Loading...
HomeMy WebLinkAbout20181598 Ver 10_Permit mod drawing_20230112 REQUEST From:Balfour Beatty FOR RFI No.: RFI-20001021-064 Contact Person: Dail Reed INFORMATION Date: 12-5-22 Contract No. C204177 Critical Path:Q Yes ❑ No Project: Havelock Bypass Project Subject: -L- 509+50 LT RIP RAP PLATING AT CULVERT DITCH Drawing References: Attached Request: BBII requests to add Rip-Rap plating to the last+/- 50' of the ditch at Station L 509+50 Lt to the existing Rip-Rap at the Culvert. We believe this will help with the eroding and silt loss at the last segment of the ditch. Please see the attached plan for the proposed Rip-Rap placement area and advise if this installation is acceptable. Response Required By: ASAP Reason for Time Constraint: Request by agencies for measures to be in place. Response: TRANSMISSION TRACKING LOG No. of Pages Date From To Note •! .�� ,;sf I it r,. , • Woo ps lit. PROPOSED • • . 1 1 PLATING 1 09 50 LT ♦ f.