Loading...
HomeMy WebLinkAbout820110_NOV-2021-PC-0150 Enforcement Packet w photos_20210521NOTICE OF VIOLATION AND/OR NOTICE OF INTENT ROY COOPER Governor MICHAEL S. REGAN Secretary S. DANIEL SMITH Director NORTH CAROLINA Environmental Quality March 1, 2021 CERTIFIED MAIL RETURN RECEIPT REQUESTED 7020 0090 0001 7206 9436 Trent Tyler 3005 Wrye Branch Road Clinton NC 28382 Subject: NOTICE OF VIOLATION/NOTICE OF INTENT Administrative Code 15A NCAC 2T .1304 NOV-2021-PC-0150 Trent Tyler, Triple T. Farms Facility Number 82-110 Permit AWS820110 Sampson County t • Dear Mr. Tyler, On January 6, 2021, staff of the NC Department of Environmental Quality (DEQ) Division of Water Resources (DWR), Water Quality Regional Operations Section (WQROS) inspected the Triple T. Farm and the permitted waste disposal system. We wish to thank Mr. Tyler for his assistance during this inspection. As a result of this inspection, you are hereby notified that, having been permitted to have a non - discharge permit for the subject animal waste disposal system pursuant to 15A NCAC 2T .1304, you have been found to be in violation of your permit as follows: w m m5i raim wnemwm). r North Carolina Department of Environmental Quality 1 Division of Water Resources Fayetteville Regional Office 1 225 Green Street. Suite 7141 Fayetteville. North Carolina 29301 910.433.3300 Page 2 Mr. Trent Tyler March 1, 2021 Violation 1: Failure to maintain the maximum waste level in the lagoons/storage ponds that shall not exceed that specified in the facilities CAWMP. At a minimum, maximum waste levels for lagoons/storage ponds must not exceed the level that provides adequate storage to contain the 25-year, 24-hour storm event plus and additional one (1) foot of structural freeboard except that there shall be no violation of this condition if: a. there is a storm event more severe than a 25-year,24-hour event; b. the permittee is in compliance with its CAWMP and c. there is at least one (1) foot of structural freeboard. [15A NCAC 02T- .1304(b)] (Permit No. AWG100000 Section Conditions V2). On January 6, 2021, DWR staff received a phone call from Mr. Tyler. Mr. Tyler informed DWR staff that his lagoon was out of compliance and had been out of compliance for a few weeks. Mr. Tyler told DWR staff that his reason for not reporting was due to the fact that he thought he would be able to get the lagoon back into compliance quickly. DWR staff arrived to Triple T Farm around 1:00 PM and conducted a lagoon survey and determined that the lagoon marker was indicating 11 Inches. The survey results show the lagoon was actually reading about 9.60 inches. Required Corrective Action for Violation 1: Follow a 30-day plan of action provided to the DWR, and in the future maintain your waste level in accordance with your facility's CAWMP. Take all necessary additional legal steps to insure lagoon levels remain in compliance with Section (V2) of your permit. Violation 2: The permittee shall report by telephone to the appropriate Division Regional Office as soon as possible, not in no case more than twenty-four (24) hours following first knowledge of the occurrence of any of the following events: e. Failure to maintain storage capacity in a lagoon/storage pond greater than or equal to the required in Condition. V.2 of this General Permit (AWG No. 100000 Section 17e). Your permit specifically requires notification by telephone within 24 hours and a written report within 5 calendar days following first knowledge of the occurrence of a reportable condition. DWR has no record of receiving the 24- hour notification and the 5-day written report. Page 3 M. Trent Tyler March 1, 2021 Required Corrective action for Violation 2: In the event of a high freeboard situation, call the regional office within the twenty-four (24) hours of the first knowledge of the high freeboard. Prepare and submit within 48 hours a 30-day Plan of Action (POA) for lowering the lagoon/storage pond to an acceptable level as described in your CAWMP and General Permit. The Division of Water Resources requests that, in addition to the specified corrective action above, please submit the following items on or before (30 Days From Receipt): 1. An explanation from the OIC for this farm regarding how these violations occurred. 2. A list from the OIC concerning the steps that will be taken to prevent these violations from occurring in the future. You are required to take any necessary action to correct the above violations on or before January 15, 2021 and to provide a written response to this Notice 30 Days From Receipt. Please include in your response all corrective actions already taken and a schedule for completion of any corrective actions not addressed. Please note that assessment of civil penalties may have already been recommended for violations described within this Notice of Violation. Failure to comply with the State's rules, in the manner and time specified, may result in the assessment of additional civil penalties and/or the use of other enforcement mechanisms available to the State. Failure to comply with conditions in a permit may result in a recommendation of enforcement action, to the Director of the Division of Water Quality who may issue a civil penalty assessment of not more that twenty-five thousand ($25,000) dollars against any "person" who violates or fails to act in accordance with the terms, conditions, or requirements of a permit under authority of G.S. 143-215.6A. Page 4 Mr. Trent Tyler March 1, 2021 If you have any questions concerning this Notice, please contact Katie Fontenot (919) 896 -9715 or me at (910) 433-3336. Sincerely, —DacuSIgbed by: "SAAk atia "-5199G2D3DD5C429... J. Trent Allen Regional Supervisor Water Quality Regional Operations Section Division of Water Resources cc: FRO Compliance Animal Files-Laserfiche Smithfield Pork Notice of Violation hand delivered to Trent Tyler on 3/25/2021 during his compliance inspection. Signed'j 41)1 Print Te hk "SItt- Date 3/45/2I Delivered by: Katie Fontenot Time 1.5 91k Signed VIOLATORS RESPONSE AND NOTES Smithfield. good mood. RespowsV:' Farm: rues_ Daily Rainfall/Weekly Lagoon Level Record 2021 January Freeboard stluaurai Check February Freeboard Structural Check SUN MON TUE WED THUR FRI SAT SUN MON TUE WED THUR FRI SAT if2 2" 1.5" ).2" 1 2 3 4 5 4" 6 g" 20,1 .21/0 3 4 5 6 7 6 1�'1 9 13„ ] 3 9 10 It 12 .�11 33 gl, 10 11 12 r 5" 13 14 15 5" 16 1 14 ,„ 15 ,7" 16 17 18 I.a" 19 12'' 20 1 R'1 17 1e 19 20 21 22 23 al" 21 13„ 22 23 24 25 28 ,2" 27 lci 24 25 �+" 26 , G" 27 . 5" 28 2] 39 , 01, 28 1 rr, March Freeboard Structural Check April Freeboa d Structural Check SUN MON TUE WED THUR FRI SAT SUN MON TUE WED THUR FRI SAT 2 6 ' O 0" 2 3 AL' 24-'• r 8 9 m 17 12 13 �„ 8 3 6 r B 9 ID 14 15 I6 Up 17 18 ID illII 20 2*4(1 11 12 13 14 15 18 1] t„ 21 22 23 24 • 21' 25 26 �jt 1 27 R 11 4 18 19 20 21 22 23 24 26 29 30 31 25 26 27 28 29 311 May Freeboard structural Check June Freeboard Structural Check SUN MON TUE WED THUR FRI SAT SUN MON TUE WED THUR FRI SAT 2 4 5 2 3 4 5 6 ] 6 6 ] 8 9 10 11 12 9 10 11 12 13 14 15 13 14 15 16 17 10 19 16 1] 18 19 20 21 22 20 21 22 23 24 25 26 23 24 25 26 2] 28 T3 27 28 29 30 30 31 h Record rainfall daily. if daily rainfall totals 1 inch or greater, initial in box that lagoon integrity has been cecked. If precipitation is snow, note as S on date Retention Period: 3 years Page 1 of 2 Revision 15: 11/3/20 Smithfield ya°A tooa. Ru bti Farm: ,- Daily RainfalllWeekly Lagoon Level Record 2020 January Freeboard Structural February Freeboard slrualual check SUN MON TUE WED THUR FRI SAT SUN MON TUE WED THUR FRI SAT check �v J ��* (� 1 A` rug" �r> k.: +L� �vlzn I 1�u ,va55 " 'L• - 11 a" 5 firm } 0 it 8 9 10 11 2 3 4 5 0 ] e 12 13 14 15 18 17 18 9 10 11 12 13 14 15 19 20 20 22 23 24 Sr/ 25 ad°/ 16 Aq gri 17 10 10 20 21 22 I/.r1 �E 20 27 20 29 30 31 23 24 25 28 27 28 29 March Freeboa d Structural April Freeboard structural check SUN MON TUE WED THUR FRI SAT SUN MON TUE WED THUR FRI SAI Check 1 2 3 e/•er 4 5 AD11 5 ] /l6// fJ( i�v ii 4 k . 1 2 3 4 r)�YI �i 8 B 10 11 12 19 14 RA// 5 B 9 6 10 11 seej// /_Jl/�{ 15 IB 17 18 19 20 21 24" 12 13 •5„ 15 16 1} 10 025// 22 23 24 25 -r T +fir_ 28 27 28 Ire 19 20 21 22 23 24 _ 25 0241, 29 30 31'.t x 4 28 27 28 29 30 er`J June Freeboard slmtlurel chock May Freeboard swamal SUN MON TUE WED THUR FRI SAT SUN MON TUE WED THUR FRI SAT Check �i, .. su.. 23 r/ 2 3 4 5 8 a3.. 3 4 5 • all 8 _ }8 B .^tA ,S S /1 ] 8 B 10 1. 1.1" 12 13 44 rr 10 11 12 13 14 15 16 19 15 -cr 18� 1} 18 1B 20 / 17/r 17 10 19 20� 21 22 29 21 22ea 0 e A 2a25 //rr if e r '° 27 '// 24 25 28 2} r /r II 28 // 29 // 30 Oa. 28 29 30 t •�` J �¢P�S� qt¢ N� ke. tp. ¢vaa�'vP:S� 91 '",r i _/r t rr box that lagoon integrity has been checked. Record rainfall daily. If daily rainfall totals 1 Inch or greater, initial In If precipitation is snow, note as S on date. Revision 14: 11/26/19 Retention Period: 3 years Paget oft Smithfield. 6.0,1 to... ✓ iblul. Farm:( �i%LIIpi& Daily Rainfall1Weekly Lagoon Level Record July Freeboard SUN MON TUE WED THUR FRI SAT Structural Check .g,e 12 19 26 6 2� .2'' I.l 13 14 20 21 22 26 ,�. {5' Septembe r 15 23 16 30 17 24 16 25 Freeboard 20 SUN MON 2 28 22 29 TUE 23 WED 24 THUR !r FRI 1.5" 18 t" 12 26 November Freeboard SAT SUN 5" • 22 29 16 23 MON Ifr Record rainfall daily. If daily rainfall totals 1 inch or greater, initial In box that lagoon ntegrlty has been checked. If precipitation is snow, note as S on date. 17 24 TUE 4 1e 25 WED 19 THUR 20 27 FRI SAT a3" 4 IH" 2o„ 29 As aat" 34" structural check at a3" 2),,r clis Structural Check SUN .5 16 29 30 August MON "Si a 17 2„ 24� 2 6" October 19 TUE 12 19 r 25 WED 13 20 27 THUR Freeboard FRI .5" 14 yr, 2 28 2020 SAT Structural Check 15 .2 29 Freeboard 4. SUN 4 25 J 2" 19 26 MON December 20 TUE T 21 26 WED 22 25 THUR FRI 26 23 .2" 30 SAT 2111 24ig 2' f" 24" Freeboard SUN MON 20 21 28 29 TUE 2 16 23 90 WED 5" THUR 10 17 24 orr 4 FRI .5 25 fr SAT 62° 12 ,k2 r. 20" 26 rr 32.1 tz 29" on" aK" Structural Check Structural Check Retention Period: 3 years Page 2 of 2 Revision 14: 11/26/19 FORM IRR-2 1 Field Size (wetted acres) = (A) Farm Owner Owner's Address 2 Owner's Phone # Crop Type (3) Lagoon Liquid Irrigation Fields Record One Form for Each Field per Crop Cycle Zone # [F1 Hyd 1 3.77 Trent Tyler Irrigation Operator Irrigation Operator's Address Operator's Phone # From Waste Utilization Plan Recommended PAN Loading (lb/acre) Coastal 4 5 6 7 Facility Number 82 110 305 (10) _agoon ID Date (mm/dd/yr) Irrigation Waste Analysis PAN* (lb/1000 gal) PAN Applied (lb/acre) (8) x (9) Nitrogen Balance** (lb/acre) Weather Code Inspections (Initials) Start Time End Time Total Minutes (3) - (2) # of Sprinklers Operating Flow Rate (gal/min) Total Volume (gallons) (6) x (5) x (4) Volume per Acre (gal/acre) (7) / (A) 1000 305 1 4/1/2020 10:00 AM 2:00 PM 240 1 182 43680 11586 2.72 31.51 273.49 c TT IT 1 4/8/2020 12:00 PM 4:00 PM 240 1 182 43680 11586 3.72 43.10 230.38 c TT 7 1 5/5/2020 4:30 PM 8:30 PM 240 1 182 43680 11586 3.39 39.28 191.11 c TT - r 1 5/12/2020 2:30 PM 6:30 PM 240 1 182 43680 11586 3.39 39.28 151.83 c TT 7f 1 7/6/2020 2:00 PM 6:00 PM 240 1 182 43680 11586 3.39 39.28 112.55 c TT -yf 1 7/10/2020 11:30 AM 3:30 PM 240 1 182 43680 11586 1.98 22.94 89.61 c TT if 1 7/16/2020 11:00 AM 3:00 PM 240 1 182 43680 11586 1.98 22.94 66.67 c TT -ir 1 8/11/2020 10:00 AM 1:00 PM 180 1 182 32760 8690 1.98 17.21 49.47 c IT 7r 1 9/3/2020 6:00 PM 9:00 PM 180 1 182 32760 8690 1.98 17.21 32.26 c TT -f 1 9/5/2020 12:00 PM 3:00 PM 180 1 182 32760 8690 1.98 17.21 15.06 c -TT 7r 1 9/24/2020 3:00 PM 5:30 PM 150 1 182 27300 7241 1.98 14.34 0.72 c TT -71 Owner's Signature Certified Operator (Print) Crop Cycle Totals = 431340 Operator's Signature Operator's Certification No. * NCDA Waste Anaylsis or Equivalent. At a minimum, waste analysis is required within 60 days of land application events. ** Enter the value received by subtracting column (10) from (B). Continue subtracting column (10) from column (11) following each irrigation event. ***Enter nutrient source (ie. Laaoon/Storaae Pond ID. commerical fertilizer. dry litter. etc.) Combined IRR1/2 Form - 8/3/2012 I 304.28-E FORM IRR-2 Lagoon Liquid Irrigation Fields Record One Form for Each Field per Crop Cycle 1 Field Size (wetted acres) = (A) Farm Owner Owner's Address 2 Owner's Phone # Crop Type (3) Zone # F1 Hyd 2 3.81 Trent Tyler Irrigation Operator Irrigation Operator's Address Operator's Phone # From Waste Utilization Plan Recommended PAN Loading (lb/acre) Coastal (4) 5 (6) 7) 8 Facility Number 82 110 305 (9 (10) Lagoon ID Date (mm/dd/yr) Irrigation Waste Analysis PAN* (lb/1000 gal) PAN Applied (lb/acre) (8) x (9) Nitrogen Balance** (lb/acre) Weather Code Inspections (Initials) Start Time End Time Total Minutes (3) - (2) # of Sprinklers Operating Flow Rate (gal/min) Total Volume (gallons) (6) x (5) x (4) Volume per Acre (gal/acre) (7) / (A) 1000 305 1 4/6/2020 3:00 PM 7:00 PM 240 1 182 43680 11465 3.72 42.65 262.35 c TT Ir 1 4/10/2020 10:00 AM 2:00 PM 240 1 182 43680 11465 3.39 38.86 223.49 c TT -Tr 1 5/4/2020 2:00 PM 6:00 PM 240 1 182 43680 11465 3.39 38.86 184.62 c TT "if 1 5/13/2020 11:30 AM 3:30 PM 240 1 182 43680 11465 3.39 38.86 145.76 c TT -ir 1 5/17/2020 5:00 PM 9:00 PM 240 1 182 43680 11465 3.39 38.86 106.89 c TT Tf 1 7/10/2020 4:00 PM 8:00 PM 240 1 182 43680 11465 1.98 22.70 84.19 c TT Tr 1 7/13/2020 11:00 AM 3:00 PM 240 1 182 43680 11465 1.98 22.70 61.49 c TT it 1 7/16/2020 5:00 PM 8:00 PM 180 _ 1 182 32760 8598 1.98 17.02 44.47 c TT -g- 1 8/11/2020 3:00 PM 6:00 PM 180 1 182 32760 8598 1.98 17.02 27.44 c TT 7r 1 9/4/2020 10:00 AM 12:30 PM 150 1 182 27300 7165 1.98 14.19 13.26 c TT it 1 9/16/2020 9:00 AM 11:20 AM 140 1 182 25480 _ 6688 1.98 13.24 0.01 c TT 7f Owner's Signature Certified Operator (Print) Crop Cycle Totals = 424060 Operator's Signature Operator's Certification No. 304.99 * NCDA Waste Anaylsis or Equivalent. At a minimum, waste analysis is required within 60 days of land application events. ** Enter the value received by subtracting column (10) from (B). Continue subtracting column (10) from column (11) following each irrigation event. ***Enter nutrient source (ie. Lagoon/Storage Pond ID, commerical fertilizer. dry litter, etc.) Combined IRR1/2 Form - 8/3/2012 FORM IRR-2 Lagoon Liquid Irrigation Fields Record One Form for Each Field per Crop Cycle 1 Field Size (wetted acres) = (A) Farm Owner Owner's Address 2 Owner's Phone # Crop Type (3) Zone # F1 Hyd 3 3.81 Trent Tyler Irrigation Operator Irrigation Operator's Address Operator's Phone # From Waste Utilization Plan Recommended PAN Loading (lb/acre) Coastal 4 5 6) 7) 8 Facility Number 82 110 305 (9 (10 Lagoon ID Date (mm/dd/yr) Irrigation Waste Analysis PAN* (lb/1000 gal) PAN Applied (lb/acre) (8) x (9) Nitrogen Balance" (lb/acre) Weather Code Inspections (Initials) Start Time End Time Total Minutes (3) - (2) # of Sprinklers Operating Flow Rate (gal/min) Total Volume (gallons) (6) x (5) x (4) Volume per Acre (gal/acre) (7) / (A) 1000 305 1 3/13/2020 1:00 PM 5:00 PM 240 1 182 43680 11465 2.72 31.18 273.82 c TT -7F 1 4/4/2020 10:00 AM 2:00 PM 240 1 182 43680 _ 11465 2.72 31.18 242.63 c TT -r 1 4/11/2020 11:00 AM 3:00 PM 240 1 182 43680 11465 3.39 38.86 203.77 c TT -7r 1 5/14/2020 9:00 AM 1:00 PM 240 1 182 43680 11465 3.39 38.86 164.90 c TT it 1 5/15/2020 5:00 PM 9:00 PM 240 1 182 43680 11465 3.39 38.86 126.04 c TT 7r 1 7/3/2020 5:00 PM 9:00 PM 240 1 182 43680 _ 11465 1.98 22.70 103.34 c TT -j 1 7/14/2020 3:00 PM 6:45 PM 225 1 182 40950 _ 10748 1.98 21.28 82.06 c TT -7r 1 7/17/2020 12:00 PM 3:30 PM 210 1 182 38220 10031 1.98 19.86 62.19 c TT -7r 1 7/19/2020 2:00 PM 5:30 PM 210 1 182 38220 10031 1.98 19.86 42.33 c TT 1 8/13/2020 4:00 PM 7:40 PM 220 1 182 40040 10509 1.98 20.81 21.52 c TT i1 1 9/23/2020 10:00 AM 1:45 PM 225 1 182 40950 10748 1.98 21.28 0.24 c TT 7( r - Owner's Signature Crop Cycle Totals = 460460 Operator's Signature 304.76 Certified Operator (Print) Operator's Certification No. * NCDA Waste Anaylsis or Equivalent. At a minimum, waste analysis is required within 60 days of land application events. ** Enter the value received by subtracting column (10) from (B). Continue subtracting column (10) from column (11) following each irrigation event. ***Enter nutrient source (ie. Lagoon/Storaae Pond ID. commerical fertilizer. dry litter. etc.) Combined IRR1/2 Form - 8/3/2012 FORM IRR-2 Lagoon Liquid Irrigation Fields Record One Form for Each Field per Crop Cycle 1 Field Size (wetted acres) = (A) Farm Owner Owner's Address 2 Owner's Phone # Crop Type (3) Zone F1 Hyd 4 1.66 Trent Tyler Irrigation Operator Irrigation Operator's Address Operator's Phone # From Waste Utilization Plan Recommended PAN Loading (lb/acre) Coastal 4) 5 (8 7) 8 Facility Number 82 110 305 (9 (10 1 Lagoon ID Date (mm/dd/yr) Irrigation Waste Analysis PAN* (lb/1000 gal) PAN Applied (lb/acre) (8) x (9) Nitrogen Balance** (lb/acre) Weather Code Inspections (Initials) Start Time End Time Total Minutes (3) - (2) # of Sprinklers Operating Flow Rate (gal/min) Total Volume (gallons) (6) x (5) x (4) Volume per Acre (gal/acre) (7) / (A) 1000 305 1 3/9/2020 4:00 PM 6:00 PM 120 1 182 21840 _ 13157 2.72 35.79 269.21 c TT 1 3/11/2020 10:00 AM 12:00 PM 120 1 182 21840 13157 2.72 35.79 233.43 c TT 1 4/4/2020 3:00 PM 5:00 PM 120 1 182 21840 13157 2.72 35.79 197.64 c TT 1 5/12/2020 10:00 AM 12:00 PM 120 1 182 21840 13157 3.39 44.60 153.04 c TT 1 5/14/2020 5:00 PM 7:00 PM 120 1 182 21840 13157 3.39 44.60 108.44 c TT 1 7/15/2020 12:00 PM 2:00 PM 120 1 182 21840 13157 1.98 26.05 82.39 c TT 1 8/12/2020 8:00 AM 10:00 AM 120 1 182 21840 13157 1.98 26.05 56.34 c TT 1 8/13/2020 9:00 AM 11:00 AM 120 1 182 21840 13157 1.98 26.05 30.29 c TT 1 9/14/2020 4:00 PM 6:15 PM 135 1 182 24570 14801 1.98 29.31 0.98 c TT Owner's Signature Crop Cycle Totals = 199290 Operator's Signature 304.02 Certified Operator (Print) Operator's Certification No. * NCDA Waste Anaylsis or Equivalent. At a minimum, waste analysis is required within 60 days of land application events. ** Enter the value received by subtracting column (10) from (B). Continue subtracting column (10) from column (11) following each irrigation event. ***Enter nutrient source (ie. Lagoon/Storage Pond ID, commerical fertilizer, dry litter, etc.) Combined IRR1/2 Form-8/3/2012 FORM IRR-2 Lagoon Liquid Irrigation Fields Record One Form for Each Field per Crop Cycle 1 Field Size (wetted acres) = (A) • Farm Owner Owner's Address 2 Owner's Phone # Crop Type (3) Zone # F2 Hyd 5 3.42 Trent Tyler Irrigation Operator Irrigation Operator's Address Operator's Phone # From Waste Utilization Plan Coastal 4 5 6 Recommended PAN Loading (lb/acre) 7 8 Facility Number 11 82 110 305 (9 (10) Lagoon ID Date (mm/dd/yr) Irrigation _ Waste Analysis PAN* (lb/1000 gal) PAN Applied (lb/acre) (8) x (9) Nitrogen Balance** (lb/acre) Weather Code Inspections (Initials) Start Time End Time Total Minutes (3) - (2) # of Sprinklers Operating Flow Rate (gal/min) Total Volume (gallons) (6) x (5) x (4) Volume per Acre (gal/acre) (7) / (A) 1000 305 1 3/9/2020 10:00 AM 1:00 PM 180 1 182 32760 9579 2.72 26.05 278.95 c TT -Fr 1 3/14/2020 9:00 AM 12:00 PM 180 _ 1 182 32760 9579 2.72 26.05 252.89 c TT 7r 1 4/16/2020 6:00 PM 9:00 PM 180 1 182 32760 9579 3.39 32.47 220.42 c TT -ff- 1 4/28/2020 2:00 PM 5:00 PM 180 1 182 32760 9579 3.39 32.47 187.95 c TT 7r 1 5/10/2020 9:00 AM 12:00 PM 180 1 182 32760 9579 3.39 32.47 155.47 c TT -ir 1 5/15/2020 12:00 PM 3:00 PM 180 1 182 32760 9579 3.39 32.47 123.00 c TT 7( 1 6/9/2020 2:00 PM 5:00 PM 180 1 182 32760 9579 3.39 32.47 90.53 c TT 7( 1 7/2/2020 3:00 PM 6:00 PM 180 1 182 32760 9579 3.39 32.47 58.05 c TT 7-4- 1 7/22/2020 10:00 AM 1:15 PM 195 1 182 35490 10377 1.98 20.55 37.51 c TT 7f 1 8/17/2020 11:00 AM 2:15 PM 195 1 182 35490 10377 1.98 20.55 16.96 c TT 7,-- 1 8/21/2020 3:00 PM 5:40 PM 160 1 182 29120 _ 8515 1.98 16.86 0.10 c TT Owner's Signature Certified Operator (Print) Crop Cycle Totals = 362180 Operator's Signature Operator's Certification No. * NCDA Waste Anaylsis or Equivalent. At a minimum, waste analysis is required within 60 days of land application events. ** Enter the value received by subtracting column (10) from (B). Continue subtracting column (10) from column (11) following each irrigation event. ***Enter nutrient source fie. Lagoon/Storage Pond ID, commerical fertilizer, dry litter, etc.) Combined IRR1/2 Form - 8/3/2012 304.90 FORM IRR-2 1 Field Size (wetted acres) = (A) Farm Owner Owners Address 2 Owner's Phone # Crop Type (3) Lagoon Liquid Irrigation Fields Record One Form for Each Field per Crop Cycle Zone # F2 Hyd 6 5.39 Trent Tyler Irrigation Operator Irrigation Operator's Address Operators Phone # From Waste Utilization plan Recommended PAN Loading (lb/acre) Coastal 4 5 (6) 7 8 Facility Number 82 110 305 9 10 11 Lagoon ID Date (mm/dd/yr) Irrigation Waste Analysis PAN' (lb/1000 gal) PAN Applied (lb/acre) (8)�(91 Nitrogen Balance* (lb/acre) Weather Code Inspections (Initials) Start Time End Time Total Minutes (3) - (2) # of Sprinklers Operating Flow Rate (gal/min) Total Volume (gallons) (6) x (5) x (4) Volume per Acre (gal/acre) (7) / (A) 1000 305 1 3/1/2020 1:00 PM 6:00 PM 300 1 182 54600 10130 2.72 27.55 277.45 c -71 TT 1 3/10/2020 10:00 AM 3:00 PM 300 1 182 54600 10130 2.72 27.55 249.89 c IT TT -Tr 1 3/15/2020 12:00 PM 4:45 PM 285 1 182 51870 9623 2.72 26.18 223.72 c -7r TT -rr 1 4/23/2020 5:00 PM 9:40 PM 280 1 182 50960 9455 3.39 32.05 191.67 c -Tr TT -rr 1 5/10/2020 2:00 PM 6:30 PM 270 1 182 49140 9117 3.39 30.91 160.76 c -r TT -Fr 1 5/16/2020 9:00 AM 1:30 PM 270 1 182 49140 9117 3.39 30.91 129.85 c TT . 1 6/4/2020 5:00 PM 10:00 PM 300 1 182 54600 10130 3.39 34.34 95.51 c - - TT -rr 1 6/28/2020 2:00 PM 6:00 PM 240 1 182 43680 8104 3.39 27.47 68.04 c -Tr TT fl 1 7/3/2020 10:00 AM 2:00 PM 240 1 182 43680 8104 3.39 27.47 40.57 c -7r TT 7r 1 7/21/2020 11:00 AM 4:00 PM 300 1 182 54600 10130 1.98 20.06 20.51 c -Tr TT 7r 1 8/12/2020 11:00 AM 4:00 PM 300 1 182 54600 10130 1.98 20.06 0.46 c Tr TT '7r Crop Cycle Totals = 561470 Owners Signature Operator's Signature 304.5 Certified Operator (Print) Operator's Certification No. * NCDA Waste Anaylsis or Equivalent, At a minimum, waste analysis is required within 60 days of land application events. ** Enter the value received by subtracting column (10) from (B). Continue subtracting column (10) from column (11) following each irrigation event. **'Enter nutrient source (ie. Lagoon/Storage Pond ID, commerical fertilizer, dry litter, etc.) Combined IRR1/2 Form-8/3/2012 FORM IRR-2 Lagoon Liquid Irrigation Fields Record One Form for Each Field per Crop Cycle 1 Field Size (wetted acres) = (A) Farm Owner Owner's Address 2 Owner's Phone # Crop Type (3) Zone F3 Hyd 7 3.05 Trent Tyler 4) Coastal 5 Irrigation Operator Irrigation Operator's Address Operators Phone # From Waste Utilization Plan (6) Recommended PAN Loading (lb/acre) 7) 8 Facility Number 82 110 305 (9 (10) _agoon ID Date (mm/dd/yr) Irrigation Waste Analysis PAN* (lb/1000 gal) PAN Applied (lb/acre) (8) x (9) Nitrogen Balance** (lb/acre) Weather Code Inspections (Initials) Start Time End Time Total Minutes (3) - (2) # of Sprinklers Operating Flow Rate (gal/min) Total Volume (gallons) (6) x (5) x (4) Volume per Acre (gal/acre) (7) / (A) 1000 305 1 3/12/2020 1:00 PM 4:00 PM 180 1 182 32760 10741 2.72 29.22 275.78 c - r TT 1 3/19/2020 2:00 PM 5:00 PM 180 1 182 32760 10741 2.72 29.22 246.57 c -g- TT 1 4/7/2020 12:00 PM 3:00 PM 180 1 182 32760 10741 3.72 39.96 206.61 c `7f TT 1 4/14/2020 4:30 PM 7:30 PM 180 1 182 32760 10741 3.39 36.41 170.20 c -fr TT 1 5/11/2020 10:00 AM 1:00 PM 180 1 182 32760 10741 3.39 36.41 133.79 c -1'r TT 1 5/18/2020 5:00 PM 8:00 PM 180 1 182 32760 10741 3.39 36.41 97.38 c -Jr TT 1 6/27/2020 2:00 PM 4:45 PM 165 1 182 30030 9846 3.39 33.38 64.00 c it TT 1 7/9/2020 11:00 AM 1:30 PM 150 1 182 27300 8951 1.98 17.72 46.28 c -jr TT 1 7/11/2020 10:00 AM 12:30 PM 150 1 182 27300 8951 1.98 17.72 28.55 c -Fr TT 1 8/13/2020 12:00 PM 2:00 PM 120 1 182 21840 7161 1.98 14.18 14.38 c TT 1 8/22/2020 5:00 PM 7:00 PM 120 1 182 21840 7161 1.98 14.18 0.20 c TT Owner's Signature Certified Operator (Print) * NCDA Waste Anaylsis or Equivalent. At a minimum, waste analysis is required within 60 days of land application events. ** Enter the value received by subtracting column (10) from (B). Continue subtracting column (10) from column (11) following each irrigation event. ***Enter nutrient source (ie. Lagoon/Storage Pond ID, commerical fertilizer, dry litter, etc.) Combined IRR1/2 Form-8/3/2012 Crop Cycle Totals = 324870 304.80 Operator's Signature Operator's Certification No. FORM IRR-2 Lagoon Liquid Irrigation Fields Record One Form for Each Field per Crop Cycle 1 Field Size (wetted acres) = (A) Farm Owner Owners Address 2) Owner's Phone # Crop Type (3) Zone #1 F1 Hyd1 3.77 Trent Tyler Irrigation Operator Irrigation Operators Address Operator's Phone # From Waste utilization Plan Recommended PAN Loading (lb/acre) oats 4 (5) 6) (7 (8 Facility Number 82 110 100 (9) 10 11 _agoon ID Date (mm/dd/yr) Irrigation Waste Analysis PAN* (lb/1000 gal) PAN Applied (lb/acre) (8) x (91 Nitrogen Balance** (lb/acre) Weather Code tnSpections (Initials) Start Time End Time Total Minutes (3) - (2) # of Sprinklers Operating Flow Rate (gal/min) Total Volume (gallons) (6) x (5) x (4) Volume per Acre (gal/acre) (7) / (A) 1000 100 1 10/8/2020 1:00 PM 4:30 PM 210 1 182 38220 10138 1.98 20.07 79.93 c TT TT 1 11/21/2020 2:00 PM 4:00 PM 120 1 182 21840 5793 2.48 14.37 65.56 c TT 1 12/11/2020 1:00 PM 2:30 PM 90 1 219 19710 5228 2.23 11.66 53.90 c TT 1 1/10/2021 3:30 PM 4:30 PM 60 1 219 13140 3485 2,23 7.77 46.13 c TT 1 1/22/2021 1:00 PM 2:00 PM 60 1 219 13140 3485 2,23 7.77 38.36 c TT 1 2/9/2021 11:00 AM 1:00 PM 120 1 219 26280 6971 2,23 15.54 22.81 c TT 1 2/25/2021 10:00 AM 12:55 PM _ 175 1 219 38325 10166 2.23 22.67 0.14 c TT 7'( Owners Signature Crop Cycle Totals = 170655 Operators Signature 99.86 Certified Operator (Print) Operator's Certification No. * NCDA Waste Anaylsis or Equivalent. At a minimum, waste analysis is required within 60 days of land application events. ** Enter the value received by subtracting column (10) from (B). Continue subtracting column (10) from column (11) following each irrigation event. ***Enter nutrient source (ie. Lagoon/Storage pond ID, commerical fertilizer, dry litter, etc.) Combined IRR1/2 Form - 8/3/2012 FORM IRR-2 Lagoon Liquid Irrigation Fields Record One Form for Each Field per Crop Cycle 1 Field Size (wetted acres) = (A) Farm Owner Owner's Address 2 Owner's Phone # Crop Type (3) Zone # F1 Hyd 2 3.81 Trent Tyler Irrigation Operator Irrigation Operator's Address Operator's Phone # From Waste Utilization Plan Recommended PAN Loading (lb/acre) Oats 4 5 6 7 8 Facility Number 82 110 100 9 10 11 Lagoon ID Date (mm/dd/yr) Irrigation Waste Analysis PAN* (lb/1000 gal) PAN Applied (lb/acre) (8) x (9) Nitrogen Balance** (Ib/acre) Weather Code tspection (Initials) Start Time End Time Total Minutes (3) - (2) # of Sprinklers Operating Flow Rate (gal/min) Total Volume (gallons) (6) x (5) x (4) Volume per Acre (gal/acre) (7) / (A) 1000 100 1 10/9/2020 5:00 PM 8:00 PM 180 1 182 32760 8598 1.98 17.02 82.98 c 7(TT 1 11/22/2020 4:00 PM 6:15 PM 135 1 182 24570 6449 2.48 15.99 66.98 c TrTT 1 12/12/2020 12:00 PM 2:00 PM 120 1 219 26280 6898 2.23 15.38 51.60 c TT 1 1/6/2021 5:00 PM 6:00 PM 60 1 219 13140 3449 2.23 7.69 43.91 c TT 1 1/23/2021 1:00 PM 2:00 PM 60 1 219 13140 3449 2.23 7.69 36.22 c TT 1 2/9/2021 3:00 PM 5:30 PM 150 1 219 32850 8622 2.23 19.23 16.99 c.TT 1 2/25/2021 6:00 PM 8:10 PM 130 1 219 28470 7472 2.23 16.66 0.33 c _ t I Owner's Signature Certified Operator (Print) Crop Cycle Totals = 171210 Operator's Signature Operator's Certification No. 99.67 * NCDA Waste Anaylsis or Equivalent. At a minimum, waste analysis is required within 60 days of land application events. ' Enter the value received by subtracting column (10) from (B). Continue subtracting column (10) from column (11) following each irrigation event. ***Enter nutrient source (ie. Lagoon/Storage Pond ID, commerical fertilizer, dry litter, etc.) Combined IRR1/2 Form - 8/3/2012 FORM IRR-2 Lagoon Liquid Irrigation Fields Record One Form for Each Field per Crop Cycle 1 Field Size (wetted acres) = (A) Farm Owner Owner's Address 2 Owner's Phone # Crop Type (3) Zone # F1 Hyd 3 3.81 Trent Tyler Irrigation Operator Irrigation Operators Address Operator's Phone # From Waste Utilization Plan Recommended PAN Loading (lb/acre) oats (4) 5 (6) 7) 8 Facility Number 82 110 100 (9 (10) 11 Lagoon ID Date (mm/dd/yr) Irrigation Waste Analysis PAN' (lb/1000 gal) PAN Applied (lb/acre) (8) x (9) Nitrogen Balance** (lb/acre) Weather Code Inspections (Initials) Start Time End Time Total Minutes (3) - (2) # of Sprinklers Operating Flow Rate (gal/min) Total Volume (gallons) (6) x (5) x (4) Volume per Acre (gal/acre) (7) / (A) 1000 100 1 10/20/2020 12:00 PM 3:00 PM 180 1 182 32760 8598 _ 1.98 17.02 82.98 c 1-ir TT 1 11/25/2020 12:30 PM 2:45 PM 135 1 182 24570 6449 2.48 15.99 66.98 c -1-1 TT 1 12/12/2021 3:00 PM 5:00 PM 120 1 219 26280 _ 6898 2.23 15.38 51.60 c TT 1 1/12/2021 10:00 AM 11:00 AM 60 1 219 13140 3449 2.23 7.69 43.91 c TT 1 1/14/2021 11:00 AM 12:00 PM 60 1 219 13140 _ 3449 2.23 7.69 36.22 c TT 1 2/10/2021 1:00 PM 3:30 PM 150 1 219 32850 8622 2.23 19.23 16.99 c -Ij TT 1 2/24/2021 11:30 AM 1:40 PM 130 1 219 28470 7472 2.23 16.66 0.33 c 1j TT Owner's Signature Crop Cycle Totals = 171210 Operator's Signature 99.67 Certified Operator (Print) Operator's Certification No. " NCDA Waste Anaylsis or Equivalent. At a minimum, waste analysis is required within 60 days of land application events. ** Enter the value received by subtracting column (10) from (B). Continue subtracting column (10) from column (11) following each irrigation event. ""*Enter nutrient source (ie. Lagoon/Storage Pond ID, commerical fertilizer, dry litter, etc.) Combined IRR1/2 Form - 8/3/2012 FORM IRR-2 Lagoon Liquid Irrigation Fields Record One Form for Each Field per Crop Cycle 1 Field Size (wetted acres) = (A) Farm Owner Owner's Address 2 Zone # F1 Hyd 4 1.66 Trent Tyle Owners Phone # Crop Type (3) (4 Irrigation Operator Irrigation Operator's Address Operator's Phone # From Waste Utilization Plan Recommended PAN Loading (lb/acre) oats 5 (6) 7 (8) Facility Number 82 110 100 (9) (10) 11) _agoon ID Date (mm/dd/yr) Irrigation Waste Analysis PAN* (lb/1000 gal) PAN Applied (lb/acre) (8) x (9) Nitrogen Balance'* (lb/acre) Weather Code Inspections (Initials) Start Time End Time Total Minutes (3)- (2) # of Sprinklers Operating Flow Rate (gal/min) Total Volume (gallons) (6) x (5) x (4) Volume per Acre (gal/acre) (7) / (A) 1000 100 1 10/21/2020 12:00 PM 2:00 PM 120 1 182 21840 13157 1.98 26.05 73.95 c TT 1 11/29/2020 3:00 PM 4:00 PM 60 1 182 10920 6578 2.48 16.31 57.64 c TT 1 1/15/2021 12:00 PM 1:00 PM 60 1 219 13140 7916 2.23 17.65 39.98 c TT 1 2/24/2021 1:00 PM 2:45 PM 105 1 219 22995 13852 2.23 30.89 9.09 c TT Owners Signature Crop Cycle Totals = 68895 Operator's Signature 90.91 Certified Operator (Print) Operator's Certification No. * NCDA Waste Anaylsis or Equivalent. At a minimum, waste analysis is required within 60 days of land application events. ** Enter the value received by subtracting column (10) from (B). Continue subtracting column (10) from column (11) following each irrigation event. ***Enter nutrient source (ie. Lagoon/Storage Pond ID, commerical fertilizer, dry litter, etc.) Combined IRR1/2 Form - 8/3/2012 FORM IRR-2 Lagoon Liquid Irrigation Fields Record One Form for Each Field per Crop Cycle 1 Field Size (wetted acres) = (A) Farm Owner Owner's Address 2 Owner's Phone # Crop Type (3) Zone # F2 Hyd 5 3.42 Trent Tyler Irrigation Operator Irrigation Operator's Address Operator's Phone # From Waste Utilization Plan Recommended PAN Loading (lb/acre) oats 4) 5 (6) 7) 8 Facility Number 82 110 100 (9 10 11 _agoon ID Date (mm/dd/yr) Irrigation Waste Analysis PAN* (Ib/1000 gal) PAN Applied (lb/acre) (8) x (9) Nitrogen Balance*' (lb/acre) Weather Code Inspections (Initials) Start Time End Time Total Minutes (3) - (2) # of Sprinklers Operating Flow Rate (gal/min) Total Volume (gallons) (6) x (5) x (4) Volume per Acre (gal/acre) (7) / (A) 1000 100 1 11/22/2020 10:00 AM 12:00 PM 120 1 182 21840 6386 2.48 15.84 84.16 c TT 1 1/17/2021 1:00 PM 2:30 PM 90 1 219 19710 5763 2.23 12.85 71.31 c TT 1 2/5/2021 12:00 PM 3:30 PM 210 1 219 45990 _ 13447 2.23 29.99 41.32 c lrTr 1 2/10/2021 8:30 AM 12:00 PM 210 1 219 45990 13447 2.23 29.99 11.34 c 7r TT Owner's Signature Crop Cycle Totals = 133530 Operator's Signature 88.66 Certified Operator (Print) Operator's Certification No. * NCDA Waste Anaylsis or Equivalent. At a minimum, waste analysis is required within 60 days of land application events. "Enter the value received by subtracting column (10) from (B). Continue subtracting column (10) from column (11) following each irrigation event. ***Enter nutrient source (ie. Lagoon/Storage Pond ID, commerical fertilizer, dry litter, etc.) Combined IRR1/2 Form - 8/3/2012 FORM IRR-2 Lagoon Liquid Irrigation Fields Record One Form for Each Field per Crop Cycle 1 Field Size (wetted acres) = (A) Farm Owner Owner's Address 2 Owner's Phone # Crop Type (3) Zone # `F2 Hyd 6 5.39 Trent Tyler Irrigation Operator Irrigation Operator's Address Operator's Phone # From Waste Utilization Plan Recommended PAN Loading (lb/acre) oats U Facility Number 82 110 100 Lagoon ID Date (mm/dd/yr) Irrigation Waste Analysis PAN* (lb/1000 gal) PAN Applied (lb/acre) 8 x 9 - Nitrogen Balance** (lb/acre) Weather Code Inspections (Initials) Start Time End Time Total Minutes (3) - (2) # of Sprinklers Operating Flow Rate (gal/min) Total Volume (gallons) (6) x (5) x (4) Volume per Acre (gal/acre) (7) / (A) 1000 100 1 10/22/2020 1:00 PM 5:30 PM 270 1 182 49140 9117 1.98 18.05 81.95 c 7r TT 1 11/21/2020 5:00 PM 11:00 PM 360 1 182 65520 12156 2.48 30.15 51.80 c 7T- TT *IT 1 1/7/2021 12:00 PM 1:15 PM 75 1 219 16425 3047 2.23 6.80 45.01 c TT 1 1/20/2021 10:00 AM 11:15 AM 75 1 219 16425 3047 2.23 6.80 38.21 c TT 1 2/23/2021 11:00 AM 3:30 PM 270 1 219 59130 10970 2.23 24.46 13.75 c TT p Cycle Totals = 20664U 86.25 Owner's Signature Operator's Signature Certified Operator (Print) Operator's.Certification No. * NCDA Waste Anaylsis or Equivalent. At a minimum, waste analysis is required within 60 days of land application events. ** Enter the value received by subtracting column (10) from (B). Continue subtracting column (10) from column (11) following each irrigation event. ***Enter nutrient source (ie. Lagoon/Storage Pond ID, commerical fertilizer, dry litter, etc.) Combined IRR1/2 Form - 8/3/2012 FORM IRR-2 1 Field Size (wetted acres) = (A) Farm Owner Owner's Address 2 Owner's Phone # Crop Type (3) Lagoon Liquid Irrigation Fields Record One Form for Each Field per Crop Cycle Zone # F3 Hyd 7 3.05 Trent Tyler Irrigation Operator Irrigation Operator's Address Operator's Phone # From Waste Utilization Plan Recommended PAN Loading (lb/acre) oats 4 5 6 7 8 Facility Number 82 110 100 9 10 11 Lagoon ID Date (mm/dd/yr) Irrigation Waste Analysis PAN* (lb/1000 gal) PAN Applied (lb/acre) (8) x (9) Nitrogen Balance** (lb/acre) Weather Code Inspections (Initials) Start Time End Time Total Minutes (3) - (2) # of Sprinklers Operating Flow Rate (gal/min) Total Volume (gallons) (6) x (5) x (4) Volume per Acre (gal/acre) (7) / (A) 1000 100 1 10/23/2020 1:00 PM 3:00 PM 120 1 182 21840 7161 1.98 14.18 85.82 c TT 1 11/19/2020 11:00 AM 1:00 PM 120 1 182 21840 7161 2.48 17.76 68.06 c TT 1 12/10/2020 1:00 PM 2:15 PM 75 1 219 16425 5385 2.23 12.01 56.05 c TT 1 1/24/2021 4:30 PM 5:45 PM 75 1 219 16425 5385 2.23 12.01 44.05 c TT 1 2/1/2021 12:00 PM 2:30 PM 150 1 219 32850 10770 2.23 24.02 20.03 c TT 1 2/8/2021 10:00 AM 12:00 PM 120 1 219 26280 8616 2.23 19.21 0.81 c TT Owner's Signature Crop Cycle Totals = 135660 Operator's Signature 99.19 Certified Operator (Print) Operator's Certification No. * NCDA Waste Anaylsis or Equivalent. At a minimum, waste analysis is required within 60 days of land application events. ** Enter the value received by subtracting column (10) from (B). Continue subtracting column (10) from column (11) following each irrigation event. ***Enter nutrient source (ie. Lagoon/Storage Pond ID, commerical fertilizer, dry litter, etc.) Combined IRR1/2 Form - 8/3/2012 SITE PHOTOS r k 1 t -• / r illas - I 61 - - 414 i w i IN Y •r r. '+ ' • - _ - - +- -sr _ram ;a•..• I. Mr s i f ' -. - f Br 4 9- i 4- 41. t 461. • anr lob wet MIN y - i J. Z - ▪ 41.6 4 { 411. • 664 tt rt tit REP - — 11. 41. alr Oat N am •* Triple T Farm 82-0110/lagoon design 19" per BIMS freeboard marker; + n instrument Legend DWR LAGOON SURVEY RESULTS : 2- 0 11 TR id LE T FA i? ''"! ,. /1? P,5t & 1_1_ O m,J y, ,1',) D y , c ao e_) 4/9 °F BAteEJ } y lioAiz:yc sTA. Ls HI F S /FS B P'l = / 00. op g..7Ce to4010 �. 41,81p 3 5 1b PasAJT J i1 k/A7ER LEV L /3 /V /5 / 0E-z 5,73 5. 85 Y e z V 2 ; 5 . ,,) '7, 08 5'. 73 TT R 'v 99 78 9q.gs 99.03 , 7/ 99. /2 99, a 96.�a 97. go 99,23 24.97 5, 37 41.4,5 ELEV. 99. 5-9 00.31