Loading...
HomeMy WebLinkAboutNC0000175_Authorization to Construct_19990322State of North Carolina Department of Environment and Natural Resources Division of Water Quality James B. Hunt, Jr., Governor Wayne McDevitt, Secretary Kerr T. Stevens, Director March 22, 1999 Mr. Jeffrey Ferguson Unimin Corporation 300 Crystal Drive Spruce Pine, North Carolina 28777 AM15VA T41 0 DEN R Subject: Authorization to Construct NC0000175; ATC#000 I 75ACC Unimin Quartz Operation Mitchell County Dear Mr. Ferguson: A letter of request for Authorization to Construct was received by the Division on September 17, 1998 with additional data received January 26, 1999, and final plans and specifications for the subject project have been reviewed and found to be satisfactory. Authorization is hereby granted for the construction of facilities at the Unimin Quartz Plant- Spruce Pines wastewater treatment system, which discharges via NPDES- permitted Outfall 001 into the North Toe River (Class C Trout) in the French Broad River Basin. Specifically, authorization is granted for the following construction activities: • Replacement of the JADAIR pretreatment unit with a new 30 -foot clarifier for solids removal. This Authorization to Construct is issued in accordance with Part III, Section F(1) of NPDES Permit No. NC0000175 issued January 22, 1997, and shall be subject to revocation unless the wastewater treatment facilities are constructed in accordance with the conditions and limitations specified in Permit No. NC0000175. Failure to abide by the requirements contained in this Authorization to Construct may subject the Permittee to an enforcement action by the Division of Water Quality in accordance with North Carolina General Statute 143- 215.6A to 143- 215.6C. The issuance of this Authorization to Construct does not preclude the Permittee from complying with any and all statutes, rules, regulations, or ordinances which may be imposed by other government agencies (local, state, and federal) which have jurisdiction. The sludge generated from these treatment facilities must be disposed of in accordance with G.S. 143 -215.1 and in a manner approved by the North Caroline Division of Water Quality. The Operational Agreement between the Permittee and the Environmental Management Commission is incorporated herein by reference and is a condition of this permit. Noncompliance with the terms of the Operational Agreement shall subject the Permittee to all sanctions provided by G.S. 143 -215.6 for violation of or failure to act in accordance with the terms and conditions of this permit. Upon classification of the facility by the Certification Commission, the Permittee shall employ a certified wastewater treatment plant operator to be in responsible charge (ORC) of the wastewater treatment facilities. The ORC must hold a certificate of the type and grade at least equivalent to or greater than the classification assigned to the wastewater treatment facilities by the Certification Commission. The Permittee must also employ a certified back -up operator of the appropriate type and grade to comply with the conditions of Title 15A, Chapter 8A, .0202. P.O. Box 29535, Raleigh, North Carolina 27626 -0535 Telephone 919 - 733 -5083 FAX 919 -733 -0719 An Equal Opportunity Affirmative Action Employer 50% recycled/ 10% post- consumer paper Authorization to Construct ATC# 000175ACC; NC0000175 Unimin Corp.- Quartz Operation, Spruce Pine March 22, 1999 Page 2 In the event that the facility fails to perform satisfactorily, including the creation of nuisance conditions, the Permittee shall take immediate corrective action, including those as may be required by this Division, such as the construction of additional or replacement wastewater treatment or disposal facilities. The Asheville Regional Office, telephone number (828) 251 -6208, shall be notified at least forty- eight (48) hours in advance of operation of the installed facilities so that an on -site inspection can be made. Such notification to the regional supervisor shall be made during the normal office hours from 8:00 a.m. until 5:00 p.m. on Monday through Friday, excluding State Holidays. Upon completion of construction and prior to operation of this permitted facility, a certification must be received from a professional engineer certifying that the permitted facility has been installed in accordance with the NPDES Permit, this Authorization to Construct, and the approved plans and specifications. Mail the completed certification to: North Carolina DENR -DWQ, NPDES Unit, P.O. Box 29535, Raleigh, NC 27626 -0535. One (1) set of approved plans and specifications is being forwarded to you. A copy of the approved plans and specifications shall be maintained on file by the Permittee for the life of the facility. If you have any questions or need additional information, please contact Tom Belnick, telephone number (919) 733 -5083, extension 543. Sincerely, err T. Stevens cc: Central Files NPDES Unit Asheville Regional Office, Water Quality Technical Assistance and Certification Unit State of North Carolina Department of Environment, Health and Natural Resources Division of Environmental Management James B. Hunt, Jr., Governor Jonathan B. Howes, Secretary A. Preston Howard, Jr., P.E., Director Mr. Chuck Klimper, Plant Manager. UNIlVIIN - Quartz Operation P.O. Box 588 Spruce Pine, North Carolina 28777 Dear Mr. Klimper: December 22, 1995 low% IDEHNR Subject: Permit No. NC0000175 Authorization to Construct Tertiary Treatment - Fluorit Removal Mitchell County A letter of request for an Authorization to Construct permit for the UNIMIN Quartz Operation • Wastewater Treatment Facility was received November 16, 1995 by the Division and final plans and specifications for the subject project have been reviewed and found to be satisfactory. Authorization is [ hereby granted for additional fluoride removal treatment at the existing treatment facility for the quartz O plant. The following components shall be added under this Authorization to Construct: 32,000 gallon equalization tank; 900 gpm centrifugal process feed pump; 15,000 gallon reactor tank with mixer; polymer feed system; inclined plate type clarifier; 9000 gallon pumping tank to multimedia filter; 850 gpm multimedia centrifugal feed pump; 4, 78 inch diameter multimedia filters (garnet, sand, and anthracite) rated for 850 gpm and influent TSS up to 20 mg/1; 10,500 gallon effluent tank; 500 gpm centrifugal backwash pump from the effluent tank with backwash to the influent equalization tank; 800 gpm pump from effluent tank back to equalization tank (as necessary); diaphragm slurry transfer pump from clarifier; 15,000 gallon slurry tank with tank overflow directed to influent equalization tank; diaphragm type filter press feed pump; 75 cubic foot capacity filter press with filtrate directed back to the influent equalization tank and ultimate solids disposal to existing landfill; 12,500 gallon alum tank with diaphragm alum transfer pump to reactor tank; 1000 gallon lime tank and mixer with diaphragm lime transfer pump to reactor tank. All additions and improvements shall be as indicated in the approved plans and specifications including all the associated valves, piping, and appurtenances with discharge of treated wastewater to the North Toe River in the Fiench Broad River Basin. The filter press shall be appropriately sized to accommodate the percent solids estimated from the inclined plate clarifier and slurry tank. This Authorization to Construct is issued in accordance with Part III, Paragraph C of NPDES Permit No. NC0000175 issued July 15, 1993, and shall be subject to revocation unless the wastewater treatment facilities are constructed in accordance with the conditions and limitations specified in Permit No. NC0000175. 10 The sludge generated from these treatment facilities must be disposed of in accordance with G.S. 143 -215.1 and in a manner approved by the North Carolina Division of Environmental Management. P.O. Box 29535, PabkA North Carolina 27626 -0535 Telephone 919- 733 -5083 FAX 919- 733 -9919 An Equal Oppodw*y Affirmative Action Employer 50% recycled/ 10% post- consumer paper Permit No. NC0000175 Authorization to Construct UNIMIN Quartz Operation Page 2 In the event that the facilities fail to perform satisfactorily, including the creation of nuisance conditions, the Permittee shall take immediate corrective action, including those as may be required by this Division, such as the construction of additional or replacement wastewater treatment or disposal facilities. The Asheville Regional Office, telephone number (704) 251- 6208, shall be notified at least forty- eight (48) hours in advance of operation of the installed facilities so that an in -place inspection can be made. Such notification to the regional supervisor shall be made during the normal office hours from 8:00 a.m. until 5:00 p.m. on Monday through Friday, excluding State Holidays. Upon completion of construction and prior to operation of this permitted facility, a certification must be received from a professional engineer certifying that the permitted facility has been installed in accordance with the NPDES Permit, this Authorization to Construct and the approved plans and specifications. Mail the Certification to the Permits and Engineering Unit, P.O. Box 29535, Raleigh, NC 27626 -0535. A copy of the approved plans and specifications shall be maintained on file-b the Permittee for the life of the facility. Failure to abide by the requirements contained in this Authorization to Construct may subject the Permittee to an enforcement action by the Division of Environmental Management in accordance with North Carolina General Statute 143- 215.6A to 143- 215.6C. The issuance of this Authorization to Construct does not preclude the Permittee from complying O with any and all statutes, rules, regulations, or ordinances which may be imposed by other government agencies (local, state, and federal) which have jurisdiction. 0 One (1) set of approved plans and specifications is being forwarded to you. If you have any questions or need additional information, please contact Susan A. Wilson, telephone number 919/33- 5083, ext. 555. Sincerely, / . Presto oward, Jr., P.E. cc: Asheville Regional Office, Water Quality Central Files Mitchell County Health Department L • rstAi t fi State of North Carolina Department of Natural Resources and Community Development 512 North Salisbury Street • Raleigh, North Carolina 27611 James G. Martin, Governor April 19, 1985 S Thomas Rhodes, Secretary Mr. Dewey Hall, Jr., Southeast Area Manager International Minerals and Chemical Corporation P. 0. Box 545 Spruce Pine, North Carolina 28777 SUBJECT: Permit No. NC0000175 Authorization to Construct International Minerals and Chemical Corp. MRL Building Wastewater Treatment System Mitchell County Dear Mr. Hall: A letter of request for Authorization to Construct was received January 2, 1985, by the Division and final plans and specifications fo rthe subject project have been reviewed and found to be satisfactory. Authorization is hereby granted for the construction modifications to a 0.2592 MGD wastewater treatment facility consisting of three (3) stabilization ponds for containing neutralized waste from the mineral research laboratory, prior to processing by the, existing wastewater treatment plant. This Authorization to Construct is issued in accordance with Part III paragraph C of NPDES Permit No. NC0000175 issued September 18, 1980, and shall be subject to revocation unless the wastewater treatment facilities are constructed in accordance with the conditions and limitations specified in Permit No. NC0000175. The Permittee must employ a certified wastewater operator in accordance with Part III paragraph D of the referenced permit. The sludge generated from these treatment facilities must be disposed of in accordance with General Statutes 143 - 21501 and in a manner appiovible by the North Carolina Division of Environmental Management. In event the facilities fail to perform satisfactorily in meeting its NPDES permit effluent limits, International Mineral and Chemical'Corporation shall take such immediate corrective action as may be required by this Division, including the construction of additional wastewater treatment and disposal facilities. Three (3) monitor wells (1 upgrade and 2 downgrade) must be constructed to monitor changes in groundwater quality. These.wells should be sampled upon completion of construction and every March, July and November thereafter for the folowing constituents: Barium, Chromium, Arsenic, Lead, TDS, pH, and Water Levels. The exact locations and construction details should be approved by the Asheville Regio �07�r�e� North Cardin 27611.76V Telephone 914733.4984 Contd . An Equal opportw,ity / Affirmative Action Employer I f 'r SIAT! tt n T State of North Carolina Department of Natural Resources and Community Development Division of Environmental Management 512 North Salisbury-Street 9 Raleigh, North Carolina 27611 fames G. Martin, Governor May 11, 1988 R. Paul Wilms S Thomas Rhodes, See ry Director Mr. Roy Riddle, Environmental Manager Unimin Quartz Operation P.O. Box 588 Bakersville Highway Spruce Pine, N. C. 28777 SUBJECT: Permit No. NC0O0O175 Authorization to Construct' Unimin Quartz Operation Floride Removal Equipment Mitchell County Dear Mr. Riddle: A letter of request for an Authorization to Construct was received March 21, 1988, by the Division and final plans and specifications for the subject project have been reviewed and found to be satisfactory. Authorization is hereby granted for the additional construction of floride removal equipment to the existing wastewater treatment facility. This equipment shall consist of a polymer mixing tank and pump, a water clarification module with floculation and clarification stages and a solids holding bin. This Authorization to Construct is issued in accordance with Part III paragraph C of the NPDES Permit No. NC0OOO175 issued February 25, 1987, and shall be subject to revocation unless the wastewater treatment facilities are constructed in accordance with the conditions and limitations specified in Permit No. NC000O175. The Permittee must employ a certified wastewater operator in accordance with Part III paragraph D of the referenced permit. The sludge generated from these treatment facilities must be disposed'of in accordance with G.S. 143 -215.1 and in a manner approvable by the North Carolina Division of Environmental Management. In event the facilities fail to perform satisfactorily in meeting its NPDES permit effluent limits, the permittee shall take such immediate corrective action as may be required by this Division, including the construction of additional wastewater treatment and disposal facilities. Pollutitm Preir„tion Pays Po Box 276x, Rako. Noah CAfOma 276ti•7667 TekOxm 919-733 -7015 1 Upon completion of construction and prior to operation of this permitted facility, a certification must be received from a professional engineer with the certifying that the permitted facility has been installed in accordance approved plans and specifications. If you have any questions or need additional information, please contact Ms. Babette McKemie, telephone number 919/733 -5083, ext. 546. Sincerely, R. Paul Wilms cc Mitchell County Health Department Asheville Regional Supervisor NMr. Dennis R. Ramsey Mr. John Campbell Engineer's Certification I , as a duly registered Professional Engineer in the State of North Carolina, hereby certify Yhat construction of these permitted facilities has been completed in accordance with the approved plans and specifications. Signature Registration Number Date NC0000175