Loading...
HomeMy WebLinkAbout670080_Compliance Evaluation Inspection_20230112r Division of"Water Resources _ O Division of Soil a" h Water Conservation ", �- - O Othex_Agency Type of Visit: c0 Compliance Inspection 0 Operation Review 0 Structure Evaluation 0 Technical Assistance Reason for Visit: ® Routine 0 Complaint 0 Follow-up 0 Referral 0 Emergency 0 Other 0 Denied Access Date of Visit: Arrival Time: Departure Time: `---'� County: � Farm Name: 1 -p— I-C v ; ,n S (� 1—c i Y ✓►-• Owner Email: Owner Name: Mailing Address: Physical Address: Facility Contact: Onsite Representative: Certified Operator: Back-up Operator: Location of Farm: 5 .1 S cr, Title: Latitude: Phone: Integrator: Region: Phone: q (ID-38'5 _kA1 r01 Certification Number: Certification Number: Longitude: " Design Current design Current",` Design,Gtirrent Swine Capacity '� ]Pop. �Wetl"oultry . "Capacity "., Pop _ Cattle Capacity ��'op. " Wean to Finish Wean to Feeder Feeder to Finish 7-fo40 (7 Farrow to Wean Farrow to Feeder Farrow to Finish Gilts Boars Layer Non -Layer Resign Current.`. �Dr ",Poultry< Capacity, ° PQ"-.v Layers Non -Layers Pullets Turkeys Turkey Poults Other Dairy Cow Dairy Calf Dairy Heifer Dry Cow Non -Dairy Beef Stocker Beef Feeder Beef Brood Cow Discharges and Stream Impacts 1. Is any discharge observed from any part of the operation? ❑ Yes EX ❑ NA ❑ NE Discharge originated at: ❑ Structure ❑ Application Field ❑ Other: a. Was the conveyance man-made? ❑ Yes ❑ No �A ❑ NE b. Did the discharge reach waters of the State? (If yes, notify DWR) ❑ Yes ❑ No ❑ INA ❑ NE c. What is the estimated volume that reached waters of the State (gallons)? d. Does the discharge bypass the waste management system? (If yes, notify DWR) ❑ Yes ❑ N,p, NA ❑ NE 2. Is there evidence of a past discharge from any part of the operation? ❑ Yes u o ❑ NA No ❑ NE 3. Were there any observable adverse impacts or potential adverse impacts to the waters ❑ Yes ❑ NA ❑ NE of the State other than from a discharge? Page 1 of 3 511212020 Continued Facility Number: -1 - O jDate of Inspection: 1 i Z Waste Collection & Treatment 4. Is storage capacity (structural plus storm storage plus heavy rainfall) less than adequate? ❑ Yes a. If yes, is waste level into the structural freeboard? 0 Yes Identifier: Spillway?: Designed Freeboard (in): Structure 1 Structure 2 Structure 3 Structure 4 Structure 5 1 Observed Freeboard (in): 5. Are there any immediate threats to the integrity of any of the structures observed? (i.e., large trees, severe erosion, seepage, etc.) 6. Are there structures on -site which are not properly addressed and/or managed through a waste management or closure plan? RT-N--o- ❑ NA ❑ NE ❑No [ZNA ❑NE Structure 6 ❑ Yes [2 1V o ❑ NA ❑ NE ❑ Yes E24o ❑ NA ❑ NE If any of questions 4-6 were answered yes, and the situation poses an immediate public health or environmental threat, notify DWR 7. Do any of the structures need maintenance or improvement? ❑ Yes❑,'� ❑ NA ❑ NE Do any of the structures lack adequate markers as required by the permit? ❑ Yes J P8. O ❑ NA ❑ NE (not applicable to roofed pits, dry stacks, and/or wet stacks) 9. Does any part of the waste management system other than the waste structures require ❑ Yes Eallo ❑ NA ❑ NE maintenance or improvement? Waste Application 10. Are there any required buffers, setbacks, or compliance alternatives that need ❑ Yes) [Er�o ❑ NA ❑ NE maintenance or improvement? 11. Is there evidence of incorrect land application7If yes, check the appropriate box below. ❑ Yes i to ❑ NA ❑ NE ❑ Excessive Ponding ❑ Hydraulic Overload ❑ Frozen Ground ❑ Heavy Metals (Cu, Zn, etc.) ❑ PAN ❑ PAN > 10% or 10 lbs. ❑ Total Phosphorus ❑ Failure to Incorporate Manure/Sludge into Bare Soil ❑ Outside of Acceptable Crop Window ❑ Evidence of Wind Drift ❑ Application Outside of Approved Area 12. Crop Type(s): 13. Soil Type(s): 14. Do the receiving crops differ from those designated in the CAWMP? ❑ Yes EK ❑ NA ❑ NE 15. Does the receiving crop and/or land application site need improvement? ❑ Yes �o, ❑ NA ❑ NE 16. Did the facility fail to secure and/or operate per the irrigation design or wettable ❑ Yes No ❑ NA ❑ NE acres determination? 17. Does the facility lack adequate acreage for land application? ❑ Yes to ❑ NA ❑ NE 18. Is there a lack of properly operating waste application equipment? ElYes To ❑ NA ❑ NE Required Records & Documents 19. Did the facility fail to have the Certificate of Coverage & Permit readily available? ❑ Yes ErNo ❑ NA ❑ NE 20. Does the facility fail to have all components of the CAWMP readily available? If yes, check ❑ Yes To ❑ NA ❑ NE the appropriate box. ❑ WUP ❑ Checklists ❑ Design ❑ Maps ❑ Lease Agreements ❑ Other: 21. Does record keeping need improvement? If yes, check the appropriate box below. ❑ Yes ❑'Ko­ ❑ NA ❑ NE ❑ Waste Application ❑ Weekly Freeboard ❑ Waste Analysis ❑ Soil Analysis ❑ Waste Transfers ❑ Weather Code ❑ Rainfall ❑ Stocking ❑ Crop Yield ❑ 120 Minute Inspections ❑ Monthly and 1" Rainfall Inspections ❑ Sludge Survey 22. Did the facility fail to install and maintain a rain gauge? ❑ Yes To NA ❑ NE 23. If selected, did the facility fail to install and maintain rainbreakers on irrigation equipment? ❑ Yes No ❑ NA ❑ NE Page 2 of 3 511212020 Continued Facility Number: - W-0 jDate of Inspection: Z 24. Did the facility fail to calibrate waste application equipment as required by the permit? ❑ Yes ❑ No 25. Is the facility out of compliance with permit conditions related to sludge? If yes, check ❑ Yes ❑ No the appropriate box(es) below. ❑ Failure to complete annual sludge survey ❑ Failure to develop a POA for sludge levels ❑ Non -compliant sludge levels in any lagoon List structure(s) and date of first survey indicating non-compliance: 26. Did the facility fail to provide documentation of an actively certified operator in charge? ❑ Yes ❑ No 27. Did the facility fail to secure a phosphorus loss assessments (PLAT) certification? ❑ Yes ❑ No Other Issues ❑ NA ❑ NE ❑ NA ❑ NE ❑ NA ❑ NE ❑ NA ❑ NE 28. Did the facility fail to properly dispose of dead animals with 24 hours and/or document ❑ Yes ❑ No ❑ NA ❑ NE and report mortality rates that were higher than normal? 29. At the time of the inspection did the facility pose an odor or air quality concern? ❑ Yes ❑ No ❑ NA ❑ NE If yes, contact a regional Air Quality representative immediately. 30. Did the facility fail to notify the Regional Office of emergency situations as required by the ❑ Yes ❑ No ❑ NA ❑ NE permit? (i.e., discharge, freeboard problems, over -application) 31. Do subsurface tile drains exist at the facility? If yes, check the appropriate box below. ❑ Yes ❑ No ❑ NA ❑ NE ❑ Application Field ❑ Lagoon/Storage Pond ❑ Other: 32. Were any additional problems noted which cause non-compliance of the permit or CAWMP? ❑ Yes ❑ No ❑ NA ❑ NE 33. Did the Reviewer/Inspector fail to discuss review/inspection with an on -site representative? ❑ Yes ❑ No ❑ NA ❑ NE 34. Does the facility require a follow-up visit by the same agency? ❑ Yes ❑ No ❑ NA ❑ NE Comments (refer to question ft Explain any YES answers and/or any additional recommendations or any other comments. Use drawings of facility to better explain situations (use additional pages as necessary). Reviewer/Inspector Name: Reviewer/Inspector Signature: Page 3 of 3 XW Phone: �11e520, j ( J Date: 511212020