Loading...
HomeMy WebLinkAbout20150167 Ver 1_401 Application Signed_20150219�'' F w AT459 g 01;;ii�, Office Use Only: Corps action ID no. DWQ project no. Form Version 1.4 January 2009 Page 1 of 10 PCN Form —Version 1.4 January 2009 Pre - Construction Notification (PCN) Form A. Applicant Information 1. Processing 1a. Type(s) of approval sought from the Corps: ❑ Section 404 Permit ❑ Section 10 Permit 1b. Specify Nationwide Permit (NWP) number: or General Permit (GP) number: 1c. Has the NWP or GP number been verified by the Corps? ❑ Yes ❑ No 1d. Type(s) of approval sought from the DWQ (check all that apply): ❑ 401 Water Quality Certification — Regular ❑ Non -404 Jurisdictional General Permit ❑ 401 Water Quality Certification — Express ❑X Riparian Buffer Authorization 1e. Is this notification solely for the record because written approval is not required? For the record only for DWQ 401 Certification: ❑ Yes ❑ No For the record only for Corps Permit: ❑ Yes ❑X No 1f. Is payment into a mitigation bank or in -lieu fee program proposed for mitigation of impacts? If so, attach the acceptance letter from mitigation bank or in -lieu fee program. ❑ Yes ❑x No 1g. Is the project located in any of NC's twenty coastal counties. If yes, answer 1h below. ❑Yes ❑X No 1h. Is the project located within a NC DCM Area of Environmental Concern (AEC)? ❑ Yes ❑X No 2. Project Information 2a. Name of project: Village at Beaver Dam Greenway Trail 2b. County: Wake 2c. Nearest municipality / town: Knightdale 2d. Subdivision name: Village at Beaver Dam 2e. NCDOT only, T.I.P. or state project no: 3. Owner Information 3a. Name(s) on Recorded Deed: Beazer Homes Corporation 3b. Deed Book and Page No. DB 014296 PG 02159 3c. Responsible Party (for LLC if applicable): 3d. Street address: 4509 Creedmoor Rd., Suite 200 3e. City, state, zip: Raleigh, NC 27612 -3813 3f. Telephone no.: 919 -868 -7463 3g. Fax no.: 3h. Email address: chris.simmering @beazer.com Page 1 of 10 PCN Form —Version 1.4 January 2009 4. Applicant Information (if different from owner) 4a. Applicant is: ❑ Agent ❑X Other, specify: Director of Land Development 4b. Name: Chris Simmering 4c. Business name (if applicable): Beazer Homes Corporation 4d. Street address: 4509 Creedmoor Road, Suite 200 4e. City, state, zip: Raleigh, NC 27612 4f. Telephone no.: 919- 868 -7463 4g. Fax no.: 4h. Email address: 5. Agent/Consultant Information (if applicable) 5a. Name: Kirby R. Bell, Jr., PE 5b. Business name (if applicable): Bass, Nixon & Kennedy, Inc 5c. Street address: 6310 Chapel Hill Rd., Suite 250 5d. City, state, zip: Raleigh, NC 27607 5e. Telephone no.: 919 - 851 -4422 5f. Fax no.: 919- 851 -8968 5g. Email address: robbie.bell @bnkinc.com Page 2 of 10 B. Project Information and Prior Project History 1. Property Identification 1a. Property identification no. (tax PIN or parcel ID): 1755 -32 -0540 1b. Site coordinates (in decimal degrees): I Latitude: 35.8153 Longitude: - 78.4848 1c. Property size: 22.33 acres 2. Surface Waters 2a. Name of nearest body of water to proposed project: Beaver Dam Creek 2b. Water Quality Classification of nearest receiving water: c; NSW 1 mile west of site 2c. River basin: Neuse 3. Project Description 3a. Describe the existing conditions on the site and the general land use in the vicinity of the project at the time of this application: Undeveloped; but part of a future Phase IV Single Family Residential Subdivision that was approved years ago and grandfathered from stormwater policies per meeting with DWQ several years ago (however spreaders still required) 3b. List the total estimated acreage of all existing wetlands on the property: 3c. List the total estimated linear feet of all existing streams (intermittent and perennial) on the property: 3d. Explain the purpose of the proposed project: Town of Knightdale aerial greenway boardwalk through buffer 3e. Describe the overall project in detail, including the type of equipment to be used: Proposed request is for a required Town of Knightdale greenway trail. 4. Jurisdictional Determinations 4a. Have jurisdictional wetland or stream determinations by the Corps or State been requested or obtained for this property / project (including all prior phases) in the past? ❑X Yes ❑ No ❑ Unknown Comments: 4b. If the Corps made the jurisdictional determination, what type of determination was made? El Preliminary ❑X Final 4c. If yes, who delineated the jurisdictional areas? Name (if known): Agency /Consultant Company: Other: Spangler Environmental, Inc. 4d. If yes, list the dates of the Corps jurisdictional determinations or State determinations and attach documentation. BNK does not have this information, just wetland and buffer files from Spangler. I have attached 401/404 Permits that were issued for this project several years ago. 5. Project History 5a. Have permits or certifications been requested or obtained for this project (including all prior phases) in the past? ❑ Yes El No El Unknown 5b. See If yes, explain in detail according to "help file" instructions. attached 401/404's 6. Future Project Plans 6a. Is this a phased project? ❑X Yes ❑ No 6b. The If yes, explain. proposed greenway trail is located within the last phase of the project; Phase IV Village at Beaver Dam Page 3 of 10 PCN Form — Version 1.4 January 2009 C. Proposed Impacts Inventory 1. Impacts Summary 1a. Which sections were completed below for your project (check all that apply): ❑ Wetlands ❑ Streams — tributaries ❑X Buffers ❑ Open Waters ❑ Pond Construction 2. Wetland Impacts If there are wetland impacts proposed on the site, then complete this question for each wetland area impacted. 2a. Wetland impact number Permanent (P) or Tempo T 2b. Type of impact 2c. Type of wetland 2d. Forested 2e. Type of jurisdiction Corps (404,10) or DWQ (401, other) 2f. Area of impact (acres) W1 - Choose one Choose one Yes/No - W2 - Choose one Choose one Yes /No - W3 - Choose one Choose one Yes /No - W4 - Choose one Choose one Yes/No - W5 - Choose one Choose one Yes /No - W6 - Choose one Choose one Yes /NO - 2g. Total Wetland Impacts: 2h. Comments: 3. Stream Impacts If there are perennial or intermittent stream impacts (including temporary impacts) proposed on the site, then complete this question for all stream sites impacted. 3a. Stream impact number Permanent (P) or Temporary (T) 3b. Type of impact 3c. Stream name 3d. Perennial (PER) or intermittent (I NT)? 3e. Type of jurisdiction 3f. Average stream width (feet) 3g. Impact length (linear feet) S1 - Choose one - - S2 - Choose one - - S3 - Choose one S4 - Choose one - - S5 - Choose one S6 - Choose one 3h. Total stream and tributary impacts 3i. Comments: Page 4 of 10 PCN Form — Version 1.4 January 2009 4. Open Water Impacts If there are proposed impacts to lakes, ponds, estuaries, tributaries, sounds, the Atlantic Ocean, or any other open water of the U.S. then indiv ually list all open water impacts below. 4a. Open water impact number Permanent(P)or Tempo T 4b. Name of waterbody (if applicable) 4c. Type of impact 4d. Waterbody type 4e. Area of impact (acres) 01 - Choose one Choose 02 - Choose one Choose 03 - Choose one Choose 04 - Choose one Choose 4f. Total open water impacts 4g. Comments: 5. Pond or Lake Construction If and or lake construction proposed, the complete the chart below. 5a. Pond ID number 5b. Proposed use or purpose of pond 5c. Wetland Impacts (acres) 5d. Stream Impacts (feet) 5e. Upland (acres) Flooded I Filled Excavated Flooded Filled Excavated P1 Choose one P2 Choose one 5f. Total: 5g. Comments: 5h. Is a dam high hazard permit required? ❑ Yes ❑ No If yes, permit ID no: 51. Expected pond surface area (acres): 5j. Size of pond watershed (acres): 5k. Method of construction: 6. Buffer Impacts (for DWQ) If project will impact a protected riparian buffer, then complete the chart below. If yes, then individually list all buffer impacts below. If any impacts require mitigation, then you MUST TII out Section D of this form. 6a. Project is in which protected basin? ❑X Neuse ❑ Tar - Pamlico ❑ Catawba ❑ Randleman ❑ Other: 6b. Buffer Impact number- Permanent P or Tem ora T 6c. Reason for impact 6d. Stream name 6e. Buffer mitigation required? 6f. Zone 1 impact (square feet ) 6g. Zone 2 impact (square feet 131 - Greenway Boardwalk Unnamed tributary No 780 400 B2 - Yes /No B3 - Yes /No B4 - Yes /No B5 - Yes/No B6 - Yes/No 6h. Total Buffer Impacts: 61. Comments: Pilings are 6" x 6" = 0.25 SF; pilings are 8 foot oc Page 5 of 10 D. Impact Justification and Mitigation 1. Avoidance and Minimization 1a. Specifically describe measures taken to avoid or minimize the proposed impacts in designing project. Before design started trees were located within the area proposed by the boardwalk. The boardwalk design was configured to avoid existing trees. 1b. On No Specifically describe measures taken to avoid or minimize the proposed impacts through construction techniques. Sheet C4.3 note no. 3 states that no mechanized machinery is allowed within riparian buffer. Small brush to be removed by hand. ground disturbance allowed except for portable hand held anger to set piles. 2. Compensatory Mitigation for Impacts to Waters of the U.S. or Waters of the State 2a. Does the project require Compensatory Mitigation for impacts to Waters of the U.S. or Waters of the State? ❑ Yes ❑ No 2b. If yes, mitigation is required by (check all that apply): ❑ DWQ ❑ Corps 2c. If yes, which mitigation option will be used for this project. ❑ Mitigation bank El Payment to in -lieu fee program ❑ Permittee Responsible Mitigation 3. Complete if Using a Mitigation Bank 3a. Name of Mitigation Bank: 3b. Credits Purchased (attach receipt and letter) Type: Choose one Type: Choose one Type: Choose one Quantity: Quantity: Quantity: 3c. Comments: 4. Complete if Making a Payment to In -lieu Fee Program 4a. Approval letter from in -lieu fee program is attached. ❑ Yes 4b. Stream mitigation requested: linear feet 4c. If using stream mitigation, stream temperature: Choose one 4d. Buffer mitigation requested (DWQ only): square feet 4e. Riparian wetland mitigation requested: acres 4f. Non - riparian wetland mitigation requested: acres 4g. Coastal (tidal) wetland mitigation requested: acres 4h. Comments: 5. Complete if Using a Permittee Responsible Mitigation Plan 5a. If using a permittee responsible mitigation plan, provide a description of the proposed mitigation plan. Page 6 of 10 PCN Form — Version 1.4 January 2009 6. Buffer Mitigation (State Regulated Riparian Buffer Rules) — required by DWQ 6a. Will the project result in an impact within a protected riparian buffer that requires Yes buffer mitigation? ❑ ❑X No (maybe) 6b. If yes, then identify the square feet of impact to each zone of the riparian buffer that requires mitigation. Calculate the amount of mitigation required. 6c. 6d. 6e. Zone Reason for impact Total impact Multiplier Required mitigation (square feet) (square feet) Zone 1 3 (2 for Catawba) Zone 2 1.5 6f. Total buffer mitigation required: 6g. If buffer mitigation is required, discuss what type of mitigation is proposed (e.g., payment to private mitigation bank, permittee responsible riparian buffer restoration, payment into an approved in -lieu fee fund). Payment to private mitigation bank. 6h. Comments: Page 7 of 10 E. Stormwater Management and Diffuse Flow Plan (required by DWQ) 1. Diffuse Flow Plan 1a. Does the project include or is it adjacent to protected riparian buffers identified within one of the NC Riparian Buffer Protection Rules? ❑x Yes ❑ No 1b. If yes, then is a diffuse flow plan included? If no, explain why. No runoff expected ❑ Yes ❑x No 2. Stormwater Management Plan 2a. What is the overall percent imperviousness of this project? ova 2b. Does this project require a Stormwater Management Plan? ❑ Yes ❑ No 2c. If this project DOES NOT require a Stormwater Management Plan, explain why: 2d. If this project DOES require a Stormwater Management Plan, then provide a brief, narrative description of the plan: 2e. Who will be responsible for the review of the Stormwater Management Plan? 3. Certified Local Government Stormwater Review 3a. In which local government's jurisdiction is this project? 3b. Which of the following locally - implemented stormwater management programs apply (check all that apply): ❑ Phase II ❑ NSW ❑ USMP ❑ Water Supply Watershed ❑ Other: 3c. Has the approved Stormwater Management Plan with proof of approval been attached? ❑Yes ❑ No 4. DWQ Stormwater Program Review 4a. Which of the following state - implemented stormwater management programs apply (check all that apply): ❑Coastal counties ❑HQW ❑ORW []Session Law 2006 -246 ❑Other: 4b. Has the approved Stormwater Management Plan with proof of approval been attached? ❑ Yes ❑ No 5. DWQ 401 Unit Stormwater Review 5a. Does the Stormwater Management Plan meet the appropriate requirements? ❑ Yes ❑ No 5b. Have all of the 401 Unit submittal requirements been met? ❑ Yes ❑ No Page 8 of 10 PCN Form — Version 1.4 January 2009 F. Supplementary Information 1. Environmental Documentation (DWQ Requirement) la. Does the project involve an expenditure of public (federal /state /local) funds or the ❑ Yes ❑ No use of public (federal /state) land? 1b. If you answered "yes" to the above, does the project require preparation of an environmental document pursuant to the requirements of the National or State ❑Yes ❑ No (North Carolina) Environmental Policy Act (NEPA/SEPA)? 1c. If you answered "yes" to the above, has the document review been finalized by the State Clearing House? (If so, attach a copy of the NEPA or SEPA final approval letter.) ❑ Yes ❑X No Comments: 2. Violations (DWQ Requirement) 2a. Is the site in violation of DWQ Wetland Rules (15A NCAC 2H .0500), Isolated Wetland Rules (15A NCAC 2H .1300), DWQ Surface Water or Wetland Standards, El Yes ❑X No or Riparian Buffer Rules (15A NCAC 2B.0200)? 2b. Is this an after - the -fact permit application? ❑Yes ❑ No 2c. If you answered yes" to one or both of the above questions, provide an explanation of the violation(s): 3. Cumulative Impacts (DWQ Requirement) 3a. Will this project (based on past and reasonably anticipated future impacts) result in ❑Yes ❑X No additional development, which could impact nearby downstream water quality? 3b. If you answered "yes" to the above, submit a qualitative or quantitative cumulative impact analysis in accordance with the most recent DWQ policy. If you answered "no," provide a short narrative description. 4. Sewage Disposal (DWQ Requirement) 4a. Clearly detail the ultimate treatment methods and disposition (non - discharge or discharge) of wastewater generated from the proposed project, or available capacity of the subject facility. Page 9 of 10 PCN Form — Version 1.4 January 2009 S. Endangered Species and Designated Critical Habitat (Corps Requirement) 5a. Will this project occur in or near an area with federally protected species or habitat? ❑ Yes ❑ No 5b. Have you checked with the USFWS concerning Endangered Species Act impacts? ❑ Yes ❑ No 5c. If yes, indicate the USFWS Field Office you have contacted. 5d. What data sources did you use to determine whether your site would impact Endangered Species or Designated Critical Habitat? 6. Essential Fish Habitat (Corps Requirement) 6a. Will this project occur in or near an area designated as essential fish habitat? ❑ Yes ❑ No 6b. What data sources did you use to determine whether your site would impact Essential Fish Habitat? 7. Historic or Prehistoric Cultural Resources (Corps Requirement) 7a. Will this project occur in or near an area that the state, federal or tribal governments have designated as having historic or cultural preservation status (e.g., National Historic Trust designation or properties significant in North Carolina history and archaeology)? Yes E] No 7b. What data sources did you use to determine whether your site would impact historic or archeological resources? 8. Flood Zone Designation (Corps Requirement) 8a. Will this project occur in a FEMA- designated 100 -year floodplain? ❑ Yes ❑ No 8b. If yes, explain how project meets FEMA requirements: 8c. What source(s) did you use to make the floodplain determination? Kirby R. Bell, Jr. PE Applicant/Agent's Printed Name AApcant/Agents 2/3/2015 Date Signature (Agent's signature is valid only if an authorization letter from the applicant is provided.) Page 10 of 10