Loading...
HomeMy WebLinkAbout#5617_11_2012_FINAL5617 Mr. Baron Berry Hyde County Water System 4595 NC Highway 45 Pantego, NC 27860 SUBJECT: North Carolina Wastewater/Groundwater Laboratory Certification (NC WW/GW LC) Initial Inspection Dear Mr. Berry: Enclosed is a report for the inspection performed on November 7, 2012 by Nick Jones. Since the finding(s) cited during the inspection were all corrected prior to the completion of the enclosed report, a response is not required. The staff is commended for taking the initiative in correcting the findings in such a timely manner. For certification maintenance, your laboratory must continue to carry out the requirements set forth in 15A NCAC 2H .0800. Copies of the checklists completed during the inspection may be requested from this office. Thank you for your cooperation during the inspection. If you wish to obtain an electronic copy of this report by electronic mail, or if you have questions or need additional information please contact me at (828) 296-4677. Sincerely, Gary Francies Technical Assistance/Compliance Specialist Laboratory Section Enclosure cc: Nick Jones Master File DENR DWQ Laboratory Section NC Wastewater/Groundwater Laboratory Certification Branch 1623 Mail Service Center, Raleigh, North Carolina 27699-1623 Location: 4405 Reedy Creek Road, Raleigh, North Carolina 27607-6445 Phone: 919-733-3908 t FAX: 919-733-6241 Internet: www.dwglab.oro • An Equal Opportunity \Affirmative Action Employer INSPECTION REPORT ROUTING SHEET To be attached to all inspection reports in-house only. Laboratory Cert. #: Laboratory Name: Inspection Type: Inspector Name(s): Inspection Date: Date Report Completed: Date Forwarded to Reviewer: Reviewed by: Date Review Completed: Cover Letter to use: Unit Supervisor: Date Received: Date Forwarded to Linda: Date Mailed: 5617 Hyde County Water System Field Initial Nick Jones 11 /7/2012 1 /29/2013 1 /29/2013 Jeff Adams /30/2013 ® Insp. Initial ❑ Insp. Reg. ❑ Insp. No Finding ❑ Insp. CP ❑ Corrected Gary Francies 1 /30/2013 WS&Of3 �,- al �� It 5 L LABORATORY NAME: NPDES PERMIT #: ADDRESS: CERTIFICATE #: DATE OF INSPECTION: TYPE OF INSPECTION: AUDITOR(S): LOCAL PERSON(S) CONTACTED: I. INTRODUCTION: On -Site Inspection Report Hyde County Water System NC0077992, NC0068233, NCO088668 4595 NC Highway 45 Pantego, NC 27860 5617 November 7, 2012_ Field Initial, Nick Jones Baron Berry This laboratory was inspected by a representative of the North Carolina Wastewater/Groundwater Laboratory Certification (NC WW/GW LC) program to verify its compliance with the requirements of 15A NCAC 2H .0800 for the analysis of environmental samples. IL GENERAL COMMENTS: The laboratory was clean and well organized. The facility has all the equipment necessary to perform the analyses. The system for traceability of standard and reagent preparation is effective, thorough and easy to follow. Laboratory personnel communicate well with sample collectors and coordinate sample analyses effectively to manage workload and holding times. Proficiency Testing (PT) samples have been analyzed for all certified parameters for the 2012 proficiency testing calendar year and the graded results were 100% acceptable Contracted analyses are performed by Environment 1, Inc. (Certification #10). Current quality assurance policies for Field laboratories and approved procedures for the analysis of the facility's currently certified parameters were provided at the time of the inspection. Quality Control Comment: Error corrections are not performed properly. The WW/GW LC Quality Assurance Policies for Field Laboratories document states: All documentation errors must be corrected by drawing a single line through the error so that the original entry remains legible. Entries shall not be obliterated by erasures or markings. Wite-Out®, correction tape or similar products designed to obliterate documentation are not to be used. Write the correction adjacent to the error. The correction must be initialed by the responsible individual and the date of change documented. All data and log entries must be written in indelible ink. Pencil entries are not acceptable. Notification of acceptable corrective action (No more Wipe-out [sic] will be used to correct errors.) was received by email on 11/26/12. No further response is necessary for this finding. Page 2 #5617 Hyde County Water System Proficiency Testing Comment: The laboratory is not documenting Proficiency Testing (PT) sample analyses in the same manner as environmental samples. The Proficiency Testing Requirements document, February 20, 2012, Revision 1.2. states: All PT sample analyses must be recorded in the daily analysis records as for any environmental sample. This serves as the permanent laboratory record. Notification of acceptable corrective action (PT sample will be documented in the same manner as environmental samples.) was received by email on 11/26/12 and 2/12/2013. No further response is necessary for this finding. PH — Standard Methods, 4500 H B-2000 Comment: The laboratory was not performing a post calibration check buffer analysis. The WW/GW LC Approved Procedure for Field Analysis of pH states: In addition to the calibration buffers, the meter calibration must be verified with a third standard buffer solution. Notification of acceptable corrective action (Calibrating with 4 and 10 s.u. pH buffers and checking with 7 s.u. pH buffer.) was received by email on 11/26/12. No further response is necessary for this finding. IV. PAPER TRAIL INVESTIGATION: The paper trail consisted of comparing field testing records and contract lab reports to Discharge Monitoring Reports (DMRs) submitted to the North Carolina Division of Water Quality. Data were reviewed for Ponzer WTP (NPDES permit # NC0077992), Fairfield WTP (NPDES permit # NC0068233) and Englehard WTP (NPDES permit # NC0088668) for August, September and October 2012. No transcription errors were detected. The facility appears to be doing a good job of accurately transcribing data. V. CONCLUSIONS: All findings noted during the inspection were adequately addressed prior to the completion of this report. The inspector would like to thank the staff for its assistance during the inspection and data review process. No response is required. Report prepared by: Nick Jones Date: January 29, 2013 Report reviewed by: Jeff Adams Date: January 30, 2013