Loading...
HomeMy WebLinkAbout20201177 Ver 1_Project Close-out_20230118Baker, Caroline D From: Kotheimer, Joshua L. <Joshua.Kotheimer@stvinc.com> Sent: Wednesday, January 18, 2023 1:16 PM To: Roden Reynolds, Bryan K CIV (US); Pitner, Andrew Cc: jlemery@performancecsd.com; Brandon Whallon; Iagnocco, Michael Subject: [External] Unity Classical Charter School; SAW-2020-01307, DWR# 20-1177; Project Close-out Attachments: DWR_20-1177 Unity Charter_ CloseoutForm.pdf, SAW-2020-01307_Unity_Closeout.pdf, SAW-2020-01307_Unity Charter Monitoring Report.pdf CAUTION: External email. Do not click links or open attachments unless you verify. Send all suspicious email as an attachment to Report Spam. Hey Bryan/Andrew — Hope you are doing well! Attached are the executed close-out forms in the above -referenced matter; STV was retained to conduct periodic inspections of the site during construction to maintain compliance with the 404 authorization and 401 certification - we have executed the attached forms on behalf of Performance Charter LLC. Let me know if anything else is needed at this time. Thanks, Joshua Kotheimer Environmental Science Manager 0oshua.kotheimer@stvinc.com (704) 816-2519 office (704) 574-9416 cell STV, too J STV Incorporated 900 West Trade Street, Suite 715 Charlotte, NC 28202-1144 Please consider the environment before printing this e-mail. Redesigned and rebuilt: visit our new website at www.stvinc.com The information contained in this electronic message is intended only for the use of the individual or entity to which it is addressed and may contain information that is privileged, confidential and exempt from disclosure under applicable law. If the reader of this message is not the intended recipient, you are informed that any dissemination, copying or disclosure of the material contained herein, in whole or in part, is strictly prohibited. If you have received this transmission in error, please notify STV and purge this message. NCDWR Project No.: 20-1177 CERTIFICATE OF COMPLETION County: Mecklenburg Applicant: Brandon Whallon - Performance Charter School Development LLC Project Name: Unity Classical Charter School Date of Issuance of 401 Water Quality Certification: November 3, 2020 Certificate of Completion Upon completion of all work approved within the 401 Water Quality Certification or applicable Buffer Rules, and any subsequent modifications, the applicant is required to return this certificate to the 401 Wetland & Buffer Permitting Unit, North Carolina Division of Water Resources, 1617 Mail Service Center, Raleigh, NC, 27699-1617. This form may be returned to NCDWR by the applicant, the applicant's authorized agent, or the project engineer. It is not necessary to send certificates from all of these. Applicant's Certification I, , hereby state that, to the best of my abilities, due care and diligence was used in the observation of the construction such that the construction was observed to be built within substantial compliance and intent of the 401 Water Quality Certification and Buffer Rules, the approved plans and specifications, and other supporting materials. Signature: Date: Agent's Certification Joshua Kotheimer , hereby state that, to the best of my abilities, due care and diligence was used in the observation of the construction such that the construction was observed to be built within substantial compliance and intent of the 401 Water Quality Certification and Buffer Rules, the approved plans and specifications, and other supporting materials A‘ Signature: Date: Engineer's Certification Partial Final 01/17/2023 I, , as a duly registered Professional Engineer in the State of North Carolina, having been authorized to observe (periodically, weekly, full time) the construction of the project for the Permittee hereby state that, to the best of my abilities, due care and diligence was used in the observation of the construction such that the construction was observed to be built within substantial compliance and intent of the 401 Water Quality Certification and Buffer Rules, the approved plans and specifications, and other supporting materials. Signature Registration No. Date Action ID Number: SAW-2020-01307 County: Mecklenburg Permittee: Performance Charter School Development, LLC, Brandon Whallon Project Name: Unity Classical Academy Date Verification Issued: 10/13/2020 Project Manager: Bryan Roden -Reynolds Upon completion of the activity authorized by this permit and any mitigation required by the permit, sign this certification and return it to the following address: US ARMY CORPS OF ENGINEERS WILMINGTON DISTRICT Attn: Bryan Roden -Reynolds Charlotte Regulatory Office U.S Army Corps of Engineers 8430 University Executive Park Drive, Suite 615 Charlotte, North Carolina 28262 or bryan.roden-reynolds@usace.army.mil Please note that your permitted activity is subject to a compliance inspection by a U. S. Army Corps of Engineers representative. Failure to comply with any terms or conditions of this authorization may result in the Corps suspending, modifying or revoking the authorization and/or issuing a Class I administrative penalty, or initiating other appropriate legal action. I hereby certify that the work authorized by the above referenced permit has been completed in accordance with the terms and condition of the said permit, and required mitigation was completed in accordance with the permit conditions. Authorized Agent) 01/17/2023 Signature of Permittee Date STV Engineers Inc. 900 West Trade Street, Suite 715 Charlotte, NC 28202 Photographic Monitoring Report Date: 1/11/2023 Inspector Joshua Kotheimer Report No. 1 Project Unity Charter School (SAW-2020-01307) Day of the Week: Wednesday Time of Site Visit: 8:00am - 9:00am Weather Overcast Description of work This report is to document the completed construction of the stream relocation. The channel has has been relocated and the cross vanes have been installed. Trees and bushes have been planted as per the planting plan. The riparian area has been stabilized with coir fiber and the riparian seed mix specified in the project materials was recently applied but has not yet emerged. Stream Issues/Corrections: Photographic monitoring reports which will include functional assessments will be prepared and submitted no later than December 31 st for the next three years as per the permit conditions. Compliance Report Photopages Photograph 1 - This photograph is facing downstream just above the first structure. Photograph 2 - This photograph is looking upstream from just below the second structure. Compliance Report Photopages Photograph 3 - This photograph is located below the third structure facing upstream. Photograph 4 - This photograph is located below the fourth structure facing upstream.