HomeMy WebLinkAbout20201177 Ver 1_Project Close-out_20230118Baker, Caroline D
From: Kotheimer, Joshua L. <Joshua.Kotheimer@stvinc.com>
Sent: Wednesday, January 18, 2023 1:16 PM
To: Roden Reynolds, Bryan K CIV (US); Pitner, Andrew
Cc: jlemery@performancecsd.com; Brandon Whallon; Iagnocco, Michael
Subject: [External] Unity Classical Charter School; SAW-2020-01307, DWR# 20-1177; Project
Close-out
Attachments: DWR_20-1177 Unity Charter_ CloseoutForm.pdf, SAW-2020-01307_Unity_Closeout.pdf,
SAW-2020-01307_Unity Charter Monitoring Report.pdf
CAUTION: External email. Do not click links or open attachments unless you verify. Send all suspicious email as an attachment to
Report Spam.
Hey Bryan/Andrew — Hope you are doing well! Attached are the executed close-out forms in the above -referenced
matter; STV was retained to conduct periodic inspections of the site during construction to maintain compliance with
the 404 authorization and 401 certification - we have executed the attached forms on behalf of Performance Charter
LLC. Let me know if anything else is needed at this time.
Thanks,
Joshua Kotheimer
Environmental Science Manager
0oshua.kotheimer@stvinc.com
(704) 816-2519 office
(704) 574-9416 cell
STV,
too
J
STV Incorporated
900 West Trade Street, Suite 715
Charlotte, NC 28202-1144
Please consider the environment before printing this e-mail.
Redesigned and rebuilt: visit our new website at www.stvinc.com
The information contained in this electronic message is intended only for the use of the individual or entity to which it is
addressed and may contain information that is privileged, confidential and exempt from disclosure under applicable law.
If the reader of this message is not the intended recipient, you are informed that any dissemination, copying or
disclosure of the material contained herein, in whole or in part, is strictly prohibited. If you have received this
transmission in error, please notify STV and purge this message.
NCDWR Project No.: 20-1177
CERTIFICATE OF COMPLETION
County: Mecklenburg
Applicant: Brandon Whallon - Performance Charter School Development LLC
Project Name: Unity Classical Charter School
Date of Issuance of 401 Water Quality Certification: November 3, 2020
Certificate of Completion
Upon completion of all work approved within the 401 Water Quality Certification or applicable Buffer Rules, and any
subsequent modifications, the applicant is required to return this certificate to the 401 Wetland & Buffer Permitting
Unit, North Carolina Division of Water Resources, 1617 Mail Service Center, Raleigh, NC, 27699-1617. This form may be
returned to NCDWR by the applicant, the applicant's authorized agent, or the project engineer. It is not necessary to
send certificates from all of these.
Applicant's Certification
I, , hereby state that, to the best of my abilities, due care and diligence was
used in the observation of the construction such that the construction was observed to be built within substantial
compliance and intent of the 401 Water Quality Certification and Buffer Rules, the approved plans and specifications,
and other supporting materials.
Signature: Date:
Agent's Certification
Joshua Kotheimer , hereby state that, to the best of my abilities, due care and diligence was
used in the observation of the construction such that the construction was observed to be built within substantial
compliance and intent of the 401 Water Quality Certification and Buffer Rules, the approved plans and specifications,
and other supporting materials
A‘
Signature: Date:
Engineer's Certification
Partial Final
01/17/2023
I, , as a duly registered Professional Engineer in the State of North
Carolina, having been authorized to observe (periodically, weekly, full time) the construction of the project for the
Permittee hereby state that, to the best of my abilities, due care and diligence was used in the observation of the
construction such that the construction was observed to be built within substantial compliance and intent of the 401
Water Quality Certification and Buffer Rules, the approved plans and specifications, and other supporting materials.
Signature Registration No. Date
Action ID Number: SAW-2020-01307 County: Mecklenburg
Permittee: Performance Charter School Development, LLC, Brandon Whallon
Project Name: Unity Classical Academy
Date Verification Issued: 10/13/2020
Project Manager: Bryan Roden -Reynolds
Upon completion of the activity authorized by this permit and any mitigation required by the permit,
sign this certification and return it to the following address:
US ARMY CORPS OF ENGINEERS
WILMINGTON DISTRICT
Attn: Bryan Roden -Reynolds
Charlotte Regulatory Office
U.S Army Corps of Engineers
8430 University Executive Park Drive, Suite 615
Charlotte, North Carolina 28262
or
bryan.roden-reynolds@usace.army.mil
Please note that your permitted activity is subject to a compliance inspection by a U. S. Army Corps of
Engineers representative. Failure to comply with any terms or conditions of this authorization may
result in the Corps suspending, modifying or revoking the authorization and/or issuing a Class I
administrative penalty, or initiating other appropriate legal action.
I hereby certify that the work authorized by the above referenced permit has been completed in
accordance with the terms and condition of the said permit, and required mitigation was completed in
accordance with the permit conditions.
Authorized Agent)
01/17/2023
Signature of Permittee Date
STV Engineers Inc.
900 West Trade Street, Suite 715
Charlotte, NC 28202
Photographic Monitoring Report
Date:
1/11/2023
Inspector
Joshua Kotheimer
Report No.
1
Project
Unity Charter School (SAW-2020-01307)
Day of the Week:
Wednesday
Time of Site Visit:
8:00am - 9:00am
Weather
Overcast
Description of work
This report is to document the completed construction of the stream relocation. The channel has has been relocated and the cross vanes have been installed. Trees and bushes have
been planted as per the planting plan. The riparian area has been stabilized with coir fiber and the riparian seed mix specified in the project materials was recently applied but has not
yet emerged.
Stream Issues/Corrections:
Photographic monitoring reports which will include functional assessments will be prepared and submitted no later than December 31 st for the next three years as per the permit
conditions.
Compliance Report Photopages
Photograph 1 - This photograph is facing downstream just above the first structure.
Photograph 2 - This photograph is looking upstream from just below the second structure.
Compliance Report Photopages
Photograph 3 - This photograph is located below the third structure facing upstream.
Photograph 4 - This photograph is located below the fourth structure facing upstream.