Loading...
HomeMy WebLinkAbout#5067 11-final INSPECTION REPORT ROUTING SHEET To be attached to all inspection reports in-house only. Laboratory Cert. #: #5067 Laboratory Name: Pilgrim’s Pride Field Lab Inspection Type: Field Maintenance Inspector Name(s): Jeffrey R. Adams Inspection Date: October 4, 2011 Date Report Completed: October 10, 2011 Date Forwarded to Reviewer: October 10, 2011 Reviewed by: Tonja Springer Date Review Completed: November 17, 2011 Cover Letter to use: Insp. Initial X Insp. Reg. Insp. No Finding Insp. CP __ Corrected Unit Supervisor: Dana Satterwhite Date Received: November 28, 2011 Date Forwarded to Linda November 28, 2011 Date Mailed: November 28, 2011 _____________________________________________________________________ On-Site Inspection Report LABORATORY NAME: Pilgrim’s Pride Field Lab NPDES PERMIT #: NC0072575 ADDRESS: P.O. Box 3668 Sanford, NC 27330 CERTIFICATE #: 5067 DATE OF INSPECTION: October 4, 2011 TYPE OF INSPECTION: Field Maintenance AUDITOR(S): Jeffrey R. Adams LOCAL PERSON(S) CONTACTED: Bruce Morgan I. INTRODUCTION: This laboratory was inspected to verify its compliance with the requirements of 15A NCAC 2H .0800 for the analysis of environmental samples. II. GENERAL COMMENTS: The laboratory was clean and well organized. Records were well organized and maintained, however, some quality control procedures need to be implemented. Proficiency testing samples have been analyzed for all certified parameters for the 2011 proficiency testing calendar year and the graded results were 100% acceptable. The laboratory was given a packet containing North Carolina Laboratory Certification quality control requirements and policies during the inspection. Finding A is a new policy that has been implemented since the last inspection. III. FINDINGS, REQUIREMENTS, COMMENTS AND RECOMMENDATIONS: Traceability A. Finding: The laboratory needs to increase the documentation of purchased materials and reagents, as well as, documentation of standards and reagents prepared in the laboratory. Requirement: All chemicals, reagents, standards and consumables used by the laboratory must have the following information documented: Date Received, Date Opened (in use), Vendor, Lot Number, and Expiration Date. A system (e.g., traceable identifiers) must be in place that links standard/reagent preparation information to analytical batches in which the solutions are used. Documentation of solution preparation must include the analyst’s initials, date of preparation, the volume or weight of standard(s) used, the solvent and final volume of the solution. This information as well as the vendor and/or manufacturer, lot number, and expiration date must be retained for chemicals, reagents, standards and consumables used for a period of five years. Consumable materials such as pH buffers and lots of pre-made Page 2 #5067 Pilgrim’s Pride Field Lab standards are included in this requirement. Ref: Quality Assurance Policies for Field Laboratories. Settleable Residue – Standard Methods, 18th Edition, 2540 F Comment: The laboratory is not documenting the 45 minute stir time. This is considered pertinent information. The North Carolina Administrative Code, 15A NCAC 2H .0805 (g) (1) and The Technical Assistance for Field Analysis of Settleable Solids document states: Data pertinent to each analysis must be maintained for five years. Document the 45 minute stir time. At the time of the inspection, laboratory personnel added a space on the benchsheet to enter the 45 minute stir time. No further response is necessary for this finding. IV. PAPER TRAIL INVESTIGATION: The paper trail consisted of comparing laboratory benchsheets and contract lab reports to Discharge Monitoring Reports (DMRs) submitted to the North Carolina Division of Water Quality. Data were reviewed for the following months: June, July and August, 2011. No transcription errors were detected. It appears the laboratory is doing a good job of accurately transcribing data. V. CONCLUSIONS: Correcting the above-cited finding will help this lab to produce quality data and meet certification requirements. The inspector would like to thank the staff for its assistance during the inspection and data review process. Please respond to all findings. Report prepared by: Jeffrey R. Adams Date: October 10, 2011 Report reviewed by: Tonja Springer Date: November 17, 2011