HomeMy WebLinkAbout20181598 Ver 10_Permit mod drawing_20230112 REQUEST From:Balfour Beatty
FOR RFI No.: RFI-20001021-064
Contact Person: Dail Reed
INFORMATION Date: 12-5-22
Contract No. C204177 Critical Path:Q Yes ❑ No
Project: Havelock Bypass Project
Subject: -L- 509+50 LT RIP RAP PLATING AT CULVERT DITCH
Drawing References: Attached
Request:
BBII requests to add Rip-Rap plating to the last+/- 50' of the ditch at Station L 509+50 Lt to the existing
Rip-Rap at the Culvert. We believe this will help with the eroding and silt loss at the last segment of the
ditch.
Please see the attached plan for the proposed Rip-Rap placement area and advise if this installation is
acceptable.
Response Required By: ASAP
Reason for Time Constraint: Request by agencies for measures to be in place.