HomeMy WebLinkAboutNC0022730_Authorization to Construct_20040204/i%GDD 2Z730 dMP Dave Goodrich NC DENR / DWQ / NPDES Unit 1617 Mail Service Center Raleigh, NC 27699-1617 Dear Dave: DAVIS - MARTIN - POWELL & ASSOCIATES, INC. ENGINEERING • LAND PLANNING • SURVEYING 218 GATEWOOD AVENUE • SUITE 102 HIGH POINT, NC 27262 PHONE (336) 886-4821 • FAX (336) 886-4458 February 4, 2004 Re: Town of Beech Mountain Grassy Gap WWTP Project E-3161 ATC 02273^A01 Enclosed please find the Engineers Certification for the above referenced project. The Town will place the relocated effluent pipe in operation on February 9, 2004. Please note that during construction the equalization weir modifications were deleted, and a throttling valve added to the equalization pump discharge to provide better control of the flow rates. Also, please note that the facility location on the ATC has been corrected. If you have any questions, or need additional information, please feel free to give me a call. Sincerely, DAVIS-MARTIN-POWELL & ASSOCIATES Midh�?j L.,"slush r, PE MLS/ DocumenN file State of North Carolina Department of Environment and Natural Resources Division of Water Quality Aia K Michael F. Easley, Governor NCDENR William G. Ross, Jr., Secretary Alan W. Klimek, P.E., Director PROFESSIONAL ENGINEER'S CERTIFICATION FOR CONSTRUCTION OF WASTEWATFR TREATMENT FACILITIES ATC PROJECT NUMBER: 022730A01 Town of Beech Mountain — Grassy Gap W WTP NPDES Permit No. NCO022730 I Michael L. Slusher am a duly registered Professional Engineer 01-1 n•q in the State of North Carolina and have been authorized to observe (circle o : periodical) , weekly, full time) the construction of the subject project for the Permittee: Project No.: 022730A01 Project Grassy Gap WWTP Effluent Relocation Watauga County Location: N68R 152 Grassy Gap Creek Road Beech Mountain, NC The project consists of: • A new effluent pump station with two pumps, each capable of pumping up to 340,000 gpd • The installation of standby power generation with sufficient power to run one treatment train • Relocation of the outfall line to a point at the confluence of Grassy Gap Creek and Buckeye Creek • Modifications to the current equalization system and replacement of equalization pump impellers Revised to add a throttling valve to the existing pumps. • The addition of the Grassy Gap W%V P into the Town's existing monitoring system such that alarm conditions and loss of power may be indicated remotely at the Public Works Building I hereby certify that I did regularly observe this project with due care and diligence and that the construction was completed in substantial conformance with the Authorization to Construct and with the a roved plans and specifications. Signature Registration No. NC 20590 Date Fel ruari. 4. 2004 Upon completion of construction and prior to operation of the modified facility, the Permittee shall provide thi Division with a certification from a professional engineer certifying that the permitted facility has been installed it accordance with the NPDES Permit, this Authorization to Constrict, and the approved plats and specifications. The Certification should be submitted to: NCDENRIDWQ, NPDES Unit, 1617 Mail Service Center, Raleigh, North Carolina 27699-1617 State of North Carolina Department of Environment and Natural Resources Division of Water Quality Michael F. Easley, Governor William G. Ross, Jr., Secretary Alan W. Klimek, P.E., Director Mr. Seth Lawless, Town Manager Town of Beech Mountain 403 Beech Mountain Parkway Beech Mountain, North Carolina 28604-8012 Dear Mr. Lawless: ern NCDEHR February t0,2003 Subject: Authorization to Construct ATC No. 022730A01 NPDES Permit No. NCO022730 Grassy Gap Wastewater Treatment Plant Watauga County The Division of Water Quality's NPDES Unit has reviewed your request for an Authorization to Construct (ATC) at the Grassy Gap Wastewater Treatment Plant and finds the proposed improvements to be satisfactory and hereby grants authorization for: A new effluent pump station capable of pumping up to 340,000 gpd with only one functioning PUMP. • The installation of standby power generation with sufficient power to run one treatment train in the event of a power outage. • Relocation of the outfall line to a point at the confluence of Grassy Gap Creek and Buckeye Creek. Modifications to the current equalization system and replacement of equalization pump impellers. • The addition of the Grassy Gap WWTP into the Town's existing monitoring system such that alarm conditions and loss of power may be indicated remotely at the Public Works Building. This Authorization to Construct is issued in accordance with NPDES Permit No. NC0022730, issued December 27, 2001, and shall be subject to revocation unless the wastewater treatment facilities are constructed in accordance with the terms and conditions of the permit. This ATC does not alter the existing permitted flow of 0.08 MGD. The Permittee shall notify the Water Quality Supervisor of the Winston-Salem Regional Office, telephone number (336) 7714600, at least forty-eight (48) hours prior to operation of the installed facilities, so that an in -place inspection can be made. Notification shall be made during the normal office hours of 8:00 a.m. until 5:00 p.m., Monday through Friday. 1617 Mail Service Center, Raleigh, North Carolina 27699-1617 An Equal Opportunity Affirmative Action Employer Telephone (919) 733-5083 FAX (919)733-0719 Internet: hnp://h2o.enr.state.nc.us/ Grassy Gap WWTP NPDES Permit No. NCO022730 ATC No. 022730A01 Page 2 Engineer's Certification Upon completion of construction and prior to operation of the modified facility, the Permittee shall provide the Division with a certification (copy enclosed) from a professional engineer registered in North Carolina certifying that the permitted facility has been installed in accordance with the NPDES Permit, this Authorization to Construct, and the approved plans and specifications. The Certification should be submitted to: NCDENR / DWQ, NPDES Unit, 1617 Mail Service Center, Raleigh, North Carolina 27699-1617. Reauirements for Certified Ouerator The Permittee shall employ a certified wastewater treatment plant operator to be in responsible charge (ORC) of the wastewater treatment facilities. The operator must hold a certificate of the type and grade at least equivalent to or greater than the classification assigned to the wastewater treatment facilities by the Certification Commission. The Permittee must also employ a certified back-up operator of the appropriate type and grade to comply with the conditions of Title 15A, Chapter 8G, .0200. The ORCof the facility must visit each Class I facility at least weekly and each Class It, III, and IV facility at least daily, excluding weekends and holidays; and must properly manage and document daily operation and maintenance of the facility and comply with all other conditions of Title I5A, Chapter 8G, .0200. Additional Requirements The Operational Agreement between the Permittee and the Environmental Management Commission is incorporated herein by reference and is a condition of this Permit. Noncompliance with the terms of the Operational Agreement shall subject the Permittee to all sanctions provided by G. S. 143-215.6 for violation of or failure to act in accordance with the terms and conditions of this Permit. Failure to abide by the requirements contained in this Authorization to Construct may subject the Permittee to an enforcement action by the Division of Water Quality in accordance with North Carolina General Statute 143-215.6A to 143-215.6C. The issuance of this Authorization to Construct does not preclude the Permittee from complying with any and all statutes, rules, regulations, or ordinances which may be imposed by other government agencies (local, state, and federal) which have jurisdiction. The Permittee shall maintain a copy of the approved plans and specifications on file for the life of the facility. One (1) copy of the approved plans and specifications is enclosed for your records. If you have any questions about this Authorization to Construct, please contact Natalie Sierra, at (919) 733- 5083, extension 551. Sincerely, 'Alan W. Klimek, PE Enclosures: Project Plans and Specifications (approved) Engineer's Certification Form cc: Winston-Salem Regional Office, Water Quality Technical Assistance and Certification Unit Central Files INUMMOM Mr. . — Davis -Martin -Powell & Associates, Inc. 218 Gatewood Avenue High Point, North Carolina 27262 ATC SUMMARY SCOPE Town of Beech Mountain Banner Elk, NC ATC No. 02273OA01 Grassy Gap Creek, Class C Watauga River Basin, 040201 Watauga County The scope of the project includes modifications to the current equalization system, a new effluent pump station and outfall line to Buckeye Creek, and installation of standby power. RECOMMENDATIONS 1. Approve modifications to the existing equalization system 2. Approve installation of an effluent pump station 3. Approve installation of an effluent force main (outfall) to Buckeye Creek 4. Approve installation of standby power REVIEW SUMMARY Executive Summary The treatment works currently consist of: • Influent bar screen • Equalization • Flow control box *Dual path aeration basins and clarifiers • Chlorine disinfection • Dechlorination The facility is having difficulty meeting its current BAT limits for ammonia nitrogen (2 mg/L in the summer and 4 mg/L in the winter). In order to achieve greater dilution and obtain less stringent ammonia limits, Beech Mountain has proposed moving the discharge to nearby Buckeye Creek, which provides nearly five times the dilution of the current receiving stream. Speculative limits were provided for this discharge point and a draft permit has been released with these limits (July 2002). In addition to the new effluent pump station and outfall, some modifications are proposed for the equalization system such that all inflow is directed to the equalization zone (instead of to the aeration basins) first, then on to the aeration basins. This improved schematic should facilitate treatment of the wastewater. Diesel fueled backup power sufficient to run one treatment train is also being proposed -end- Pagel ATC REVIEW NOTES Town of Beech Mountain ATC No. 022730A01 Watauga County Project Name: Grassy Gap WWTP Effluent Relocation Applicant: Mr. Seth Lawless Town of Beech Mountain 403 Beech Mountain Parkway Beech Mountain, North Carolina Application/Plans Prepared by: Michael Slusher, P.E. Davis -Martin -Powell & Associates, Inc. High Point, North Carolina Project Location: Grassy Gap WWTP Grassy Gap Creek Road Near Beech Mountain Watauga County Chronology: APP RECD 09/05/02 REVIEWED 11/5/02 ACKNOWLEDGED 10/18/02 SCHTOISSUE 02/17/03 STAFF RPT REQS 10/ 18/02 ADD INFO REQS STAFF RPT RECD 11/ 15/02 ADD INFO RECD Submissions: • Letter of 1Y-ansmittal • Engineering Plans and Specifications • Executive Summary Effluent Pumps Number of pumps: two Pump type: 8.75" Impeller, -1625 RPM, 15 -HP Pump capacity: 250 gpm at 55 ft. TDH Effluent Piping Material proposed: either ductile iron pipe or PVC pressure pipe Diameter: 6" Review Notes: The reconfiguration of the equalization basin requires a new inlet chute that will divert flow from the headworks into the equalization basin. The impellers will be replaced on the equalization pumps to minimize flow surges by pumping closer to the design rate. If the equalization basin fills, the wastewater overflow will flow into the influent channel, where it will be diverted to the aeration basins. A new flow control box will control the flow from the equalization basin into the aeration basins and will assist in maintaining an even flow rate into the aeration basins. The above improvements should assist in making the aeration basins more efficient in pollutant removal. The effluent pumps are capable of pumping over 2.5 times the design flow (80,000 gpd) with one pump out of service. High water and other visual alarms will be installed on the pump station. Page 2 ATC REVIEW NOTES Town of Beech Mountain ATC No. 022730A01 Watauga County Since the W W1P does not currently have standby power, a generator is proposed that would allow one treatment train to function in the event of a power loss. Compatibility with existing equipment: The proposed project is compatible with the existing treatment system and adds a measure of operational control and safety to the plant. The feed points will be identical to what they are with the chlorine gas system. Recommendations I recommend that the Authorization to Construct be issued. The improvements delineated in this ATC allow for more reliability (by adding backup power where there was none before and reconfiguring the equalization basin for optimum treatment) and possibly better treatment. The Division has already given approval for the relocation of the outfall and this work should be done as soon as possible. Page 3 e ea�,� Selz sew 4 71� olk o co (�G f�. TD4 Beech Mountain. Grassy Gap WWTP Subject: Beech Mountain, Grassy Gap WWTP Date: Wed, 6 Nov 2002 13:50:23 -0500 From: "Mike Slusher" <mslusher@dmp-inc.com> To: "Natalie Sierra \(E-mail\)" <Natalie.Sierra@ncmail.net> CC: "Seth Lawless \(E-mail\)" <beechmtntown@skybest.com> Town of Beech Mountain Grassy Gap WWTP ATC 022730A01 Natalie, Please find the additional information we discussed this morning. Sheet 4. WWTP Modifications The equalization inlet channel was originally designed to flow directly into aeration basins, with overflow weirs directing flows above 80,000 GPD into the equalization basin. This arrangement has not satisfactory reduced intermittent flow peaks, and we are modifying the inlet to divert all flow into the equalization basin. ❑ Equalization Pumps are existing, however the impellers will be replaced (see Note 7), this will minimize the flow surges by pumping closer to the 80,000 GPD rate. All flow will now be pumped through the WWTP, unless the inflow into the plant fills the equalization tank, when will overflow into the influent channel and pass thru the aeration basins. ❑ Proposed Inlet Chute (see Flow Control Box Detail, lower left corner) will divert inflow into the equalization basin. ❑ Proposed Flow Control Box is designed to minimize turbulence from the EQ Pump discharge and combined with relocating the existing V-Notch Weirs (to provide a longer approach channel) will improve both the flow spit and the ability to maintain an even flow rate. ❑ One broken EQ pump check valve will be replaced. ❑ Detail A — these End Plates are proposed to fill the gap between the two halves of the package plant to prevent surface runoff from entering the WWTP. u EQ basin volume is 20,160 gallons (25% capacity). Electrical The WWTP currently does not have standby power. The proposed standby generator will be sufficient to operate the uncontrolled load, one EQ pump, one blower, and the lead effluent pump. 11/6/02 1:56 PM ,a Bqech Mountain. Grassy Gap W WTP Effluent Outfall / Forcemain Pipe material will be either ductile iron or PVC pressure pipe, SDR 21. (Spec page 02730-1,2) Entire forcemain will be 6" diameter (labeled on profile). There is no flap valve proposed at the discharge The effluent pumps have been sized to pump 360,000 GPD, which exceeds the highest recorded flow rate (340,000 GPD). The Town began construction on the first phase of sewer system I/I rehab in this basin in October, which should significantly reduce the I/I problem. Funding is being sought for continued I/I rehab projects. We are completing a 201 Plan Amendment to qualify for SRF funding. I hope this helps your review. If you have any further questions, please feel free to call. Mike Slusher, PE Davis -Martin -Powell & Associates (336) 886-4821 / Fax (336) 886-4458 mailto:MS[usher(@dmp-inc.com 2 of 2 11/6/02 1:56 PM A Cc: Permits and Engineering Technical Support Branch County Health Department Central Files WSRO SOC PRIORITY PROJECT: YES NO X IF YES, SOC No. To: Permits and Engineering Unit Water Quality Section Attention: Natalie Sierra AUTHORIZATION TO CONSTRUCT NPDES PERMIT REPORT AND RECOMMENDATIONS Date: November 12, 2002 County: Watauga Permit No.: NCO02273OA01 PART I -GENERAL INFORMATION 1. Facility Name and Current Address: Town of Beech Mountain, Grassy Gap Wastewater Treatment Plant 403 Beech Mountain Parkway Beech Mountain, NC 28604-8012 2. Date of most recent Staff Report: August 16, 1995 3. Changes since previous action on NPDES Permit: Moratorium in effect since 12/00 4. Verify Discharge Point(s) on plans with current NPDES Permit. List for all discharge points. Latitude: 36 13' 19" Longitude: 81 54' 20" Attach a USGS map extract and indicate treatment facility site and discharge point on map. U.S.G.S. Quad No. C-I I SW U.S.G.S. Quad Name Elk Park 5. Treatment Plant Classification: III PART II — DESCRIPTION OF DISCHARGE AND TREATMENT WORKS 1. Existing treatment facility a. What is the current capacity of the facility? 0.08 mgd b. What is the actual treatment capacity of the current facility (design volume)? 0.08 mgd c. Please provide a description of existing or substantially constructed wastewater treatment facilities. Includes a 0.08 mgd extended aeration package plant consisting of influent flow equalization, instrumented flow measurement, manual bar screens, aeration tanks, clarifiers, liquid chlorine feeding, chlorination chamber, dechlorination, and sludge holding tanks. 2. Please provide a description of proposed wastewater treatment facilities: A 250 GPM effluent pump station and forcemain to the proposed discharge at the confluence of Buckeye Creek and Grassy Gap Creek, per 2001 permit modification. A standby generator sized to operate major treatment components including the effluent pump station in the event of a power failure. Modifications to the existing flow equalization system to minimize process surges. 3. Residuals handling and utilization/disposal scheme: a. If residuals are being land applied, please specify DENR Permit No. na b. Residuals stabilization: PSRP_ PFRP X C. Landfill: na d. Other disposal/utilization: Distribution of Class A Residuals via permit no. W00002523. Residuals are hauled from the site to the Pond Creek plant for dewatering and composting or are disposed of using a pump truck and are hauled to a municipal wastewater treatment plant. 4. Important SOC, JOC, or Compliance Schedule dates, if applicable: SOC currently in draft form. Dates are not final. PART III — EVALUTION AND RECOMMENDATIONS Recommendation is made to issue the Authorization To Construct in accordance with division policy. 4,r L (i Signature of Report Preparer Water Qua ty Supervisor 2-- Date