HomeMy WebLinkAboutNCG551596_Compliance Evaluation Inspection_20230118DocuSign Envelope ID: 9E5D7EC1-9CF3-418B-B39D-2F09836B0BE9
ROY COOPER
Governor
ELIZABETH S. BISER
Secretary
RICHARD E. ROGERS, JR.
Director
Snezana Cvejin
108 Hunter Hill Place
Durham, NC 27517
NORTH CAROLINA
Environmental Quality
January 18, 2023
Subject: Compliance Evaluation Inspection
Single Family Wastewater Treatment System
NPDES General Permit NCG550000
Certificate of Coverage NCG551596
Facility Name: 108 Hunter Hill Place Single Family Residence
Orange County
Dear Snezana Cvejin,
On December 14th, 2022, Joe Myers from the Raleigh Regional Office visited your single-family
residence (SFR) wastewater treatment system to evaluate compliance with the subject General
NPDES Permit. The assistance Gael Chatelain provided over the telephone and during the
inspection was greatly appreciated.
Our records indicate the treatment system consists of a septic tank, an 800-gallon AdvanTex
AX25-RT treatment system and controls, a discharge pipe, and a rip -rap apron for post aeration.
General NPDES Permit NCG550000 and Certificate of Coverage (COC) NCG551596 authorize
the discharge of domestic wastewater from your treatment system to receiving waters designated
as an unnamed tributary to Buck Branch, a class WS-IV NSW stream in subbasin 03-06-06 of
the Cape Fear River Basin. The authorized discharge is in accordance with the effluent limits
and monitoring requirements established within the General Permit. The items below show what
conditions were noted at your facility:
Findings during the inspection were as follows:
1. Treatment system operation: The wastewater treatment system shall be maintained at
all times to prevent seepage of sewage to the surface of the ground.
2. Pumping the septic tank: You are required to inspect the septic tank at least yearly to
determine if solids must be removed or if other maintenance is necessary. Septic tanks
should be pumped out every five years or when the solids level is found to be more than
1/3 of the liquid depth in the septic tank compartment, whichever is greater. A pumping
company can check the status periodically and determine when pumping is required.
After the inspection, Elizabeth Mullins from McFarland Septic provided documentation
via email showing that the septic tank was last pumped in April of 2020. The General
GDE
NORTH CAROLI
NA 1'
Elspoirnerrloremrnment W.i�
North Carolina Department of Environmental Quality I Division of Water Resources
Raleigh Regional Office I 3800 Barrett Drive I Raleigh, North Carolina 27609
919.791.4200
DocuSign Envelope ID: 9E5D7EC1-9CF3-418B-B39D-2F09836B0BE9
NPDES Permit requires the permittee to retain records associated with sewage disposal
activities for a period of at least 5 years.
3. UV Disinfection: Your system uses an ultra -violet (UV) light system for disinfection of
the discharged wastewater. New rules put into place on August 1, 2007 require all SFR
systems to have a means of disinfection (and dechlorination when chlorine tablets are
used to disinfect, if the system was installed since that date). A UV disinfection system
provides effective disinfection and prevents/limits harmful bacteria from discharging to
the environment. Unless the UV disinfection unit is monitored by telemetry, the unit
shall be checked weekly. The lamp(s) and quartz sleeve(s) shall be cleaned or replaced
as needed to ensure proper disinfection of the discharged wastewater.
4. Discharge outlet location. The permittee is required to conduct a visual review of the
outfall location at least twice each year (one at the time of sampling) to ensure that no
visible solids or other obvious evidence of system malfunctioning is observed. Any
visible signs of a malfunctioning system shall be documented and steps taken to correct
the problem. The discharge pipe was visible and accessible the day of the inspection.
Please continue to ensure the outlet is always visible/maintained and cleared of
vegetation, soil and leaves.
Division records indicate the required annual fee ($60 per year) for the period ending July 2023
and due August 2022 has been paid. There are no overdue fees for the subject COC.
Please continue to periodically inspect the wastewater treatment system to ensure the treatment
components are always maintained and in good operating order. You are also reminded to
maintain all monitoring data and associated maintenance records onsite for a minimum of
three years and available for inspection.
If you have questions or comments about this inspection or the requirements to take corrective
action (if applicable), then please contact Joe Myers at 919-791-4248.
Sincerely,
FDocuSigned by:
itUAA,SSA, f. kaUn.ud,
B2916E6AB32144F...
Vanessa E. Manuel, Assistant Regional Supervisor
Water Quality Regional Operations Section
Raleigh Regional Office
Division of Water Resources, NCDEQ
Attachment(s): EPA Water Compliance Inspection Report
Cc: Laserfiche
D_E
NORTH CARCLINA
gaparhneM of Environment,/quay
North Carolina Department of Environmental Quality I Division of Water Resources
512 North Salisbury Street 11611 Mail Service Center I Raleigh, North Carolina 27699-1611
919.707.9000
DocuSign Envelope ID: 9E5D7EC1-9CF3-418B-B39D-2F09836B0BE9
United States Environmental Protection Agency
EPA Washington, D.C. 20460
Water Compliance Inspection Report
Form Approved.
OMB No. 2040-0057
Approval expires 8-31-98
Section A: National Data System Coding (i.e., PCS)
1
21I
671
Transaction Code NPDES yr/mo/day Inspection
IN I 2 IL I 3 I NCG551596 111 121 22/12/14 117
Type
18IOI
I I I I I
Inspector Fac Type
19I S I 2011
I I I I I I I I I I I I I I I I I I I I I I I I I I I I
I I I
I I I 1 I P6
Inspection Work Days Facility Self -Monitoring Evaluation Rating B1 QA Reserved
I 7° I I 711 1 72 I N I 73I I 74 71
I I
1 1 1 1 1 1 180
Section B: Facility Data
Name and Location of Facility Inspected (For Industrial Users discharging to POTW, also include
POTW name and NPDES oermit Number)
108 Hunter Hill Place
108 Hunter Hill PI
Chapel Hill NC 27517
Entry Time/Date
09:30AM 22/12/14
Permit Effective Date
13/08/21
Exit Time/Date
09:45AM 22/12/14
Permit Expiration Date
18/07/31
Name(s) of Onsite Representative(s)/Titles(s)/Phone and Fax Number(s)
///
Other Facility Data
Name, Address of Responsible Official/Title/Phone and Fax Number
Contacted
Snezana Cvejin,108 Hunter Hill PI Chapel Hill NC 27517///
No
Section C: Areas Evaluated During Inspection (Check only those areas evaluated)
Permit Records/Reports Facility Site Review Effluent/Receiving Wate
Section D: Summary of Finding/Comments (Attach additional sheets of narrative and checklists as necessary)
(See attachment summary)
Name(s) and Signature(s) of Inspector(s) Agency/Office/Phone and Fax Numbers Date
Joe M Myers DWR/RRO WQ/919-791-4248/
1— DocuSigned by:
� -r l 1/17/2023
�17,44,
f"Freeaoee...
i—eeen
Signature
ee'
of Management Q A Reviewer Agency/Office/Phone and Fax Numbers Date
DocuSigned by:
1 Valn.t,SSa f. hatnit , 1/17/2023
B2916E6AB32144F...
EPA Form 3560-3 (Rev 9-94) Previous editions are obsolete.
Page# 1
DocuSign Envelope ID: 9E5D7EC1-9CF3-418B-B39D-2F09836B0BE9
sI
NPDES yr/mo/day
N C G 551596 111 121 22/ 12/ 14
117
Inspection Type
18LI
1
Section D: Summary of Finding/Comments (Attach additional sheets of narrative and checklists as necessary)
All records were available and up to date. Septic system appears to be in good working order.
Page# 2
DocuSign Envelope ID: 9E5D7EC1-9CF3-418B-B39D-2F09836B0BE9
Permit: NCG551596
Inspection Date: 12/14/2022
Owner - Facility: 108 Hunter Hill Place
Inspection Type: Compliance Evaluation
Permit Yes No NA NE
(If the present permit expires in 6 months or less). Has the permittee submitted a new El El ❑
application?
Is the facility as described in the permit? • El El El
# Are there any special conditions for the permit? El • El El
Is access to the plant site restricted to the general public? • ❑ ❑ ❑
Is the inspector granted access to all areas for inspection? • El El El
Comment:
Effluent Pipe
Is right of way to the outfall properly maintained?
Are the receiving water free of foam other than trace amounts and other debris?
If effluent (diffuser pipes are required) are they operating properly?
Comment:
Yes No NA NE
• ❑ ❑ ❑
Page# 3