC ZIP TIES SHOULD HAVE MINIMUM 50 POUND TENSILE STRENGTH. 7. EXCAVATE A TRENCH APPROXIMATELY 4 INCHES WIDE AND 8 INCHES DEEP ALONG THE PROPOSED LINE OF POSTS AND UPSLOPE FROM THE BARRIER. 8. PLACE 12 INCHES OF THE FABRIC ALONG THE BOTTOM AND SIDE OF THE TRENCH. 9. BACKFILL THE TRENCH WITH SOIL PLACED OVER THE FILTER FABRIC AND COMPACT. THOROUGH COMPACTION OF THE BACKFILL IS CRITICAL TO SILT FENCE PERFORMANCE. 10. DO NOT ATTACH FILTER FABRIC TO EXISTING TREES. INSTALLATION 1. THE BASE OF BOTH END POSTS SHOULD BE AT LEAST ONE FOOT HIGHER THAN THE MIDDLE OF THE FENCE. CHECK WITH A LEVEL IF NECESSARY. 2. INSTALL POSTS 4 FEET APART IN CRITICAL AREAS AND 6 FEET APART ON STANDARD APPLICATIONS. 3. INSTALL POSTS 2 FEET DEEP ON THE DOWNSTREAM SIDE OF THE SILT FENCE, AND AS CLOSE AS POSSIBLE TO THE FABRIC, ENABLING POSTS TO SUPPORT THE FABRIC FROM UPSTREAM WATER PRESSURE. 4. INSTALL POSTS WITH THE NIPPLES FACING AWAY FROM THE SILT FABRIC. 5. ATTACH THE FABRIC TO EACH POST WITH THREE TIES, ALL SPACED WITHIN THE TOP 8 INCHES OF THE FABRIC. ATTACH EACH TIE DIAGONALLY 45 DEGREES THROUGH THE FABRIC, WITH EACH PUNCTURE AT LEAST 1 INCH VERTICALLY APART. ALSO, EACH TIE SHOULD BE POSITIONED TO HANG ON A POST NIPPLE WHEN TIGHTENED TO PREVENT SAGGING. 6. WRAP APPROXIMATELY 6 INCHES OF FABRIC AROUND THE END POSTS AND SECURE WITH 3 TIES. 7. NO MORE THAN 24 INCHES OF A 36 INCH FABRIC IS ALLOWED ABOVE GROUND LEVEL. 8. THE INSTALLATION SHOULD BE CHECKED AND CORRECTED FOR ANY DEVIATIONS BEFORE COMPACTION. 9. COMPACTION IS VITALLY IMPORTANT FOR EFFECTIVE RESULTS. COMPACT THE SOIL IMMEDIATELY NEXT TO THE SILT FENCE FABRIC WITH THE FRONT WHEEL OF THE TRACTOR, SKID STEER, OR ROLLER EXERTING AT LEAST 60 POUNDS PER SQUARE INCH. COMPACT THE UPSTREAM SIDE FIRST, AND THEN EACH SIDE TWICE FOR A TOTAL OF 4 TRIPS. MAINTENANCE 1. INSPECT SEDIMENT FENCES AT LEAST ONCE A WEEK AND AFTER EACH RAINFALL. MAKE ANY REQUIRED REPAIRS IMMEDIATELY. 2. SHOULD THE FABRIC OF A SEDIMENT FENCE COLLAPSE, TEAR, DECOMPOSE OR BECOME INEFFECTIVE, REPLACE IT PROMPTLY. 3. REMOVE SEDIMENT DEPOSITS AS NECESSARY TO PROVIDE ADEQUATE STORAGE VOLUME FOR THE NEXT RAIN AND TO REDUCE PRESSURE ON THE FENCE. TAKE CARE TO AVOID UNDERMINING THE FENCE DURING CLEANOUT. 4. REMOVE ALL FENCING MATERIALS AND UNSTABLE SEDIMENT DEPOSITS AND BRING THE AREA TO GRADE AND STABILIZE IT AFTER THE CONTRIBUTING DRAINAGE AREA HAS BEEN PROPERLY STABILIZED. SILT FENCE NOT TO SCALE 1 OF 3 SILT FENCE NOT TO SCALE 2 OF 3 SILT FENCE NOT TO SCALE 3 OF 3 FILTER FABRIC LA SECTION VIEW OUTLET PROTECTION N.T.S. CLASS I RIP/RAP DEPTH = 1 1/2 TIMES THE MAXIMUM STONE DIAMETER, (d MAX), NOT LESS THAN 6". RIP -RAP APRON 0 NO. D LA d50 SIZE 2 18" 10' 9" 4 15" 10' 9" 10 24" 14' 9" 12 30" 16' 9" 0 LA PLAN VIEW NOTES d50 = MEDIAN STONE SIZE dMAX = 1.5 X d50 NOTE: ALL SWALES TO BE SEEDED PRIOR TO PLACEMENT OF MATTING. SWALE WILL BE CONSIDERED STABILIZED ONCE GRASS IS ESTABLISHED IN SWALE. J 2.1 6' 1' PERMANENT SWALES 1-3 LINER: PROPEX LANDLOK 435 NOT TO SCALE J 2.1 6' 1' PERMANENT SWALE 4 LINER: NAG C125 NOT TO SCALE ANCHOR MATTING IN 8" TRENCH 1' MIN. I I SMOOTH SURFACE, REMOVE ALL DEBRIS AND SEED/MULCH BEFORE PLACING MATTING NOTE: MATTING SHALL BE COIR FIBER, 750 GRAM PER SQ. METER WITH NOMINAL 0.50 IN. OPENING SIZE. MATTING PLACED FLUSH WITH BANK SURFACE, LAP OVER DOWNSTREAM/DOWN SLOPE SEAMS MATTING ANCHORED 1' BELOW STREAM OR WETLAND BED 12" WOOD STAKE PLACED IN 3' O.C. DIAMOND PATTERN STREAM BED EXTEND MATTING A MIN. OF 6" BELOW WETLAND BED. STREAM BANK RESTORATION DETAIL NOT TO SCALE WGLA Engineering WGLA ENGINEERING, PLLC 724 5th AVENUE WEST HENDERSONVILLE, NC 28739 (828) 687-7177 WGLA.COM NC LICENSE P-1342 HAYWOO D PARK SUBDIVISION HENDERSONVILLE HENDERSON COUNTY NORTH CAROLINA = , -DocuSignedt�by:p Jared �t d den, \\\ 111111111///, O OFESSj�'o�ij�: SEAL i 041349 = ''/,,/3L. DE11RV �,.\ \. '///111111`\ 1/12/2023 REVISIONS DATE DESCRIPTION 1-12-23 REVISION 6 . -......1v, Know what's below. Call before you dig. PROJECT NUMBER: 22130 DATE: 10-31-22 DRAWN BY: JRC CHECKED BY: JLD GRADING, DRAINAGE, AND EROSION CONTROL DETAILS 0-302 SCALE: AS NOTED DocuSign Envelope ID: A0150924-C70B-4BB9-838F-BDE6456F3181 RECOMMENDED MINIMUM TRENCH WIDTHS SEEDING SPECIFICATION I. TEMPORARY COVER A. LIME & FERTILIZER CONTRACTOR SHALL FURNISH AND APPLY LIME AND FERTILIZER TO THE SOIL AS REQUIRED TO PROVIDE SATISFACTORY CONDITIONS FOR SEED GERMINATION. AN APPLICATION RATE OF 2000 LBS PER ACRE OF AN APPLICATION RATE OF 2000 LBS PER ACRE OF GROUND AGRICULTURAL LIME AND 750 LBS/ACRE OF FERTILIZER (10-10-10). THESE MATERIALS SHALL BE SPREAD UNIFORMLY OVER THE AREA TO BE PLANTED. THE SOIL SHALL BE TILLED TO A DEPTH OF 3 - 4 INCHES WITH EQUIPMENT APPROVED BY THE ENGINEER. B. TEMPORARY COVER SEEDING - CONTRACTOR SHALL SELECT A QUICK GROWING GRASS WITH HIGH SEEDING VIGOR THAT IS SUITED TO THE AREA, THE TIME OF PLANTING, AND THAT WILL NOT INTERFERE WITH PLANT TO BE SOWN LATER FOR PERMANENT COVER. MAY THROUGH AUGUST SUNDANGRASS 50 LB / AC OR GERMAN MILLET 40 LB / AC SEPT. THROUGH APRIL RYEGRAIN 120 LB / AC ALL SEEDS SHALL HAVE BEEN TESTED NOT MORE THAN 6 MONTHS PRIOR TO THE DATE OF SEEDING. CONTRACTORS SHALL APPLY SEED UNIFORMLY BY HAND, CYCLONE SEEDER, DRILL, CULTIPACKER SEEDER, OR HYDRAULICALLY. A SLURRY MIXTURE OF WATER, FERTILIZER, SEED AND CELLULOSE FIBER MULCH IS ACCEPTABLE ON THIS PROJECT. C. MULCHING IN ORDER TO REDUCE DAMAGE FROM WATER RUN-OFF AND IMPROVE MOISTURE CONDITIONS FOR SEEDLINGS, A MULCH MATERIAL SHALL BE FURNISHED WHEN TEMPORARY SEEDING IS TO BE DONE. ACCEPTABLE MATERIALS ARE: - DRY UNCHOPPED, UNWEATHERED SMALL GRAIN STRAW OR HAY FREE OF SEEDS OF COMPETING PLANTS - 1-2 TONS / ACRE - WOOD FIBER (EXCELSIOR) - WOOD CELLULOSE FIBER - 500 LBS / ACRE WITHOUT STRAW - JUTE MATTING II. PERMANENT COVER A. CONTRACTOR SHALL FURNISH AND APPLY 1-90 LBS / 1000 SF OF GROUND AGRICULTURAL LIME (2 TONS / ACRE) 2-25 LBS / 1000 SF OF FERTILIZER (10-10-10)(1000 LBS / ACRE) AND 3-4.6 LBS / 1000 SF OF KENTUCKY 31 TALL FESCUE (200 LBS / ACRE) IN THE MANNER DESCRIBED ABOVE IN PARTS 1, 2 AND 3. APPLY NURSE CROP AS FOLLOWS: MAY 1 - AUG 15 - 10 LBS / AC GERMAN MILLET OR - 15 LBS / AC SUNDANGRASS AUG 15 - MAY 1 - 40 LBS / AC RYE (GRAIN) B. SEEDING DATES: KY.31 TALL FESCUE (BELOW 2500' ELEV) AUG 20 - SEPT 15 MARCH 1 - MAY 1 (ABOVE 2500' ELEV) JULY 15 - AUG 30 MARCH 5 - MAY 15 C. MULCHING APPLY 4000 LB / AC OF GRAIN STRAW SUITABLY TACKED DOWN. ADD NETTING TO SEEP SLOPES AND STAPLE PER MANUFACTURERS RECOMMENDATIONS III. SOIL PREPARATION A. GENERAL REQUIREMENTS 1-PREPARATION FOR PRIMARY/PERMANENT STABILIZATION SHALL NOT BEGIN UNTIL ALL CONSTRUCTION AND UTILITY WORK WITHIN THE PREPARATION AREA IS COMPLETE. HOWEVER, IT MAY BE NECESSARY TO PREPARE FOR NURSE CROPS PRIOR TO COMPLETION OF CONSTRUCTION AND INSTALLATION OF UTILITIES. 2-A NORTH CAROLINA DEPARTMENT OF AGRICULTURE SOILS TEST (OR EQUAL) SHALL BE OBTAINED FOR ALL AREAS TO BE SEEDED, SPRIGGED, SODDED OR PLANTED. RECOMMENDED FERTILIZER AND pH ADJUSTING PRODUCTS SHALL BE INCORPORATED INTO THE PREPARED AREAS AND BACKFILL MATERIAL PER THE TEST. 3-ALL AREAS TO BE SEEDED OR PLATED SHALL BE TILLED OR RIPPED TO A DEPTH OF 4". RIPPING CONSISTS OF CREATING FISSURES IN A CRISS-CROSS PATTERN OVER THE ENTIRE SURFACE AREA USING AN IMPLEMENT THAT WILL NOT GLAZE THE SIDE WALLS OF THE FISSURES. SITE PREPARATION THAT DOES NOT COMPLY WITH THESE DOCUMENTS SHALL NOT BE ACCEPTABLE. THE DEPTH OF SOIL PREPARATION MAY BE ESTABLISHED AS A RANGE BASED ON THE APPROVAL OF THE REVIEW AGENCY. ONCE TILLED OR RIPPED ACCORDING TO THE APPROVED PLAN, ALL AREAS ARE TO BE RETURNED TO FINAL GRADE. pH MODIFIERS AND/OR OTHER SOIL AMENDMENTS SPECIFIED IN THE SOIL TESTS CAN BE ADDED DURING THE SOIL PREPARATION PROCEDURE OR AS DESCRIBED BELOW. 4-ALL STONES LARGER THAN 3" ON ANY SIDE, STICKS, ROOTS, AND OTHER EXTRANEOUS MATERIALS THAT SURFACE DURING THE BED PREPARATION SHALL BE REMOVED. B. AREAS TO BE SEEDED 1-TILL OR DISC THE PREPARED AREAS TO BE SEEDED TO A MINIMUM DEPTH OF 4". REMOVE STONES LARGER THAN 3" ON ANY SIDE, STICKS, ROOTS, AND OTHER EXTRANEOUS MATERIALS THAT SURFACE. IF NOT INCORPORATED IN THE RIPPING PROCESS, ADD pH MODIFIERS AND FERTILIZERS AT THE RATE SPECIFIED. 2-RECOMPACT THE AREA UTILIZING A CULTIPACKER ROLLER. THE FINISHED GRADE SHALL BE SMOOTH EVEN SOIL SURFACE WITH LOOSE, UNIFORMLY FINE TEXTURE. ALL RIDGES AND DEPRESSIONS SHALL BE REMOVED AND FILLED TO PROVIDE THE APPROVED SURFACE DRAINAGE. SEEDING THE GRADED AREAS IS TO BE DONE IMMEDIATELY AFTER FINISHED GRADES ARE OBTAINED AND SEEDBED PREPARATION IS COMPLETE. C. AREAS TO BE SPRIGGED, SODDED, AND/OR PLANTED 1-AT THE TIME OF PLANTING, TILL OR DISC THE PREPARED AREA TO A DEPTH OF 4"-6" BELOW THE APPROVED FINISHED GRADE. REMOVE ALL STONES LARGER THAN 3" ON ANY SIDE, STICKS, ROOTS AND OTHER EXTRANEOUS MATERIALS THAT SURFACE. IF NOT INCORPORATED DURING THE RIPPING PROCESS, ADD pH MODIFIERS, FERTILIZER AND OTHER RECOMMENDED SOIL AMENDMENTS. 2-RECOMPACT THE AREA UTILIZING A CULTIPACKER ROLLER AND PREPARE FINAL GRADES AND DESCRIBED ABOVE. INSTALL SPRIGS, SOD AND PLANTS AS DIRECTED IMMEDIATELY AFTER FINE GRADING IS COMPLETE. MULCH, MAT AND/OR TACK AS SPECIFIED. MIN. COVER TO RIGID PAVEMENT, H SPRINGLINE 4" FOR 12"-24" PIPET 6" FOR 30"-60" PIPE NOTES: MIN. TRENCH WIDTH (SEE TABLE) FINAL BACKFILL MIN. COVER TO FLEXIBLE PAVEMENT, INITIAL BACKFILL HAUNCH BEDDING SUITABLE FOUNDATION PIPE DIAM. MIN. TRENCH WIDTH 4" 21" (100mm) (533mm) 6" 23" (150mm) (584mm) 8" 26" i(200mm) (660mm) 10" 28" (250mm) (711 mm) 12" 30" (300mm) (762mm) 15" 34" (375mm) (864mm) 18" 39" (450mm) (991mm) 24" 48" (600mm) (1219mm) 30" 56" (750mm) (1422mm) 36" 64" (900mm) (1626mm) 42" 72" (1050mm) (1829mm) 48" 80" (1200mm) (2032mm) 60" 96" (1500mm) (2438mm) 1. ALL PIPE SYSTEMS SHALL BE INSTALLED IN ACCORDANCE WITH ASTM D2321, "STANDARD PRACTICE FOR UNDERGROUND INSTALLATION OF THERMOPLASTIC PIPE FOR SEWERS AND OTHER GRAVITY FLOW APPLICATIONS", LATEST ADDITION 2. MEASURES SHOULD BE TAKEN TO PREVENT MIGRATION OF NATIVE FINES INTO BACKFILL MATERIAL, WHEN REQUIRED. 3. FOUNDATION: WHERE THE TRENCH BOTTOM IS UNSTABLE, THE CONTRACTOR SHALL EXCAVATE TO A DEPTH REQUIRED BY THE ENGINEER AND REPLACE WITH SUITABLE MATERIAL AS SPECIFIED BY THE ENGINEER. AS AN ALTERNATIVE AND AT THE DISCRETION OF THE DESIGN ENGINEER, THE TRENCH BOTTOM MAY BE STABILIZED USING A GEOTEXTILE MATERIAL. 4. BEDDING: SUITABLE MATERIAL SHALL BE CLASS I, II OR III. THE CONTRACTOR SHALL PROVIDE DOCUMENTATION FOR MATERIAL SPECIFICATION TO ENGINEER. UNLESS OTHERWISE NOTED BY THE ENGINEER, MINIMUM BEDDING THICKNESS SHALL BE 4" (100mm) FOR 4"-24" (100mm-600mm); 6" (150mm) FOR 30"-60" (750mm-1500mm). 5. INITIAL BACKFILL: SUITABLE MATERIAL SHALL BE CLASS I, II OR III IN THE PIPE ZONE EXTENDING TO THE CROWN OF PIPE. THE CONTRACTOR SHALL PROVIDE DOCUMENTATION FOR MATERIAL SPECIFICATION TO ENGINEER. MATERIAL SHALL BE INSTALLED AS REQUIRED IN ASTM D2321, LATEST EDITION. 6. MINIMUM COVER: MINIMUM COVER, H, IN NON -TRAFFIC APPLICATIONS (GRASS OR LANDSCAPE AREAS) IS 12" FROM THE TOP OF PIPE TO GROUND SURFACE. ADDITIONAL COVER MAY BE REQUIRED TO PREVENT FLOTATION. FOR TRAFFIC APPLICATIONS, MINIMUM COVER, H, IS 12" UP TO 48" DIAMETER PIPE AND 24" OF COVER FOR 60" DIAMETER PIPE, MEASURED FROM TOP OF PIPE TO BOTTOM OF FLEXIBLE PAVEMENT OR TO TOP OF RIGID PAVEMENT. FOR TRAFFIC APPLICATIONS WITH LESS THAN FOUR FEET OF COVER, EMBEDMENT OF THE PIPE SHALL BE USING ONLY A CLASS I OR CLASS II BACKFILL. MINIMUM RECOMMENDED COVER BASED ON VEHICLE LOADING CONDITIONS** SURFACE LIVE LOADING CONDITION HEAVY CONSTRUCTION PIPE DIAM. H-25 (75T AXLE LAOD) * 12" - 48" 12" 48" (300mm - 1200mm) (305mm) (1219mm) 60" 24" 60" " VEkidargiXCESS EfoosTray REQUIRoAg6fl'I 91)1AL COV **SEE BACKFILL REQUIREMENTS IN NOTE 6. MAXIMUM RECOMMENDED COVER BASED ON VECHICLE LOADING CONDITIONS ER PIPE DIAM. CLASS I CLASS II CLASS III COMPACTED DUMPED 95% 90% 95% 4" 37 18 25 18 18 (100mm) (11.3m) (5.5m) (7.6m) (5.5m) (5.5m) 6" 44 20 29 20 21 (150mm) (13.4m) (6.1m) (8.8m) (6.1m) (6.4m) 8" 32 15 22 15 16 (200mm) (9.8m) (4.6m) (6.7m) (4.6m) (4.9m) 10" 38 18 26 18 18 (250mm) (11.6m) (5.5m) (7.9m) (5.5m) (5.5m) 12" 35 17 24 17 17 (300mm) (10.7m) (5.2m) (7.3m) (5.2m) (5.2m) 15" 38 17 25 17 18 (375mm) (11.6m) (5.2m) (7.6m) (5.2m) (5.5m) 18" 36 17 24 17 17 (450mm) (11.0m) (5.2m) (7.3m) (5.2m) (5.2m) 24" 28 13 20 13 14 (600mm) (8.5m) (4.0m) (6.1m) (4.0m) (4.3m) 30" 28 13 20 13 14 (750mm) (8.5m) (4.0m) (6.1m) (4.0m) (4.3m) 36" 26 12 18 13 13 (900mm) (7.9m) (3.7m) (5.5m) (4.0m) (4.0m) 42" 23 11 16 11 11 (1050mm) (7.0m) (3.4m) (4.9m) (3.4m) (3.4m) 48" 25 11 17 11 12 (1200mm) (7.6m) (3.4m) (5.2m) (3.4m) (3.7m) 60" 25 11 17 11 12 (1500mm) (7.6m) (3.4m) (5.2m) (3.4m) (3.7m) FILL HEIGHT TABLE GENERATED USING AASHTO SECT ON 12, LOAD RESISTANCE FACTOR DESIGN (LRFD) PROCEDURE WITH THE FOLLOWING ASSUMPTIONS: NO HYDROSTATIC PRESSURE, UNIT WEIGHT OF SOIL (Ys) = 120 PCF Slope Installation The following slope guide outlines general recommendations for installing RollMax" System temporary and/or permanent RECPs on sloping applications. Consult the staple pattern guide (Figure 1) for fastener spacing recommendations based on the slope severity. Drawings Not To Scale SLOPE INSTALLATION STEPS 1. Prepare soil before installing RECPs, including any necessary application of lime fertilizer and seed 2. Begin at the top of the slope by anchoring the RECPs in a 6 In (15 cm) deep x 6 in. (15 cm) wide trench with approxi- mately12 in. (30 cm) of RECPs extended beyond the upslope portion of the trench. Anchor the RECPs with a raw of staples/stakes approximately 12 in. (30 cm) apart in the bottom of the trench. Backfill and compact the trench after stapling, Apply seed to the compacted soil and fold the remaining12 in. (30 cm) portion of RECPs back over the seed and compacted soil. Secure RECPs over compacted soil with a row of staples/stakes spaced approximately 12 in (30 rm) apart across the wth of the R.ELPs. 12 in. 3. Roll the RECPs (3A) down or (3B) horizontally across the slope. RECPs will unroll with appropriate side against the soli surface, All RECPs must be securely fastened to soil surface by placing staples/stakes in appropriate locations es shown in the staple pattern guide. 4. The edges of parallel RECPs must be stapled with an approximately 2 in.-5 in. (5-12 5 cm) overlap depending on the RECP type. 5. Consecutive RECPs spliced down the slope must be end - over -end (shingle style) with an approximate 3 in. (7.5 cm) overlap. Staple through overlapped area, approximately 12 in. (30 cm) apart across entire REEPs width* *NOTE: In adverse soil conditions longer staples/stakes or earth anchors may be necessary to properly secure the RECPs. MATTING DETAIL N.T.S. Channel Installation The following channel guide outlines general recommendations for installing RollMax System temporary and/or permanent RECPs in concentrated flow applications. Consult the staple pattern guide (Figure 1) for fastener spacing recommendations based on the channel severity. 12 in.(]O cm) 6 in. (15 cm) 6 in (15 cm Lu�I u 1 IIu 11-1 -,11-1/=li f d1=11 11=11= -11.=,111111=11.-' 1.=111, .n. 11=11;:. 1=11==1=III' 1=11=1 ?I1=11=11= - -1111=11=1L-' CRITICAL POINTS A. Overlaps and Seams B. Projected Water Line C. Channel Bottom/Side Slope Vertices Drawings Not To Scale 6 In. (15 cm) II=1II=1IbIbIIIb11=1llb CHANNEL INSTALLATION STEPS 1. Prepare soil before Installing RECPs, Including any necessary application of lime, fertilizer and seed. 2. Begin at the top of the channel by anchoring the RECPs in a 6 in. (15 cm)deepx 6 in 15 cm)wide trench with approxi- mately12 ( PP mately12 in. (30 cm) of RECPs extended beyond the upslope portion of the trench. For supplemental scour protection, use RevetMexi" System ShoreMax`' Mat at the channel/ culvert outlet as needed. Anchor the RECPs with a row of staples/stakes approxlmately12 in. (30 cm) apart in the bottom of the trench. Backflll and compact the trench after stapling, Apply seed to the compacted soil and fold the remaining 12 in. (30 cm) portion of RECPs back over the seed and compacted soil. Secure RECPs aver compacted soil with a row of staples/stakes spaced approximately12 in, (30 cm) apart across the width of the RECPs, 3. Roll center REEPs in direction of water flow in bottom of channel, RECPs will unroll with appropriate side against the soil surface. All RECPs must be securely fastened to soil surface by placing staples/stakes in appropriate locations as shown in the staple pattern guide. Horizontal staple/stake spacing should be altered if necessary to allow staples to secure the critical points along the channel surface. 4. Place consecutive RECPs end -over -end (shingle style) with a 4 in.-6 In, (10-15 cm) overlap. Use a double row of staples staggered 4 in. (10 cm) apart and 4 in. (10 cm) on center to secure RECPs. 5. Full-length edge of RECPs at top of side slopes must be anchored with a row of staples/stakes a approximately PP Y 12In. (30 cm) apart in a 6 in, (15 cm) deep x 6 in. (15 cm) wide trench, Backfill and compact the trench after stapling. 6. Adjacent RECPs must be overlapped approximately 2 in,- 5 in. (5-12.5 cm) (depending on RECP type) and stapled" 7. In high flow channel applications a staple check slot is recommended at 30 to 40 ft (9-12 m) intervals. Use a double row of staples staggered 4 in, (10 cm) apart and 4 in. (10 cm) on center over entire width of the channel. 8. The terminal end of the RECPs must be anchored with a row of staples/stakes approximately12 in. (30 cm) apart in a 6 in. (15 cm) deep x 6 in. (15 cm) wide trench. Beckfill and compact the trench after stapling. *NOTE: In adverse soil conditions longer staples/stakes or earth anchors may be necessary to properly secure the RECPs. 6.55 Rev. 6/06 Practice Standards and Specifications ROCK PIPE INLET PROTECTION Definition A horseshoe shaped rock dam structure at a pipe inlet with a sediment storage area around the outside perimeter of the structure, Purpose To prevent sediment from entering, accumulating in and being transferred by a culvert or storm drainage system prior to stabilization of the disturbed drainage area. This practice allows early use of the storm drainage system. Conditions Where Practice Applies Planning Considerations Design Criteria Rock pipe inlet protection may be used at pipes with a maximum diameter of 36 inches. This inlet protection may be used to supplement additional sediment traps or basins at the pipe outlet, or used in combination with an excavated sediment storage area to serve as a temporary sediment trap. Pipe inlet protection should be provided to protect the storm drainage system and downstream areas from sedimentation until permanent stabilization of the disturbed drainage area. Do not install this measure in an intermittent or perennial stream. When construction on a project reaches a stage where culverts and other storm drainage stnictures are installed and many areas are brought to the desired grade, there is a need to protect the points where runoff can leave the site through culverts or stonn drains. Similar to drop and curb inlets, culverts receiving runoff from disturbed areas can convey large amounts of sediment to lakes or streams. Even if the pipe discharges into a sediment trap or basin, the pipe or pipe system itself may clog with sediment. When used in combination with an excavated sediment storage area to serve as a temporary sediment trap, the design criteria for temporary sediment traps must be satisfied. The maximum drainage area should be 5 acres, and 3600 cubic feet of sediment storage per acre of disturbed drainage area should be provided. The minimum stone height should be 2 feet, with side slopes no steeper than 2:1. The stone "horseshoe" around the pipe inlet should be constructed of Class B or Class I riprap, with a minimum crest width of 3 feet. The outside face of the riprap should be coved with a 12-inch thick layer of #5 or #57 washed stone. In preparingPlans for rock pipe inlet protection, it is important to protect the embankment over the pipe from overtopping. The top of the stone should be a minimum of 1 foot below the top of the fill over the pipe. The stone should tie into the fill on both sides of the pipc. The inside toc of the stone should be no closer than 2 feet from the culvert opening to allow passage of high flows. The sediment storage area should be excavated upstream of the rock pipe inlet protection, with a minimum depth of 18 inches below grade. 6.55.1 6 Class B Riprap Flow 3 Sediment torag I e Zone 2 Zone 1.5' . Sediment Depth" Natural Ground Riprap Headwall Figure 6.55a Rock pipe inlet protection plan view and cross-section view 6.55.2 Pipe Invert ipe Filter Berm NC DOT #5 or #57 washed stone Natural Ground Riprap Headwall, 1' min height from road shoulder ld y Rev. 6/06 Practice Standards and Specifications Rev. 6/06 Construction Specifications Maintenance 1. Clear the area of all debris that might hinder excavation and disposal of spoil. 2. Install the Class B or Class I riprap in a semi -circle around the pipe inlet. The stone should be built up higher on each end where it ties into the embankment. The minimum crest width of the riprap should be 3 feet, with a minimum bottom width of 11 feet. The minimum height should be 2 feet, but also 1 foot lower than the shoulder of the embankment or diversions. 3. A 1 foot thick layer of NC DOT #5 or #57 stone should be placed on the outside slope of the riprap. 4. The sediment storage arca should be excavated around the outside of the stone horseshoe 18 inches below natural grade. 5. When the contributing drainage area has been stabilized, fill depression and establish final grading elevations, compact area properly, and stabilize with ground cover. Inspect rock pipe inlet protection at least weekly and after each significant (Y inch or greater) rainfall event and repair immediately. Remove sediment and restore the sediment storage area to its original dimensions when the sediment has accumulated to one-half the design depth of the trap. Place the sediment that is removed in the designated disposal arca and replace the contaminated part of the gravel facing. Check the structure for damage. Any riprap displaced from the stone horseshoe must be replaced immediately. After all the sediment -producing areas have been pennanently stabilized, remove the structure and all the unstable sediment. Smooth the area to blend with the adjoining areas and provide permanent ground cover (Surface Stabilization). References Inlet protection 6.52, Block and Gravel Inlet Protection (Temporary) Sediment Trap and Barriers 6.60, Temporary Sediment Trap Surface Stabilization 6.15, Riprap North Carolina Department of Transportation Erosion & Sedimentation Guidelines for Division Maintenance Operation, 1993. Virginia Erosion and Sediment Control Handbook. 1992. STD & SPEC 3.08, Culvert Inlet Protection. pages III-46 - I11-51 (Culvert Inlets Sediment Trap). 6.55.3 WGLA Engineering WGLA ENGINEERING, PLLC 724 5th AVENUE WEST HENDERSONVILLE, NC 28739 (828) 687-7177 WGLA.COM NC LICENSE P-1342 HAYWOO D PARK SUBDIVISION HENDERSONVILLE HENDERSON COUNTY NORTH CAROLINA o\\1111111///, \o��� FE S�OC�/�, o Q 9�07 SEAL = 0 041349 % _ 7/7 4- L. DERV .,.\ \. /ulllll n 111�\\ 10/31/2022 REVISIONS DATE DESCRIPTION m -11..kIVI Know what's below. Call before you dig. PROJECT NUMBER: 22130 DATE: 10-31-22 DRAWN BY: JRC CHECKED BY: JLD GRADING, DRAINAGE, AND EROSION CONTROL DETAILS 0-303 SCALE: AS NOTED DocuSign Envelope ID: A0150924-C70B-4BB9-838F-BDE6456F3181 WGLA SELF -INSPECTION, SECTION A: SELF -INSPECTION PART III RECORDKEEPING AND REPORTING normal business hours in accordance with the table site conditions would cause the safety of the inspection may be delayed until the next business day on In addition, when a storm event of equal to or of normal business hours, the self -inspection shall be of the next business day. Any time when inspections Inspection Record. Self below. personnel which greater performed were -inspections are required during When adverse weather or to be in jeopardy, the inspection it is safe to perform the inspection. than 1.0 inch occurs outside upon the commencement delayed shall be noted in the Inspect Frequency (during normal business hours) Inspection records must include: (1) Rain gauge maintained in good working order Daily Daily rainfall amounts. If no daily rain gauge observations are made during weekend or holiday periods, and no individual -day rainfall information is available, record the cumulative rain measurement for those un- attended days (and this will determine if a site inspection is needed). Days on which no rainfall occurred shall be recorded as "zero." The permittee may use another rain -monitoring device approved by the Division. (2) E&SC Measures At least once per 7 calendar days and within 24 hours of a rain event > 1.0 inch in 24 hours 1. Identification of the measures inspected, 2. Date and time of the inspection, 3. Name of the person performing the inspection, 4. Indication of whether the measures were operating properly, 5. Description of maintenance needs for the measure, 6. Description, evidence, and date of corrective actions taken. (3) Stormwater discharge outfalls (SDOs) At least once per 7 calendar days and within 24 hours of a rain event > 1.0 inch in 24 hours 1. Identification of the discharge outfalls inspected, 2. Date and time of the inspection, 3. Name of the person performing the inspection, 4. Evidence of indicators of stormwater pollution such as oil sheen, floating or suspended solids or discoloration, 5. Indication of visible sediment leaving the site, 6. Description, evidence, and date of corrective actions taken. (4) Perimeter of site At least once per 7 calendar days and within 24 hours of a rain event > 1.0 inch in 24 hours If visible sedimentation is found outside site limits, then a record of the following shall be made: 1. Actions taken to clean up or stabilize the sediment that has left the site limits, 2. Description, evidence, and date of corrective actions taken, and 3. An explanation as to the actions taken to control future releases. (5) Streams or wetlands onsite or offsite (where accessible) At least once per 7 calendar days and within 24 hours of a rain event > 1.0 inch in 24 hours If the stream or wetland has increased visible sedimentation or a stream has visible increased turbidity from the construction activity, then a record of the following shall be made: 1. Description, evidence and date of corrective actions taken, and 2. Records of the required reports to the appropriate Division Regional Office per Part III, Section C, Item (2)(a) of this permit. (6) Ground stabilization measures After each phase of grading 1. The phase of grading (installation of perimeter E&SC measures, clearing and grubbing, installation of storm drainage facilities, completion of all land -disturbing activity, construction or redevelopment, permanent ground cover). 2. Documentation that the required ground stabilization measures have been provided within the required timeframe or an assurance that they will be provided as soon as possible. NOTE: The rain inspection resets the required 7 calendar day inspection requirement. SELF -INSPECTION, RECORDKEEPING SECTION B: RECORDKEEPING PART III AND REPORTING deviation shall be kept on the site. The throughout the coverage under this permit. plan shall be kept on site and available for hours. 1. 2. 3. E&SC Plan Documentation The approved E&SC plan as well as any approved approved E&SC plan must be kept up-to-date The following items pertaining to the E&SC inspection at all times during normal business Item to Document Documentation Requirements (a) Each E&SC measure has been installed and does not significantly deviate from the locations, dimensions and relative elevations shown on the approved E&SC plan. Initial and date each E&SC measure on a copy of the approved E&SC plan or complete, date and sign an inspection report that lists each E&SC measure shown on the approved E&SC plan. This documentation is required upon the initial installation of the E&SC measures or if the E&SC measures are modified after initial installation. (b) A phase of grading has been completed. Initial and date a copy of the approved E&SC plan or complete, date and sign an inspection report to indicate completion of the construction phase. (c) Ground cover is located and installed in accordance with the approved E&SC plan. Initial and date a copy of the approved E&SC plan or complete, date and sign an inspection report to indicate compliance with approved ground cover specifications. (d) The maintenance and repair requirements for all E&SC measures have been performed. Complete, date and sign an inspection report. (e) Corrective actions have been taken to E&SC measures. Initial and date a copy of the approved E&SC plan or complete, date and sign an inspection report to indicate the completion of the corrective action. Additional Documentation to be Kept on Site In addition to the E&SC plan documents above, the following items shall be kept on the site and available for inspectors at all times during normal business hours, unless the Division provides a site -specific exemption based on unique site conditions that make this requirement not practical: (a) This General Permit as well as the Certificate of Coverage, after it is received. (b) Records of inspections made during the previous twelve months. The permittee shall record the required observations on the Inspection Record Form provided by the Division or a similar inspection form that includes all the required elements. Use of electronically -available records in lieu of the required paper copies will be allowed if shown to provide equal access and utility as the hard -copy records. Documentation to be Retained for Three Years All data used to complete the e-NOI and all inspection records shall be maintained for a period of three years after project completion and made available upon request. [40 CFR 122.41] PART II, SECTION G, ITEM (4) DRAW DOWN OF SEDIMENT BASINS FOR MAINTENANCE OR CLOSE OUT Sediment basins and traps that receive runoff from drainage areas of one acre or more shall use outlet structures that withdraw water from the surface when these devices need to be drawn down for maintenance or close out unless this is infeasible. The circumstances in which it is not feasible to withdraw water from the surface shall be rare (for example, times with extended cold weather). Non -surface withdrawals from sediment basins shall be allowed only when all of the following criteria have been met: (a) The E&SC plan authority has been provided with documentation of the non -surface withdrawal and the specific time periods or conditions in which it will occur. The non -surface withdrawal shall not commence until the E&SC plan authority has approved these items, (b) The non -surface withdrawal has been reported as an anticipated bypass in accordance with Part III, Section C, Item (2)(c) and (d) of this permit, (c) Dewatering discharges are treated with controls to minimize discharges of pollutants from stormwater that is removed from the sediment basin. Examples of appropriate controls include properly sited, designed and maintained dewatering tanks, weir tanks, and filtration systems, (d) Vegetated, upland areas of the sites or a properly designed stone pad is used to the extent feasible at the outlet of the dewatering treatment devices described in Item (c) above, (e) Velocity dissipation devices such as check dams, sediment traps, and riprap are provided at the discharge points of all dewatering devices, and (f) Sediment removed from the dewatering treatment devices described in Item (c) above is disposed of in a manner that does not cause deposition of sediment into waters of the United States. PART III SELF -INSPECTION, RECORDKEEPING AND REPORTING SECTION C: REPORTING 1. 2. Occurrences that Must be Reported Permittees shall report the following occurrences: (a) Visible sediment deposition in a stream or wetland. (b) Oil spills if: • They are 25 gallons or more, • They are less than 25 gallons but cannot be cleaned up within 24 hours, • They cause sheen on surface waters (regardless of volume), or • They are within 100 feet of surface waters (regardless of volume). (c) Releases of hazardous substances in excess of reportable quantities under Section 311 of the Clean Water Act (Ref: 40 CFR 110.3 and 40 CFR 117.3) or Section 102 of CERCLA (Ref: 40 CFR 302.4) or G.S. 143-215.85. (d) Anticipated bypasses and unanticipated bypasses. (e) Noncompliance with the conditions of this permit that may endanger health or the environment. Reporting Timeframes and Other Requirements After a permittee becomes aware of an occurrence that must be reported, he shall contact the appropriate Division regional office within the timeframes and in accordance with the other requirements listed below. Occurrences outside normal business hours may also be reported to the Department's Environmental Emergency Center personnel at (800) 858-0368. Occurrence Reporting Timeframes (After Discovery) and Other Requirements (a) Visible sediment deposition in a stream or wetland • Within 24 hours, an oral or electronic notification. • Within 7 calendar days, a report that contains a description of the sediment and actions taken to address the cause of the deposition. Division staff may waive the requirement for a written report on a case -by -case basis. • If the stream is named on the NC 303(d) list as impaired for sediment - related causes, the permittee may be required to perform additional monitoring, inspections or apply more stringent practices if staff determine that additional requirements are needed to assure compliance with the federal or state impaired -waters conditions. (b) Oil spills and release of hazardous substances per Item 1(b)-(c) above • Within 24 hours, an oral or electronic notification. The notification shall include information about the date, time, nature, volume and location of the spill or release. (c) Anticipated bypasses [40 CFR 122.41(m)(3)] • A report at least ten days before the date of the bypass, if possible. The report shall include an evaluation of the anticipated quality and effect of the bypass. (d) Unanticipated bypasses [40 CFR 122.41(m)(3)] • Within 24 hours, an oral or electronic notification. • Within 7 calendar days, a report that includes an evaluation of the quality and effect of the bypass. (e) Noncompliance with the conditions of this permit that may endanger health or the environment[40 CFR 122.41(I)(7)] • Within 24 hours, an oral or electronic notification. • Within 7 calendar days, a report that contains a description of the noncompliance, and its causes; the period of noncompliance, including exact dates and times, and if the noncompliance has not been corrected, the anticipated time noncompliance is expected to continue; and steps taken or planned to reduce, eliminate, and prevent reoccurrence of the noncompliance. [40 CFR 122.41(I)(6). • Division staff may waive the requirement for a written report on a case -by -case basis. NCGO1 SELF -INSPECTION, RECORDKEEPING AND REPORTING EFFECTIVE: 04/01/19 Engineering WGLA ENGINEERING, PLLC 724 5th AVENUE WEST HENDERSONVILLE, NC 28739 (828) 687-7177 WGLA.COM NC LICENSE P-1342 HAYWOO D PARK SUBDIVISION HENDERSONVILLE HENDERSON COUNTY NORTH CAROLINA SEAL = = 1 041349 g = %C 57%%;VGINE <(,- ''"� 9 L. DERV \,.\ ,. 10/31/2022 REVISIONS DATE DESCRIPTION -..„Ap5,0 Know what's below. Call before you dig. PROJECT NUMBER: 22130 DATE: 10-31-22 DRAWN BY: JRC CHECKED BY: JLD GRADING, DRAINAGE, AND EROSION CONTROL DETAILS 0-304 SCALE: AS NOTED DocuSign Envelope ID: A0150924-C7OB-4BB9-838F-BDE6456F3181 WGLA GROUND STABILIZATION AND MATERIALS HANDLING PRACTICES FOR COMPLIANCE WITH THE NCGO1 CONSTRUCTION GENERAL PERMIT Implementing the details and specifications on this plan sheet will result in the construction activity being considered compliant with the Ground Stabilization and Materials Handling sections of the NCGO1 Construction General Permit (Sections E and F, respectively). The permittee shall comply with the Erosion and Sediment Control plan approved by the delegated authority having jurisdiction. All details and specifications shown on this sheet may not apply depending on site conditions and the delegated authority having jurisdiction. SECTION E: GROUND STABILIZATION Required Ground Stabilization Timeframes Stabilize within this Site Area Description many calendar Timeframe variations days after ceasing land disturbance (a) Perimeter dikes, swales, ditches, and perimeter slopes 7 None (b) High Quality Water 7 None (HQW) Zones (c) Slopes steeper than 3:1 7 If slopes are 10' or less in length and are not steeper than 2:1, 14 days are allowed -7 days for slopes greater than 50' in length and with slopes steeper than 4:1 (d) Slopes 3:1 to 4:1 14 -7 days for perimeter dikes, swales, ditches, perimeter slopes and HQW Zones -10 days for Falls Lake Watershed (e) Areas with slopes -7 days for perimeter dikes, swales, ditches, perimeter slopes and HQW Zones flatter than 4:1 14 -10 days for Falls Lake Watershed unless there is zero slope Note: After the permanent cessation of construction activities, any areas with temporary ground stabilization shall be converted to permanent ground stabilization as soon as practicable but in no case longer than 90 calendar days after the last land disturbing activity. Temporary ground stabilization shall be maintained in a manner to render the surface stable against accelerated erosion until permanent ground stabilization is achieved. GROUND STABILIZATION SPECIFICATION Stabilize the ground sufficiently so that rain will not dislodge the soil. Use one of the techniques in the table below: Temporary Stabilization Permanent Stabilization • Temporary grass seed covered with straw or • Permanent grass seed covered with straw or other mulches and tackifiers other mulches and tackifiers • Hydroseeding • Geotextile fabrics such as permanent soil • Rolled erosion control products with or reinforcement matting without temporary grass seed • Hydroseeding • Appropriately applied straw or other mulch • Shrubs or other permanent plantings covered • Plastic sheeting with mulch • Uniform and evenly distributed ground cover sufficient to restrain erosion • Structural methods such as concrete, asphalt or retaining walls • Rolled erosion control products with grass seed POLYACRYLAMIDES (PAMS) AND FLOCCULANTS 1. Select flocculants that are appropriate for the soils being exposed during construction, selecting from the NC DWR List of Approved PAMS/Flocculants. 2. Apply flocculants at or before the inlets to Erosion and Sediment Control Measures. 3. Apply flocculants at the concentrations specified in the NC DWR List of Approved PAMS/Flocculants and in accordance with the manufacturer's instructions. 4. Provide ponding area for containment of treated Stormwater before discharging offsite. 5. Store flocculants in leak -proof containers that are kept under storm -resistant cover or surrounded by secondary containment structures. EQUIPMENT AND VEHICLE MAINTENANCE 1. Maintain vehicles and equipment to prevent discharge of fluids. 2. Provide drip pans under any stored equipment. 3. Identify leaks and repair as soon as feasible, or remove leaking equipment from the project. 4. Collect all spent fluids, store in separate containers and properly dispose as hazardous waste (recycle when possible). 5. Remove leaking vehicles and construction equipment from service until the problem has been corrected. 6. Bring used fuels, lubricants, coolants, hydraulic fluids and other petroleum products to a recycling or disposal center that handles these materials. LITTER, BUILDING MATERIAL AND LAND CLEARING WASTE 1. Never bury or burn waste. Place litter and debris in approved waste containers. 2. Provide a sufficient number and size of waste containers (e.g dumpster, trash receptacle) on site to contain construction and domestic wastes. 3. Locate waste containers at least 50 feet away from storm drain inlets and surface waters unless no other alternatives are reasonably available. 4. Locate waste containers on areas that do not receive substantial amounts of runoff from upland areas and does not drain directly to a storm drain, stream or wetland. 5. Cover waste containers at the end of each workday and before storm events or provide secondary containment. Repair or replace damaged waste containers. 6. Anchor all lightweight items in waste containers during times of high winds. 7. Empty waste containers as needed to prevent overflow. Clean up immediately if containers overflow. 8. Dispose waste off -site at an approved disposal facility. 9. On business days, clean up and dispose of waste in designated waste containers. PAINT AND OTHER LIQUID WASTE 1. Do not dump paint and other liquid waste into storm drains, streams or wetlands. 2. Locate paint washouts at least 50 feet away from storm drain inlets and surface waters unless no other alternatives are reasonably available. 3. Contain liquid wastes in a controlled area. 4. Containment must be labeled, sized and placed appropriately for the needs of site. 5. Prevent the discharge of soaps, solvents, detergents and other liquid wastes from construction sites. PORTABLE TOILETS 1. Install portable toilets on level ground, at least 50 feet away from storm drains, streams or wetlands unless there is no alternative reasonably available. If 50 foot offset is not attainable, provide relocation of portable toilet behind silt fence or place on a gravel pad and surround with sand bags. 2. Provide staking or anchoring of portable toilets during periods of high winds or in high foot traffic areas. 3. Monitor portable toilets for leaking and properly dispose of any leaked material. Utilize a licensed sanitary waste hauler to remove leaking portable toilets and replace with properly operating unit. EARTHEN STOCKPILE MANAGEMENT 1. Show stockpile locations on plans. Locate earthen -material stockpile areas at least 50 feet away from storm drain inlets, sediment basins, perimeter sediment controls and surface waters unless it can be shown no other alternatives are reasonably available. 2. Protect stockpile with silt fence installed along toe of slope with a minimum offset of five feet from the toe of stockpile. 3. Provide stable stone access point when feasible. 4. Stabilize stockpile within the timeframes provided on this sheet and in accordance with the approved plan and any additional requirements. Soil stabilization is defined as vegetative, physical or chemical coverage techniques that will restrain accelerated erosion on disturbed soils for temporary or permanent control needs. o O O O \V V/ 0> <� SILT FENCE 0> < o%o o`o "-A CONCRETE WASHOUT [SANDBAGS (TYP.) OR STAPLES CLEARLY MARKED SIGNAGE NOTING DEVICE (18"X24" MIN.) PLAN 1:1 SIDE SLOP (TYP ONSITE CONCRETE WASHOUT STRUCTURE WITH LINER HIGH COHESIVE & LOW FILTRATION SOIL BERM 10 MIL PLASTIC LINING SANDBAGS (TYP.) OR STAPLES SECTION A -A NOTES: 1. ACTUAL LOCATION DETERMINED IN FIELD 2. THE CONCRETE WASHOUT STRUCTURES SHALL BE MAINTAINED WHEN THE LIQUID AND/OR SOLID REACHES 75% OF THE STRUCTURES CAPACITY. 3.CONCRETE WASHOUT STRUCTURE NEEDS TO BE CLEARY MARKED WITH SIGNAGE NOTING DEVICE. BELOW GRADE WASHOUT STRUCTURE NOT TO SCALE 10' MIN .B AAAA <O(DV �V/0 <0> <O <0> <0 <O AcAcoq /VVVV CONCRETE WASHOUT > J o. SANDBAGS (TYP.) OR STAPLES CLEARLY MARKED SIGNAGE NOTING DEVICE (18"X24" MIN.) PLAN 10 MIL PLASTIC LINING 1:1 SIDE SLOP l() SECTION B-B SANDBAGS (TYP.) ORHRGH STAPLES COHESIVE & LOW FILTRATION SOIL BERM NOTES: 1. ACTUAL LOCATION DETERMINED IN FIELD 2. THE CONCRETE WASHOUT STRUCTURES SHALL BE MAINTAINED WHEN THE LIQUID AND/OR SOLID REACHES 75% OF THE STRUCTURES CAPACITY TO PROVIDE ADEQUATE HOLDING CAPACITY WITH A MINIMUM 12 INCHES OF FREEBOARD. 3.CONCRETE WASHOUT STRUCTURE NEEDS TO BE CLEARY MARKED WITH SIGNAGE NOTING DEVICE. ABOVE GRADE WASHOUT STRUCTURE NOT TO SCALE CONCRETE WASHOUTS 1. Do not discharge concrete or cement slurry from the site. 2. Dispose of, or recycle settled, hardened concrete residue in accordance with local and state solid waste regulations and at an approved facility. 3. Manage washout from mortar mixers in accordance with the above item and in addition place the mixer and associated materials on impervious barrier and within lot perimeter silt fence. 4. Install temporary concrete washouts per local requirements, where applicable. If an alternate method or product is to be used, contact your approval authority for review and approval. If local standard details are not available, use one of the two types of temporary concrete washouts provided on this detail. 5. Do not use concrete washouts for dewatering or storing defective curb or sidewalk sections. Stormwater accumulated within the washout may not be pumped into or discharged to the storm drain system or receiving surface waters. Liquid waste must be pumped out and removed from project. 6. Locate washouts at least 50 feet from storm drain inlets and surface waters unless it can be shown that no other alternatives are reasonably available. At a minimum, install protection of storm drain inlet(s) closest to the washout which could receive spills or overflow. 7. Locate washouts in an easily accessible area, on level ground and install a stone entrance pad in front of the washout. Additional controls may be required by the approving authority. 8. Install at least one sign directing concrete trucks to the washout within the project limits. Post signage on the washout itself to identify this location. 9. Remove leavings from the washout when at approximately 75% capacity to limit overflow events. Replace the tarp, sand bags or other temporary structural components when no longer functional. When utilizing alternative or proprietary products, follow manufacturer's instructions. 10. At the completion of the concrete work, remove remaining leavings and dispose of in an approved disposal facility. Fill pit, if applicable, and stabilize any disturbance caused by removal of washout. HERBICIDES, PESTICIDES AND RODENTICIDES 1. Store and apply herbicides, pesticides and rodenticides in accordance with label restrictions. 2. Store herbicides, pesticides and rodenticides in their original containers with the label, which lists directions for use, ingredients and first aid steps in case of accidental poisoning. 3. Do not store herbicides, pesticides and rodenticides in areas where flooding is possible or where they may spill or leak into wells, stormwater drains, ground water or surface water. If a spill occurs, clean area immediately. 4. Do not stockpile these materials onsite. HAZARDOUS AND TOXIC WASTE 1. Create designated hazardous waste collection areas on -site. 2. Place hazardous waste containers under cover or in secondary containment. 3. Do not store hazardous chemicals, drums or bagged materials directly on the ground. NCGO1 GROUND STABILIZATION AND MATERIALS HANDLING EFFECTIVE: 04/01/19 Engineering WGLA ENGINEERING, PLLC 724 5th AVENUE WEST HENDERSONVILLE, NC 28739 (828) 687-7177 WGLA.COM NC LICENSE P-1342 HAYWOO D PARK SUBDIVISION HENDERSONVILLE HENDERSON COUNTY NORTH CAROLINA ,,,,1111111,,,,, SEAL = = 1 041349 g = %C 57% ;VGINE <(,- ''"� 9 L. DERV \,.\ ,. / / //11111111\\ 10/31/2022 REVISIONS DATE DESCRIPTION -ftilp5„,, Know what's below. Call before you dig. PROJECT NUMBER: 22130 DATE: 10-31-22 DRAWN BY: JRC CHECKED BY: JLD GRADING, DRAINAGE, AND EROSION CONTROL DETAILS 0-305 SCALE: AS NOTED REVISIONS 0' oo RIGHT OF WAY REVISION #/4 - MARCH 29,2022 - PARCEL 8/ WAS DIVIDED INTO FOUR SEPARATE PARCELS: 8/, 8/A, 8/B, AND 8/C. c 01 co s 0 7l 0 cc H m co co LE--) CC 7 0 i 0 7 0 0 0 CC m CO 00 LC) CC CVO � N° On U) CVO �z 0 =X rCH TO SHEET NO 17 -DRI- CURVE DATA NOTES. +00.00 , � PROJECT REFERENCE NO. SHEET NO. 50.00 z +00.00 ANNUAL AVERAGE DAILY TRAFFIC 1 . UNLESS OTHERWISE NOTED ALL DRIVES ARE ASPHALT DRIVES. 300.0' P/ Sto /3+16.03 P/ Sto /5+58.43 •. R-2588B 18 R258.. A = 4° 20' 08.511 (RT) 0 = 12°36'390u(LT) 2. SEE SHEET 2B-__ FOR MEDIAN ISLAND LAYOUT. \ / 31� • -1- i $ 28 29 R/W SHEET NO. D = 3°49'II.O" D = IP27'33.0" 3. SEE SHEET 2B-1 FOR INTERSECTION ANSD ISLAND LAYOUT. \ 6'1� I �, y ROADWAY DESIGN HYDRAULICS yw7 I L II ENGINEER ENGINEER L = 113.5/' L = 110.05' T = 56.78'T = 55.25 ' UNLESS OTHERWISE NOTED 10'PROP MULTI -USE PATH PROP MONOLITHIC CONC ISLAND \ �` �•89' ' N J a -� _ � /,X I R = 1,500.00' R = 500.00' DETAIL 18 K N os BEGIN CONSTRUCTION i- 18 10 CHANNEL CHANGE NATIVE MATERIAL ( ) Not to Scale y I -DR1- STA. 9 + 2 7.2 4 �•' I^ I X , 138 144 19 188 195 ,o ,36 188 SHALL FILL VOIDS IN RIPRAP b 6" \ 1$11 I -L- NC 19/ S 42°08'21" E Natural Proposed Ground F \ I• P 1111 210.16' Natural Fill Slope 4' CONC HW g-F p/ o 4 10 1 1 Grouncr 2•j D ti' 1"/Ft. m i I 6 13 2 4 d IL... .\ I J 9A� = 131 Min. D = 3.5 Ft. Exist. Channel Min. d = 3.5 Ft. REMOVE HW & 6 LF I U o I N _CONC 01/4 PROP. RETAINING ALL O NNG #3 B=4 Ft. �s'II 60"CHL �o -L- STA. 175 + 77.05 TO 177 + 31.64, LT SEE DETAIL SHT W3- Type of Liner= Class IRip-Rap B=4 Ft. = 210 TONS Length 92 Ft. NOTES: REBAR I I I I I CTHRU a X I I I 0�� c X 84 BLK h$ >2a 1 x i i4 0 9 1 6 DOCUMENT NOT CONSIDERED FINAL UNLESS ALL SIGNATURES COMPLETED W3-4 1) CLASS I RIP -RAP SHALL BE EMBEDDED IN ORDER TO NOT IMPEDE z N I 2017 AADT (IN HUNDREDS) c AQUATIC ORGANISM PASSAGE. NATIVE MATERIAL SHALL BE PLACED ON I i a = V I LT2040 AADT (IN HUNDREDS) TESTGS ENGINEERS ENGINEERS804-C 81A TOP OF CLASS I RIP -RAP TO FILL VOIDS AND PROVIDE A FLATm SURFACE FOR ANIMAL PASSAGE. NATIVE MATERIAL CONSISTS OF MATERIAL THAT IS EXCAVATED FROM THE STREAM BED AT PROJECT SITE. NATIVE MATERIAL IS SUBJECT TO APPROVAL BY THE ENGINEER. Lo BM#29 No // ;� III °p i I• m t MILL AND RESURFACE N. LAFAYETTE ST SHELBY, NC 28150 PH (704) 476-0003 To CORP. LICENSE NO.. C-0275 p -L- STA 176+79 TO 177+56 LT � (SEE PFL FOR CHANNEL CHANGE GRADE) SPANO & ASSOCIATES CC) HAYWOOD, LLC w s� DB 3278 PG 574 81 B PLAT SLIDE 7088 p_ 81 C SPANO & ASSOCIATES HAYWOOD, LLC Z os°� SEAL AND w DB 3278 PG 574 SPANO & ASSOCIATES ,�, ss C m / I ca t �O �� � LI Q. - � `° 0 ,+ W , rnLO F -DRI- STA 9+27.24 ABAND TO 12 + 40.00 X 72" CHL O 1 X 84 HENDERSON CO OF PUBLIC SCHOOLS \\16 BOARD �OJ, ABANDON WELL HAYWOOD LLC p o PLAT SLIDE 7088 DB 3278 PG 574 •��" ° +97.00 / CB-F x DB 824 PG 213 ��. -L- POT 176+28.52 = PLAT SLIDE 7088 50.00' / ' �" +98.00 U SEEEDETAIL 1LATDr CH I -Y5- POT /0+00.00 CLASS B RIPRAP ,i 1812 \ M 30.00' SPEC! L LAT L DDE=110 CY BERM DITG�f z 2 TONS, 7 SY GEO DITCH BLOCK PROP. 5' •? I ;I BASE • CH X / SEE DETAIL -VD \ RIPRAP AT EMBANK ENT SEE DETAIL 18D SIDEWALK q� °�SEE / M DET IL 18 PROP. MULTI -USE PATH BEGIN STA. 183+52.89 LT 00 / LATERAL 'V' DITC SEE DETAIL 18G •1 :I +60.00 -L- 162.00'SEE DETAIL F 100' TAPER PROP. MULTI -USE PATH TI' EXISTING DITCH,aik BEGIN -L- STA. 182 +10.00 LT INTO BERM DITCH F N ` 1 ' N M 115.58' BERM DITCH SEE DETAIL 18E +08.00 / y DDED25 &� 158.00'°.�0 DI BURIED 1' I m5.2' \ N 20 000 -DRI- + +03.00 DR/ PC /2 59.25 • TAPIR I 7 �I= LUGC&P GASKETSOD' BERM DITCH 1 PROP. GRAVEL SEE DETAIL 18E It Ln �, ss100' 047 mg' v - 0.T. DRIVE y B RIP' + 88.00' ti II 04 BERM DITCH -- PDE\ • ..60 CHL - SEE DETAIL 1:' PDE `� ! i o� 100 T ER +50.00 TsNS, +21.00 7 SY GEO ., CLASS B RIPRAP Q‹" p +15.00 BERM BASE DITCH i1 �5 ;''. _"__ d r� „�,. �,,, UE 65.00' C ANNEL CHANGE 2 TONS 7 SY GEO ���\ 112.00' SEE DETAIL 18C C7.49.00 / +94.00-r ���1�9�� 95.00' -DRI- W� S E D TAIL 1 +52.00 +66 00 PT 13+72.76 1 R P-IV 03 I'/� � P %`� C \\ �rA E 50.00 D E - - 230 + 00.0 75.0o ��� ��Z:�., �` 0.00' 105.00' LATERAL BASE DITC 99.00' LATERAL BASE DITCH CLASS B RIPRAP 5.00' / a• I P ) " + t, r� 2 +33.00 \cp �\ �I SEE DETAIL 18A SEE DETAIL 18B 2 TONS 7 SY GE 15 R : IV ° >�• 1 ► .. Q / +48.00 gLK '• \\11116,1k ���'rn 38.00 j FILL EX STI G „ DDE=100 CY /� w DDE=105 CY /� 1 � APER � p . h�'�' to ��c 139.00' ?"Cl 147.00'\\�..0,-1**- 9.00 H L W . D DUE +15.00 �� ',. �' � I ��. 4, <-. .-,.,,,. ,►. 1805 p"N GRADE T �; 87.44 +18.00 `� _�►'►_ `� U ., -_.I BACKFIL �leuttartnu►u�►Nu►, „tell ui.ItunMOMIO ►. DRAIN ..�� / v / + DUE 78.00' � ��, " I w ` / g. s 15" CSP W/ ROD & p 1 OO +18.00 N ,i�'i•�:�':•,, f1!/,��:Ir,,. zes��:::..:►::�nr��A_ I � .: p � �_ At/AWL• .� �� .; LUG & GASKETS /� 7, � it 75.00' ` : 1 1% V /• ,: j • W_� .,.. /%A�jC�,►' ..•..:::.:�..Iri��r'�C��. sign �1`'/,il,oni %��_____ �iti o��� •1____�!0►hai•_, IM=7- ��t I :aII �''� EL60 wuuuS R Ci 1-/� :.TTB -.4 .o.. u•-• •u1iuItrA ,di ..�������...�I��r���� �`r �� ©�'��V`74' :13' ?4 ,I� tN00 _ i:: =' '_ ig/1806 Xi ��.... ������ �). R''�/� ,I =wO��wy�:r s.49(.i � _-Iy WOODS lig � �o�� TL-3 C i 0►. 1 c � 15" 1824 .'II 15"RCP IV - 15"RCP-IV 13 .11 • ,��_���„►„����,•� �. � c': ;• V - 1 0 1828 RCP IVIt. �� CAT-1 '�dJ<k! ' 65.00' Q y \ 1 „ _ P IV CP-IV 2'-6" ,I� 1I�� 15" RCP -IV ' 6'�6 P , •� - I � dIMiM.- i��/� I 24 RC�+�V I CB-F - - - CB-F CB-F CB-F 2 -• C$cG • ' i Ku 5I VIM- - JL- �W'Mair • �� 11_ SPRING BOX 4:10 �3� " ' .�� b ► RN -y ' I . �Alir w Q,;- . 6" 12 '.T 1820 CB-F"*.‘"I > I� 0 1801 o n� z4 .1 - � 100 P' I 1829 e • PR 183 . R `r 1' 6 �` :: T mot' " ..i im m 9' CONC WW etC• r; E O I o - 1 •, w- \ 4. . • F'•'� 1 P G •O _• cl, ._ in y` o Il Q �T - • ~ ,• --I• REMOVE 2G1 1807 � � NC HAYWOOD RD �, R2588B-8 CB-G 15" RCP-IV4: CB-G 15" RCP -IV 1832 CB-G B HwY /9/ fS o I E .+_ , � 2'-6" C&G 3'840 - �" STL ". I N C� a: 1809B-G `EMO .:- ��5 -• :: v Fo- - - - ��_ - - -G- �- � >.� ii�'I�:IC[, - - - - - - - - - - - =G- n , 00.00 MATCH �?3=1Rc�� -- - -"- - - =W - - ��`-�\ � win' KGIv.'' - - - - - - - - - - -G- _ _ � Q /� �CO �. �� '' W 2'-6„ C& w ,`,,� � � �� - T O- - T FO- ` ST - - �!r7 CO --- ' .a. .a. .a_ -�-` . r� ■ - - . r ar' -�•.�• - �r 7. BOXY* �,� � F F 24 S F F:'i F F F F • 48 .. �/ • * �.♦ .. - - T FO- 36 ST I ' A IG F 48 WD • •• . � �' tor,�-' -r Fo- - - O C , 48 WD s * • ��'� - TOP 2092.3. EXISTING Ri GUY tJI �, � X X X -X--�E X X X X X X X +46.53 � � . , % �IL � PUE PUE PUE 36 T O" 02 l✓ t► Is - F I �l�_.41 PUE "�.'.7�1# ._ EX. RA/ C \ CB-F Ol +06.56 B-G I O F. • �. . -,- 24 AC �1=,,���'��'�� 'i o� o-�� - - T F - - FO- vi .- -;rR, PU '� �� � �O � EX. RAN � 1850 ,. • ' EMOVE CB 10..82' +00.00 "PEC.►'Iy .'. ���,��► -_ _� `_- -,-• .u` L. U �*i ' �' -_E �; - �. STL 83 • r +11.00 79.00 78.00' j 1 , . ,tia _ BURIED 1D d' d' , AIL • +48.00 + 52.00 • ,` y` _ V�•� • - • - * , 72.00 +16.00 ° - w 18' 18' CHANNEL CHANGE ' 537.5 TAPERS 1I- 1 ( - 4 76.38' 68 25' p •. +67.32 ._,,, �, �o j && / - 93.00' +34.01 60 EX. RNV : 0- `> $EE DETAIJIc18H 0 \ate ' :_1 02 ►. f. D o ,. +32km +10.r + 4.00 EX. RiW ;. CLASS I 25 TONS ;.�� �� •C1 DRI PC /5+03J8 -DRI- - _ - 93.00 90.00 85.00 �� +10.00 76.00 �' �° - - tel:; " . : it o / ± DDE p) CY ± ± ± ± ± ± ± ± �� l '. I 40.00 " ✓ ' =] r + 04.00 y + 2 6.00 ;,; s �� 12 DI SSSS 12 PVC/12' DI .,• . 02� 1 /, 12" PVC y� ►1 TOP=2�094.40' ss 537.5 T ...!I` °,'' 115.00' W 112.00' ss / 1 ss .. �5 126 IZ'Ogl TOP=-089.80' 12 DI ss R % P .; -SS , . _ .� T' •4 TOP=2095 `� • 786 TOP='089.08 ItIP TOP=2087.72' - �, ' Y AP 87v, CLASS B 'RAP 1 I •' .6rr+42.01 II d' - -� - 1 = - 1 -- -91M -- 8.�0�\.r.)1 , `- - 8lM . II D 0 _ 2 TONS, SY GEO 1 I II ,�� -�� �y-. �: - - - - - NN �I II I I ,' ��✓% I JOHN THORSLAND PROP. CONCRETE M THORSLANDSA DRIVE * - - CLASS B RIPRAP +26.00 ;9'wV 11 , - - - II < DBS3627 PG 295 +30.00 oI� 2m ei 2 TONS, 7 SY GEO 34.00'o' ? ; I I • EX. ' boar+eDS I ' J �� II -z� ( CLASS B RIPRAP 2 TONS, 7 SY GEO m 5 ' CLASS B RIPRAP D " I 1 I. II - + _ DRl PT /323 is 24 ST nfl 11 24 ST WOODS 2 TONS, 7 SY GEO o _ i 1� WOODS ,� 4 PL I:C : oN Lk 8 II : • NK STABILIZATION • \ ' Q -L- POT 183+07.55 N 1 1 • 1 . - - �� I� I S DETAIL 181 85 -/ - / • �/ /�I 1S - 1S- CONSERVIING RBKN28 0552 11160 � _ 1 TONS CLASS I 1 +64.00 s S / Mlr s MIi . CONSERVIING CAROLINA '� a`. �� ii % 12.00' ` �� 1S'�-- �i �s PG ,5 X� DB 1602 PG 307 w I 1 C J • w CORP BK 28 PG 552 END CONSTRUCTION DB 1602 PG 307 �� 1 i,,ti 183 40.00 � / "l -DRI- POT /6+64J2 N PLAT CABINET A I E ` -- Ik CLASS B RIPRAP PLAT CABINET A SLIDE 52A -D R1- STA. 16 + 40.00 25 00� p = SLIDE 52A DETAIL 18H N I I 2 TONS, 7 SY GEO DETAIL 18J , CLASS B RIPRAP CHANNEL CHANGE M ' v) q DETAIL 17D D `� 83 c� BERM DITCH z 5 TONS, 14 SY GEO DETAIL 18F (Not to Scale) I END CONSTRUCTION SPECIAL LATERAL BASE DITCH LATERAL 'V' DITCH - a (Not to Scale) W (Not to Scale) Natural Natural BM#28 fl -Y5- STA. 11 + 50.00 J ~ J N J ELEV - 2106.0 DETAIL 18D (Not to Scale) GrouncED ' �"F %"" Ground // IIa VAR. .,.... 5.0' 5.0' Natural o< Fill N•GIf•B• DITCH BLOCK b •' ..:," 6.5' CONC WW II 7' CONC WW VAR. Ground ?.•j �oe< Slope (Not to Scale) Natural r Fill B Exist. Channel Z F VAR. CLASS I RIP -RAP n�' ' d = CUT Ground 2• j 1' Ft. Slope KEYED -IN (TYP.) Length =13 Ft. + ?•j `i.• D O AS W ! 96" CMP' ) �' �. 'n 1o.0'v.C. D Geotextile g Min. D=1.0 Ft. SLOPE Min. D=1 Ft. Min. D=4 Ft. 50°59'31" � ,/S\ I Min. d=0.5 Ft. j � b=See Below B-5 Ft. -�S� �, " 96 CMPII - � JS- 1 -YS- -/ Min. D=1.0 Ft. B=3 Ft. 1\ Type of Liner=CLASS 1 RIPRAP 26.5' + Type of Liner= Class !Rip -Rap Prop. Ditch Exist. Ditch Bed \ 26.5' STONE HW STONE HW 35 TONS, 49 SY GEO -L- STA. 175+50 TO 175+97 LT (b=5') .1 7' CONC WW ! I 4' CONC WW -L- STA. 174+04 TO 175+50 LT-L- II II. (SEE XSCS FOR DITCH GRADES) -DR1- STA. 12+41 TO 12+86 LT (SEE PFL FOR DITCH GRADE) STA. 182+50 LT -L- STA. 187+22 TO 189+00 LT (b=2') -L- STA 177+72(73' RT) TO 177+74(86' RT) (SEE PFL FOR DITCH GRADES) (SEE PFL FOR CHANNEL CHANGE GRADE) DETAIL 18A DETAIL 18B DETAIL 18C DETAIL 18G DETAIL 181 DETAIL 18E LATERAL BASE DITCH ( Not to Scale)Not LATERAL BASE DITCH to Scale)Not ( BERM BASE DITCH to Scale ( ) b uJ BERM DITCH z , Q ( Not to Scale) J w RIP RAP AT EMBANKMENT ( Not to Scale)at BANK STABILIZATION I (Not to Scale) ��aa�� round�FXiSTNc e��� pound - b b b v BgNy ' 1 '� r v 5'min. �s"' Natural I Natural Natural Ground�\1'/Ft.Fill Ground�\1' 5.0VAR.DitchGrade Ft.FillGround• VAR. cuss IRIP-Rn,P Len th=12Ft.DSlopeDSloped) gMin. D=2.0 Ft.Min. D=1.5 Ft. \DWY KEYED -IN rvr.I CHANNEL BEDMin.d= 4Ft.B B=4 Ft.B B=3 Ft.Min. D=1.5 Ft.GEOTEXTILE Variable) b=5 Ft. Length = 88 Ft. b=5 Ft. Length =150 Ft. Min. d=1.5 Ft. B = 3 Ft. 10.o'v.C. ? j D L STA 177+74(86' RT) TO 177+79(97' RT) - -L- STA.177+62 TO 178+66 LT -L- STA. 179+10 TO 181+00 LT b=5 Ft. Min.D=1.0 Ft. Type of Liner= Class B Rip-Rap,4 TONS FOR -L- PROFILE, SEE SHEET NO. 31 (SEE PFL FOR DITCH GRADE) (SEE PFL FOR DITCH GRADE) Type of Liner= Class I Rip -Rap L STA. 175+92 TO 175+99 LT 124 TON, 174 SY GEO STA. 183+74 TO 183+97 LT FOR -Y5- PROFILE, SEE SHEET NO. 35 -L- STA. 181 00 TO LT -L- + 182 + 56 -L- STA. 183 + 97 TO 186+00 LT (SEE XSCS FOR DITCH GRADES) STA. 186+00 TO 186 + 90 LT FOR -DR1- PROFILE, SEE SHEET NO. 37 -L- (SEE PFL FOR DITCH GRADE) C. Proposed Impacts Inventory 1. Impacts Summary 1 a. Which sections were completed below for your project (check all that apply): ❑ Buffers ❑ Open Waters ❑ Pond Construction X Wetlands X Streams — tributaries 2. Wetland Impacts If there are wetland impacts proposed on the site, then complete this question for each wetland area impacted. 2a. Wetland impact number Permanent (P) or Temporary (T) 2b. Type of impact 1 2c. Type of wetland 2d. Forested 2e. Type of jurisdiction Corps (404,10) or DWQ (401, other) 2f. Area of impact (acres) W1 P Fill Bottomland Hardwood Forest No Corps 0.147 W2 P Fill Bottomland Hardwood Forest No Corps 0.001 W3 T Excavation Bottomland Hardwood Forest No Corps 0.003 W4 T Excavation Bottomland Hardwood Forest No Corps 0.002 W5 P Fill Headwater Wetland No Corps 0.318 W6 - Choose one Choose one Yes/No - 2g. Total Wetland Impacts: 0.471 2h. Comments: 0.025 Ac of non-404 regulated wetlands (WD and WD) are proposed to be filled; automatically authorized under NJGP100000 (pending AJD approval). 3. Stream Impacts If there are perennial or intermittent stream impacts (including temporary impacts) proposed on the site, then complete this question for all stream sites impacted. 3a. Stream impact number Permanent (P) or Temporary (T) 3b. Type of impact 3c. Stream name 3d. Perennial (PER) or intermittent (INT)? 3e. Type of jurisdiction 3f. Average stream width (feet) 3g. Impact length (linear feet) S1 T Excavation SA -UT Mill Pond Creek PER Corps 6 27.0 S2 T Excavation SA -UT Mill Pond Creek PER Corps 6 21.7 S3 - Choose one - - S4 - Choose one - - S5 - Choose one - - S6 - Choose one - - 3h. Total stream and tributary impacts 48.7 3i. Comments: S1 and S2 are for underground utility line crossings; no permanent loss of stream bed. Page 4 of 10 PCN Form — Version 1.4 January 2009 PROPOSED PUBUC GRAVITY SEWER (TYP) IMPACT W3 — TEMPORARY UTIUTY CONSTRUC110N IMPACT TO WETLAND WATERS (SEE NOTE 1)(0.003 AC *) IMPACT W4 — TEMPORARY UTIUTY CONSTRUC110N IMPACT TO WETLAND WATERS (SEE NOTE 1)(0.002 AC ±) IMPACT S1 — TEMPORARY U11UTY CONSTRUC110N IMPACT TO NON —WETLAND WATERS 3 (0.003 AC ±, 27.0 LF) ) IMPACT S2 — TEMPORARY UTIUTY CONSTRUC110N IMPACT TO NON —WETLAND WATERS (0.003 AC *, 21.7 LF) 0.93 AC LOT:10 1.01 AC LOT:16 1.42 AC LOT: 4 1.25 AC LOT:2 0.59 AC 0.57 AC LOT:11 0.53 AC LOT:17 0.59 AC LOT:6 0.59 AC LOT:12 0.50 AC 0.64 AC LOT:13 0.56 AC PROPOSED PRIVATE STORM WATER PIPE (TYP) IMPACT W5 — PERMANENT ROADWAY CONSTRUC110N IMPACT TO WETLAND WATERS (0.318 AC t) EXISTING NON —JURISDICTIONAL • I Minn HOMERND TO BE FILLED CONSTRUC110N FOR An I I 1 I ,h 3 I 1 I GRAPHIC SCALE 150 300 ( IN FEET ) M LOT:8 0.64 AC PROPOSED ROADWAY (TYP) EXISTING WATER — MAIN (TYP) EXISTING NON —JURISDICTIONAL WETLAND TO BE FILLED FOR U11UTY CONSTRUC110N 0.64 AC LOT:14 0.82 AC IMPACT W2 — PERMANENT RESIDENTIAL CONSTRUCTION IMPACT TO WETLAND WATERS (0.001 AC t) LOT: 18 1.02 AC LOT:15 0.95 AC PROPOSED PUBUC WATER EXTENSION (TYP) LOT:19 0.92 AC NN IMPACT WI —PERMANENT RESIDENTIAL CONSTRUC110N IMPACT TO WETLAND WATERS (0.147 AC ±) NOTES: 1—TEMPORARY DISTURBED WETLAND AREAS WALL HAVE WETLAND SOILS RETURNED TO PRE —CONSTRUCTION GRADE. TEMPORARY DISTURBED WETLANDS WILL BE RE —VEGETATED MTH A NA11VE WETLAND SEED MIX (ERNMX-308 NC PIEDMONT FACW MIX, ERNMX-305 NC MOUNTAIN FACW MIX. OR EQUIVALENT) AND STABIUZED WITH COIR MATTING. EXISTING STREAM SURVEYED BY ASSOCIATED LAND SURVEYORS LEA PERMANENT IMPACT TEMPORARY IMPACT NON —JURISDICTIONAL IMPACT UNIMPACTED WETLAND JURISDICTIONAL WATER OF THE US STREAM WETLAND IMPACTED LF IMPACTED AC WA WA WB IMPACTED AC SA 48.7(TEMPORARY) .006 (TEMPORARY) SB 0 0 .148(PERMANENT) .005 (TEMPORARY) .318(PERMANENT) TOTAL TEMPORARY 48.7 TOTAL PERMANENT 0 0.006 0 0.005 0.466 WGLA Engineering WGLA ENGINEERING, PLLC 724 5th AVENUE WEST HENDERSONVILLE, NC 28739 (828) 687-7177 WGLA.COM NC LICENSE P-1342 HAYWOOD PARK SUBDIVISION HENDERSON COUNTY NORTH CAROLINA \\ \\1111111111 �, / e i rm tvy NQcor Construction L. DE-\; , REVISIONS DATE DESCRIP110N Know what's below. Call before you dig. PROJECT NUMBER: 22130 DATE: 1-16-23 DRAWN BY: JRC CHECKED BY: JLD STREAM IMPACTS FIGURE 5.0 SCALE: 1 "=150' ision\dwgAStream Impact Exhi \ USERS \Jared\Graef —Ha ywood Crossing NATURAL GROUND 1—.1 1~ 2+ NDO 2A.':: CB ,` EXCAVATED �•�� 4 MATERIAL TEMP. 18' CMP FOR STREAM FLOW FILTER FABRIC CLASS B RIPRAP (REMOVE AFTER CONSTRUCTION CR REUSE FOR STREAM BANK STABILIZATION) 6' OF #57 WASHED STONE WIDTH VA ES 10' SECTION B—B NOTE ALL DISCHARGE FROM DEWATERING THE WORK AREA SHALL BE PUMPED TO EITHER A TEMPORARY SEDIMENT TRAP OR DEWATERING SILT BAG PER DETAILS 4' MIN. 2' SECTION A —A TEMP. 18- CMP FOR STREAM FLOW SANDBAGS STREAM BED PROPOSED WATER OR SEWER UNE NOTE: STABIUZE STREAM BANK PER DETAIL AFTER PIPE INSTALLATION 6" OF #57 WASHED STONE B B NATURAL GROUND EXTEND FILTER FABRIC 12' INTO CHANNEL BANK CLASS 8 RIPRAP (18' MINIMUM THICKNESS) PLAN FILTER FABRIC BLANKET (MIRAFI 140N OR APPROVED EOUAL) TOP STREAM BANK 7 A ANDBAGS TEMP. 18' CMP FOR STREAM FLOW PROPOSED WATER OR SEWER UNE RIPRAP DAM DATE: 01/12/2019 SS-D DWG. NO. 21 SCALE: NOT TO SCALE City of Hendersonville Engineering Department 305 Williams Street Hendersonville, NC 28792 (828) 697-3000 (office) www.cityofhendersonville.org WGLA Engineering SMALL CREEK CROSSING WGLA ENGINEERING, PLLC 724 5th AVENUE HENDERSONVILLE, NC 28739 (828) 687-7177 WGLA.COM NC LICENSE P-1342 HAYWOOD PARK SUBDIVISION Henderson County North Carolina Stream Impacts Figure 5.1 Job #: 22130 Date: 10-31-22 Scale: NTS NOTE: - MATTING SHALL BE COIR FIBER, 750 GRAM PER SQ. METER WITH NOMINAL 0.50 IN. OPENING SIZE. - TO BE USED FOR MINOR STREAM CROSSING LOCATIONS. - SEEDING TO BE RIPARIAN MIX (ERNST MIX 304, ERNST MIX 307 OR EQUIVALENT) ANCHOR MATTING IN 8" TRENCH 1' MIN. I -I SMOOTH SURFACE, REMOVE ALL DEBRIS AND SEED/MULCH BEFORE PLACING MATTING 2:1 MAX SLOPE FOR SIDE OF BANK MATTING ANCHORED 1' BELOW STREAM OR WETLAND BED WGLA Engineering MATTING PLACED FLUSH WITH BANK SURFACE, LAP OVER DOWNSTREAM/DOWN SLOPE SEAMS 12" WOOD STAKE PLACED IN 3' O.C. DIAMOND PATTERN STREAM BED EXTEND MATTING A MIN. OF 6" BELOW WETLAND BED. STREAM BANK STABILIZATION DETAIL NOT TO SCALE C 0\\0\11111 iii if CAR /// / NotFor L.DE WGLA ENGINEERING, PLLC 724 5th AVENUE HENDERSONVILLE, NC 28739 (828) 687-7177 WGLA.COM NC LICENSE P-1342 HAYWOOD PARK SUBDIVISION Henderson County North Carolina Stream Impacts Figure 5.2 Job #: 22130 Date: 10-31-22 Scale: NTS Watershed Management (Low Density) Permit Permit WSWS 2022-11-01 HENDERSON COUNTY WATERSHED MANAGEMENT PERMIT LOW DENSITY RESIDENTIAL SUBDIVISION VEGETATIVE SWALES W/O CURB & GUTTER In accordance with the provisions of Article 21 of Chapter 143, General Statutes of North Carolina as amended, and other applicable Laws, Rules and Regulations PERMISSION IS HEREBY GRANTED TO Haywood Park, LLC Haywood Park Subdivision (20 Lot) 3676 Haywood Rd, Hendersonville, NC Includes REID: 1009440; 1007063; 1007064; 1008510; 1008511; 1009439; 1009441 Permit Number: WSWS-2022-11-01 FOR THE construction, operation, and maintenance of a low -density development utilizing vegetated conveyances and piping (where unavoidable) and discharged to unnamed tributary in compliance with the provisions set forth in Henderson County Code Chapter 42 Land Development Code Article VIII Sub -part B as amended as well as Article 21 of Chapter 143 of the North Carolina General Statutes (hereafter referred to as the "water supply watershed rules") and the approved water supply watershed management plans and specifications and other supporting data on file with by the Henderson County Site Development Department, Water Supply Watershed Management Program and considered a part of this perniit. The Permit shall be effective from the date of issuance until rescinded and shall be subject to the following specific conditions and limitations: I. DESIGN STANDARDS 1. This permit covers the construction of 212,121 square feet of permanent built- upon area (impervious surface) on this 20.39-acre tract of land. 2. The overall tract built -upon area percentage for the project must be maintained at or below 24%, as required by Section 15A NCAC 02B.0624 of the stormwater rules for the Upper French Broad River - Water Supply Watershed WS-IV protected area (WS-IV-P). 3. Approved plans and specifications for projects covered by this permit are incorporated by reference and are enforceable parts of the permit and shall be kept on file by the permittee at all times. 4. The only runoff conveyance systems allowed will be vegetated conveyances such as swales with minimum side slopes of 3:1 (H:V) as defined in the stormwater rules and approved by this division. 5. No piping is allowed except that minimum amount necessary to direct runoff beneath an impervious surface such as a road or to provide access. 6. The built -upon areas associated with this project shall be located at least 30 feet landward of all perennial and intermittent surface waters. Page 1 of 5 Watershed Management (Low Density) Permit Permit WSWS 2022-11-01 7. All temporary built -upon area that is not shown on the approved stormwater plan as a permanent built -upon area, and that is shown on the approved sedimentation erosion control plan, shall be removed and the area restored to a vegetated state when that area is no longer needed, or prior to final inspection per the requirements of the approved sedimentation erosion control plan, or within 30 days of project completion, whichever occurs first. IL SCHEDULE OF COMPLIANCE 1. The permittee is responsible for verifying that the proposed built -upon area does not exceed the allowable built -upon area. 2. The Water Quality Administrator may notify the permittee when the permitted site does not meet one or more of the minimum requirements of the permit. Within the time frame specified in the notice, the permittee shall submit a written time schedule to the Water Quality Administrator for modifying the site to meet minimum requirements. The permittee shall provide copies of revised plans and certification in writing to the Water Quality Administrator that the changes have been made. 3. This project may not be sold or subdivided in whole or in part without first receiving a permit modification from this agency. 4. Prior to the subdivision and/or sale of this project, in whole or in part, the following deed restrictions must be recorded with the Office of the Register of Deeds for Henderson County: a) The following covenants are intended to ensure ongoing compliance with Local Program Watershed Management Permit Number 2022-11-01, as issued by the Site Development Department, Water Supply Watershed Management program b) Henderson County Site Development Department is made a beneficiary of these covenants to the extent necessary to maintain compliance with the watershed management permit. c) These covenants are to run with the land and be binding on all persons and parties claiming under them. d) The covenants pertaining to stormwater management may not be altered or rescinded without the express written consent of the Site Development Department, Water Supply Watershed Management program. e) Alteration of the drainage as shown on the plans may not take place without the concurrence of the Site Development Department, Watershed Management Program. f) This project is permitted for a maximum of 212,121 square feet of built upon area. Construction of additional built upon area in excess of this amount will require a permit modification. g) This project may not be sold or subdivided in whole or in part without first receiving a permit modification from the Site Development, Watershed Management Program. h) Construction of additional impervious areas such that low -density requirements are no longer met will require a permit modification prior to construction. An engineered system will be required to collect and treat the runoff from all built upon areas associated with the project, including that area permitted under the low -density option. Page 2 of 5 Watershed Management (Low Density) Permit Permit WSWS 2022-11-01 j) Filling in or piping of any vegetative conveyances (ditches, swales, etc.) associated with this development, except for average driveway crossings, is strictly prohibited by any persons. The built upon area shall be located a minimum of 30 feet landward of all perennial and intermittent surface waters. 5. A copy of the recorded restrictions must be received in this Office within 30 days of the date of sale. 6. Filling in or piping of any vegetative conveyances (ditches, swales, etc.) associated with the permitted development, except for average driveway crossings, is strictly prohibited by any persons. 7. The permittee shall submit to the Water Quality Administrator and shall have received approval for revised plans, specifications, and calculations prior to construction, for any modification to the approved plans, including, but not limited to, those listed below: a. Any revision to the approved plans, regardless of size. b. Project name change. c. Transfer of ownership. d. Redesign or addition to the approved amount of built -upon area. e. Further subdivision, acquisition, or sale of the project area in whole or in part. The project area is defined as all property owned by the permittee, for which Sedimentation and Erosion Control Plan approval was sought. f. Filling in, altering or piping any vegetative conveyance shown on the approved plan. 8. Swales and other vegetative conveyances shall be constructed in their entirety, vegetated, and be operational for their intended use prior to the construction of any built upon surface. 9. During construction, erosion shall be kept to a minimum and any eroded areas of the swales or other vegetated conveyances will be repaired immediately. 10. The permittee shall at all times provide the operation and maintenance necessary to operate the permitted stormwater management systems at optimum efficiency to include: a. Inspections b. Sediment removal. c. Mowing, and re -vegetating of the side slopes. d. Immediate repair of eroded areas. e. Maintenance of side slopes in accordance with approved plans and specifications. 11. Within 30 days of completion of the project, the permittee shall certify in writing that the project has been constructed in accordance with the approved plans. See attachments to this permit for official forms. 12. The penmittee shall submit all information requested by the Water Quality Administrator or his representative within the time frame specified in the written information request. III. GENERAL CONDITIONS 1. This peiiiiit is not transferable to any person or entity except after notice to and approval by the Water Quality Administrator. The Water Quality Administrator may require modification or revocation and re -issuance of the permit to change the name and incorporate such other requirements as may be necessary. In the event of a name or Page 3 of 5 Watershed Management (Low Density) Permit Permit WSWS 2022-11-01 ownership change, a completed Name/Ownership Change form, signed by both parties, must be submitted to Henderson County Site Development Department, Watershed Management Program, accompanied by the supporting documentation as listed on page in the form. The approval of this request will be considered on its merits and may or may not be approved. 2. The permittee is responsible for compliance with all permit conditions until the Water Quality Administrator approves a request to transfer the permit. Neither the sale of the project nor the transfer of common areas to a third party, such as a homeowner's association, constitutes an approved transfer of the stormwater permit. 3. Failure to abide by the conditions and limitations contained in this permit may subject the Permittee to an enforcement action by the Water Quality Administrator, in accordance with Chapter 42 Land Development Code Article XII Enforcement, Violations, and Appeals - §42-377 and N.C.G.S. 143-215.6A - 143-215.6C. The issuance of this permit does not prohibit the Water Quality Administrator from reopening and modifying the permit, revoking, and reissuing the permit, or terminating the permit as allowed by the laws, rules, and regulations contained in Henderson County Code Chapter 42 Land Development Code Article XII Enforcement, Violations, and Appeals - §42-377, Session Law 2008-211 and Title 15A NCAC 2H.1000 of the North Carolina Administrative Code Subchapter 2H.1000; and North Carolina General Statute 143-215.1 etal. 5. In the event that the facilities fail to perform satisfactorily, including the creation of nuisance conditions, the Penmittee shall take immediate corrective action, including those as may be required by the Water Quality Administrator, such as the construction of additional or replacement stormwater management systems. 6. The permittee grants permission to Site Development Staff to enter the property during normal business hours, for the purpose of inspecting all components of the stormwater management facility. 7. The permit issued shall continue in force and effect until revoked or terminated. The pen -nit may be modified, revoked, and reissued or terminated for cause. The filing of a request for a permit modification, revocation and re -issuance, or termination does not stay any permit condition. 8. Unless specified elsewhere, permanent seeding requirements for the swales must follow the guidelines established in the North Carolina Erosion and Sediment Control Planning and Design Manual. 9. Approved plans and specifications for this project are incorporated by reference and are enforceable parts of the permit. 10. The issuance of this permit does not preclude the Permittee from complying with any and all statutes, rules, regulations, or ordinances, which may be imposed by other government agencies (local, state, and federal), which have jurisdiction. 11. The permittee shall notify Site Development in writing of any name, ownership, or mailing address changes at least 30 days prior to making such changes. 12. NCDOT approved permit shall be provided to this office once received from DOT. 13. 401/404 approved permit shall be provided to the office once received from USCOE/DWQ. Page 4of5 Watershed Management (Low Density) Permit Permit WSWS 2022-11-01 14. Planning Department approval for subdivision provided to the office once received from Henderson County Planning Department. Permit issued this the 21 st day of November 2022. Natalie J Be Water Quality Administrator Site Development Department Henderson County Government I, certify that the project will be constructed in conformance with the approved plans, that the required deed restrictions and protective covenants will be recorded, and that the proposed project complies with the requirements of the applicable water supply watershed rules any other applicable Henderson County water supply watershed requirements such as submitting the as - built documents, and engineer certifications as described in this permit. Developer/Owner/Applicant Name Developer/Owner/Applicant Signature Los 6e- Attachments: HAYWOOD PARK SUBDIVISION LD DESIGNER AS -BUILT (REQUIRED) 12-22-2021 DOCUMENT HAYWOOD PARK SUBDIVISION LD PERMITEE AS -BUILT (REQUIRED) 12-22-2021 DOCUMENT HAYWOOD PARK SUBDIVISION GENERAL MDC AS -BUILT (REQUIRED) 12-22-2021 DOCUMENT Page 5 of 5