HomeMy WebLinkAbout20221726 Ver 1_UpdatedPlans_20230117ROY COOPER
Governor
ELIZABETH S. BISER
Secretary
BRAXTON DAVIS
Director
December 8, 2022
MEMORANDUM:
�nEQ
NORTH CAROLINA
Environmental Quality
FROM: Gregg Bodnar, Major Permits Coordinator
NCDEQ - Division of Coastal Management
400 Commerce Ave., Morehead City, NC 28557
Fax: 252-247-3330 (Courier 04-16-33)
are gg.bodnaroncdenr.gov
SUBJECT: CAMA Fill Review
Applicant: Dare County ABC Board
Project Location: 47290 NC 12 HWY; Buxton in Dare County
Proposed Project: Construct a new ABC store with associated infrastructure, 404 wetland fill
and stormwater retention areas.
Please indicate below your agency's position or viewpoint on the proposed project and
return this form to Gregg Bodnar at the address above by December 7, 2022. If you have any
questions regarding the proposed project, contact Yvonne Carver (252-264-3901, ext. 237) when
appropriate, in-depth comments with supporting data is requested.
REPLY: This agency has no objection to the project as proposed.
**Additional comments may be attached**
This agency has no comment on the proposed project.
This agency approves of the project only if the recommended changes
are incorporated. See attached.
This agency objects to the project for reasons described in the attached
comments.
PRINT NAME
AGENCY
SIGNATURE
DATE
E Q�� North Carolina Department of Environmental Quality I Division of Coastal Management Elizabeth City Office 1 401 South Griffin Street, Suite 300 1 Elizabeth City, North Carolina 27909
NORTH GAROLINA -
uepaa ntofe Wmnm ntalo�u� /� 252.264.3901
ROY COOPER
Governor
ELIZABETH S. BISER
Secretary
BRAXTON DAVIS
Director
December 8, 2022
MEMORANDUM:
NORTH .CAROLINA
Environmental Quality
FROM: Gregg Bodnar, Major Permits Coordinator
NCDEQ - Division of Coastal Management
400 Commerce Ave., Morehead City, NC 28557
Fax: 252-247-3330 (Courier 04-16-33)
gre14g.badnar@ncdenr.gQV
SUBJECT: CAMA Fill Review i RAHD
Applicant: Dare County ABC Board
Project Location: 47290 NC 12 HWY; Buxton in Dare County
Proposed Project: Construct a new ABC store with associated infrastructure, 404 wetland fill
and stormwater retention areas.
Please indicate below your agency's position or viewpoint on the proposed project and
return this form to Qre_g Bodnar at the address above by December 7, 2022. If you have any
questions regarding the proposed project, contact Yvonne Carver (252-264-3901, ext. 237) when
appropriate, in-depth comments with supporting data is requested.
REPLY: This agency has no objection to the project as proposed.
**Additional comments may be attached**
This agency has no comment on the proposed project.
This agency approves of the project only if the recommended changes
are incorporated. See attached.
This agency objects to the project for reasons described in the attached
comments.
PRINTNAME 10049 14 6 I LLA M, —
AGENCY
�A'e� GClt1 R! (7
SIGNATURE
SOF-i- !,�A<44-�D
North Carolina Department of Environmental Quality I Dlylslon of Coastal Management.
D E Elizabeth City office 1401 South Griffin Street, 5ulte 300 1 Elizabeth city, North Carolina 27909
NORTH CAROUua- .
otnssx�ieNumro�me�rr�a+u �� 252.264,3901
County of ®are
P.O. Box 1000 1 Manteo, North Carolina 27954 1 252,475.5000
December 8, 2022
Gregg Bodnar
Major Permits Coordinator
400 Commerce Ave
Morehead City, IVC 28557
DEC 9
Dare County does not have any objections to the major permit request for the Dare
County ABC Board building being proposed at 47290 NC 1.2 HWY in Buxton, NC.
However on the site plan prepared by Atlantic Environmental Consultants LLC and in
the narrative provided by Yvonne Carver on your staff reference the Dare County the
Dare County Regulatory Flood Protection Elevation (RFPE) for the proposed project at
8 feet. The site plan and narrative need to be corrected to show a RFPE elevation of 9ft
for the first floor of the building. The Dare County Flood.Protection Ordinance requires
in the AE flood zone, that the RFPE is the base flood elevation as designated on the
effective FIRM plus 3 feet of freeboard or an elevation to or above 8 feet NAVD 1988,
whichever elevation is greater. The proposed project is located in an area with a BFE
elevation of 6 feet (AE6), so with a three foot freeboard requirement the first floor would
need to be at an elevation of 9 feet to be complaint with our flood ordinance. The
applicant needs to have the site plan corrected to show the appropriate RFPE elevation.
Sincerely,
Noah H Gill m
Planning Director
Land of Beginnings
i�
i•iii
.a,
psi
I
!•••!�•••
Il.a�••�1••I�. � e
--
o
--------------------------------
? o r m N
Fs@ego oo �- Ao o�r7. � \\
�m m � A� m \
o..
o�
� o \
_ _ o
z
g
NZ
m^
yZ .-
- xA - oa -5 s \\
C) p m �. o o ZZ \
N�
z
n A II \ 1.
�UI /
T N o
om
z oa n u z
m 'F� /
'11 A n O z �C tim A
� o o Nm A nN y zza_ n
/
/
/
® a '"
MF _ -
TI /
rx
C,4 g _ m / \
��
OAREABC
DARE COUNTY ABC BOARD
�^g
BUXTON ABC STORE SITE PLAN
CAMA MAJOR PERMIT APPLICATION
°�
,oi3,izz
BUXTON DARE COUNTY NORTHCAROLINA
,4TLANl/C ENl1/RONMENlAL CONSULL4NlS, LLC
PO BOX 2266 KITTY HAWK NORTH CAROLINA
Ph —/Fax: <252) 261-7707
E-Muir d—gd—@gn R.—