Loading...
HomeMy WebLinkAbout20221266 Ver 1_Copy of Response Submission Completed 12-19-22_20221219Submission Completed https://edocs.deq.nc.gov/Forms/Fonn/showformsubmission/b lc3fc6d-f... Project Submittal Interim Form Updated September 4, 2020 3T ATE NORTH CAROLINA ,5 vl" menfnl Qualify Please note: fields marked with a red asterisk below are required. You will not be able to submit the form until all mandatory questions are answered. Project Type: * Cj For the Record Only (Courtesy Copy) Q New Project Q Modification/New Project with Existing ID Q More Information Response Q Other Agency Comments Q Pre -Application Submittal Q Re-Issuance\Renewal Request Stream or Buffer Appeal Pre -Filing Meeting Date Request was submitted on: Is this supplemental information that needs to be sent to the Corps?* V Yes No Project Contact Information Name: Choplin Farms Who is submitting the information? Email Address: * ihardison@stocksengieering.com Project Information Existing ID #: 202202064 20170001 (no dashes) Existing Version:* 1 1 1 of 3 12/19/2022, 9:35 AM Submission Completed https://edocs.deq.nc.gov/Forms/Fonn/showformsubmission/b lc3fc6d-f... Project Name:* Choplin Farms Is this a public transportation project?* Q Yes Q No Is the project located within a NC DCM Area of Environmental Concern (AEC)?* Yes No Unknown County (ies) * Nash Please upload all files that need to be submited. Click the upload button or drag and drop files here to attach document Comment Response Letter 12-15-22 Kyle Barnes... 26.75KB CE-14.pdf 866.22KB Pre -Construction Notification (PCN) Online Applic... 474.9KB Only pdf or kmz files are accepted. Describe the attachments or add comments: We have attached the comment response letter to Kyle Barnes' comments along with the updated impact map and red -lined application form. We will send this response directly via email as well. * By checking the box and signing box below, I certify that: ■ I, the project proponent, hereby certifies that all information contained herein is true, accurate, and complete to the best of my knowledge and belief. ■ I, the project proponent, hereby requests that the certifying authority review and take action on this CWA 401 certification request within the applicable reasonable period of time. ■ I agree that submission of this online form is a "transaction" subject to Chapter 66, Article 40 of the NC General Statutes (the "Uniform Electronic Transactions Act"); ■ I agree to conduct this transaction by electronic means pursuant to Chapter 66, Article 40 of the NC General Statutes (the "Uniform Electronic Transactions Act"); ■ I understand that an electronic signature has the same legal effect and can be enforced in the same way as a written signature; AND ■ I intend to electronically sign and submit the online form. 2 of 3 12/19/2022, 9:35 AM Submission Completed https://edocs.deq.nc.gov/Forms/Form/showformsubmission/b 1 c3fc6d-f... Signature: * Submittal Date: 3 of 3 12/19/2022, 9:35 AM