Loading...
HomeMy WebLinkAbout#5055 - 8 - 2011 - FINALINSPECTION REPORT ROUTING SHEET To be attached to all inspection reports in-house only. Laboratory Cert. #: Laboratory Name: Inspection Type: Inspector Name(s): J Inspection Date: Date Report Completed: Date Forwarded to Reviewer: Reviewed bv: Date Review Completed: Cover Letter to use: _ Insp. Initial Unit Supervisor: Date Received: Date Forwarded to Linda: Date Mailed: 5055 Asheville Steam Electric Plant Field Maintenance ason Smith August 2, 2011 September 21, 2011 September 29, 2011 Tonja Springer October 5, 2011 _ Insp. Reg. _ Insp. No Finding _ Insp. CP X Corrected Gary Francies 10/5/2011 10/10/2011 ILIVAA o®® NCDENR North Carolina Department of Environment and Natural Resources Division of Water Quality Beverly Eaves Perdue Coleen H. Sullins Governor Director October 10, 2011 5055 Ms. Crystal Diedrich Asheville Steam Electric Plant 200 CP&L Drive Arden, NC 28704 SUBJECT: North Carolina Wastewater/Groundwater Laboratory Certification (NC WW/GW LC) Maintenance Inspection Dear Ms. Diedrich: Enclosed is a report for the inspection performed on August 2, 2011 by Jason Smith. Since the finding(s) cited during the inspection were all corrected prior to the completion of the enclosed report, a response is not required. The staff is commended for taking the initiative in correcting the findings in such a timely manner. For certification maintenance, your laboratory must continue to carry out the requirements set forth in 15A NCAC 2H .0800. Copies of the checklists completed during the inspection may be requested from this office. Thank you for your cooperation during the inspection. If you wish to obtain an electronic copy of this report by email, or if you have questions or need additional information please contact me at 828-296-4677. Sincerely, Gary Francies Unit Supervisor Laboratory Section CC: Master File Jason Smith Gary Francies DENR DWQ Laboratory Section NC Wastewater/Groundwater Laboratory Certification Branch One 1623 Mail Service Center, Raleigh, North Carolina 27699-1623 NofthCarohna Location: 4405 Reedy Creek Road. Raleigh, North Carolina 27607-6445 Phone: 919-733-3908 \ FAX: 919-733-6241 Internet: www.dwglab.org An Equal Opportunity\ Affirmative Action Employer Customer Service:1-877-623-6748 www.ncwaterquality.org LABORATORY NAME: NPDES PERMIT #: ADDRESS: CERTIFICATE #: DATE OF INSPECTION: TYPE OF INSPECTION: AUDITOR(S): LOCAL PERSON(S) CONTACTED: INTRODUCTION: Asheville Steam Electric Plant NC0000396 200 CP&L Drive Arden, NC 28704 5055 August 2, 2011 Field Maintenance Jason Smith Crystal Diedrich, Kelly Riedesel, and Laurie Moorehead This laboratory was inspected to verify its compliance with the requirements of 15A NCAC 2H .0800 for the analysis of environmental samples. II. GENERAL COMMENTS: The laboratory was clean and well organized. The facility has all the equipment necessary to perform the analyses. Proficiency testing samples have been analyzed for all certified parameters for the 2011 proficiency testing calendar year and the graded results were 100% acceptable. Laboratory staff are commended for keeping up to date with most of the recent changes in certification policies. Proficiency Testing Comment: Proficiency testing (PT) samples were not analyzed and documented in the same manner as environmental samples. Multiple replicates were analyzed and the results were not documented on the normal daily benchsheet. The Quality Assurances for Field Laboratories states: The analysis of proficiency testing (PT) samples is designed to evaluate the entire process used to routinely report environmental analytical results. Therefore, PT samples must be analyzed and the process documented in the same manner as environmental samples. This requirement is a new policy that has been implemented by our program since the last inspection. Notification of acceptable corrective action (i.e., the laboratory stated that all future PT samples would be analyzed and documented in the same manner as environmental samples) was received by email on August 2, 2011. No further response is necessary for this finding. Total Residual Chlorine — Standard Methods, 18th Edition, 4500 Cl G Comment: The laboratory was using an incorrect reporting limit. The curve was verified down to 27,ug/L, however results were only reported down to 50 pg/L. The Technical Assistance for Field Analysis of Total Residual Chlorine states: The concentrations of the calibration standards must bracket the concentrations of the samples analyzed. One of the standards must have a concentration equal to or below the lower Page 2 #5055 Asheville Steam Electric Plant reporting concentration for Total Residual Chlorine. Notification of acceptable corrective action (i.e., the laboratory stated that all future results will be reported down to the lowest standard verified during the annual curve verification) was received by email on August 2, 2011. No further response is necessary for this finding. Proficlen2y Testing Total Residual Chlorine — Standard Methods, 18th Edition, 4500 CI G Recommendation: The laboratory orders and analyzes low level Total Residual Chlorine (i.e., pg/L) PT samples. The analysis is performed on the regular level curve (i.e., mg/L), which is the curve used for environmental samples. This causes the results of the sample to be reported to two decimals and in mg/L. Although this has not caused the laboratory to receive unacceptable results, it is a possible source of error. Since the facility has a permit limit of 0.1 mg/L, the analysis and reporting of low level PT samples is not required. It is recommended that the laboratory analyze regular level Total Residual Chlorine PT samples in future studies. IV. PAPER TRAIL INVESTIGATION: The paper trail consisted of comparing field testing records and . contract lab reports to Discharge Monitoring Reports (DMRs) submitted to the North Carolina Division of Water Quality. Data were reviewed for Outfalls 001, 002, and 005 for January 2011. No transcription errors were detected. The facility appears to be doing a good job of accurately transcribing data. V. CONCLUSIONS: All findings noted during the inspection were adequately addressed prior to the completion of this report. The inspector would like to thank the staff for its assistance during the inspection and data review process. No response is required. Report prepared by: Jason Smith Date: September 29, 2011 Report reviewed by: Tonja Springer Date: October 5, 2011